X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-27697

Well Details

Well ID: 37-125-27697
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: North Strabane Township
Operator Name: RICE DRILLING B LLC
Well Pad ID: 152590
Farm/Lease Name: HABANERO 11H
License Status:
Spud Date:
Permit Date: 2015-08-04
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.190414
Longitude: -80.163867

For data sources see[1][2][3]

Well History

Date Event
2015-08-04 New Permit Application
2015-09-08 Performed Spud Operation
2015-12-08 New Permit Application

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0
2016 RICE DRILLING B LLC 429,415.81 61 0.00 0 0.00 0
2017 RICE DRILLING B LLC 2,411,158.42 337 0.00 0 0.00 0
2018 RICE DRILLING B LLC 707,287.00 167 0.00 0 0.00 0
2019 RICE DRILLING B LLC 1,304,250.00 296 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 RICE DRILLING B LLC Drilling Fluid Waste 34.17 Bbl REUSE OTHER THAN ROAD SPREADING
2015 RICE DRILLING B LLC Drilling Fluid Waste 1,338.33 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 RICE DRILLING B LLC Drill Cuttings 810.31 Tons LANDFILL 06-08438
2015 RICE DRILLING B LLC Drill Cuttings 28.81 Tons RESIDUAL WASTE TRANSFER FACILITY 301071
2015 RICE DRILLING B LLC Drill Cuttings 18.51 Tons LANDFILL PAD059087072
2015 RICE DRILLING B LLC Produced Fluid 260.33 Bbl REUSE OTHER THAN ROAD SPREADING
2015 RICE DRILLING B LLC Drill Cuttings 179.00 Tons LANDFILL 100172
2016 RICE DRILLING B LLC Fracturing Fluid Waste 4.29 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2016 RICE DRILLING B LLC Fracturing Fluid Waste 3,633.91 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Drilling Fluid Waste 25.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 3,485.05 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 204.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RICE DRILLING B LLC Produced Fluid 29.17 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 RICE DRILLING B LLC Produced Fluid 10,434.04 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Fracturing Fluid Waste 26.77 Tons LANDFILL 100620
2016 RICE DRILLING B LLC Fracturing Fluid Waste 11,521.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RICE DRILLING B LLC Waste Water Treatment Sludge 8.85 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2016 RICE DRILLING B LLC Produced Fluid 743.99 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RICE DRILLING B LLC Servicing Fluid 1.54 Tons LANDFILL 100172
2016 RICE DRILLING B LLC Synthetic Liner Materials 9.59 Tons LANDFILL 100663
2017 RICE DRILLING B LLC Soil Contaminated by Oil & Gas Related Spills 0.48 Tons LANDFILL 100663
2017 RICE DRILLING B LLC Soil Contaminated by Oil 0.48 Tons LANDFILL 100663
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 78.50 Bbl REUSE (AT WELL PAD)
2017 RICE DRILLING B LLC Produced Fluid 90.89 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RICE DRILLING B LLC Produced Fluid 2,508.00 Bbl REUSE (AT WELL PAD)
2017 RICE DRILLING B LLC Produced Fluid 36.33 Bbl INJECTION DISPOSAL WELL 34-059-24202
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 34.23 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Produced Fluid 3,714.49 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 76.84 Tons LANDFILL 06-08438
2018 RICE DRILLING B LLC Servicing Fluid 0.14 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Produced Fluid 81.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Produced Fluid 61.81 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 84.04 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 9.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Servicing Fluid 15.71 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 RICE DRILLING B LLC Produced Fluid 195.16 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 10.83 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 41.43 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RICE DRILLING B LLC Produced Fluid 17.44 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 228.28 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 559.32 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 121.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 RICE DRILLING B LLC Produced Fluid 12.29 Tons RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2019 RICE DRILLING B LLC Produced Fluid 187.95 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RICE DRILLING B LLC Produced Fluid 38.79 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2406746 Primary Facility 2015-09-14 Drilling/Alteration No Violations Noted Butch’s Rat Hole Services auger rig
2411443 Primary Facility 2015-09-30 Preoperation Inspection No Violations Noted
2418113 Primary Facility 2015-10-22 Drilling/Alteration No Violations Noted Falcon Drilling Rig #29
2420473 Primary Facility 2015-10-29 Drilling/Alteration No Violations Noted Falcon Drilling Rig #29
2431974 Primary Facility 2015-12-10 Drilling/Alteration No Violations Noted Patterson-UTI Drilling Rig #349
2518474 Primary Facility 2016-09-06 Routine/Complete Inspection No Violations Noted
2711920 Primary Facility 2018-03-29 Routine/Complete Inspection No Violations Noted Today I conducted a routine inspection at the Habanero well pad and the following was observed.

Proper signs were displayed identifying the site. The site was stabilized with thick vegetation no erosion observed outside of the LOD. The well heads were maintained, no leaks or fluids around well head. The production tanks were in good condition no leaks , rust or defects observed. Secondary containment for the site was intact and maintained.

2767771 Primary Facility 2018-08-27 Routine/Complete Inspection No Violations Noted Well is shut in. Consolidated Wellsite Services on site and has pulled tubing.
2816614 Primary Facility 2018-12-17 Routine/Complete Inspection No Violations Noted This well appears to be in good condition and well maintained. Operator representative informed the Department that this well is temporarily shut in.

For data sources see[7]

References