X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-26904

Well Details

Well ID: 37-059-26904
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Morgan Township
Operator Name: EQT PROD CO
Well Pad ID: 149569
Farm/Lease Name: WHITE 592919
License Status: Active
Spud Date: 2015-07-21
Permit Date: 2015-06-24
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.988133
Longitude: -80.109344

For data sources see[1][2][3]

Well History

Date Event
2015-06-24 New Permit Application
2015-07-07 Performed Spud Operation
2015-11-03 New Permit Application
2016-03-14 Drilling Completion
2020-01-23 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-07-27 2016-08-04 8,130 13,460,200 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 APB-1 FTS International Gel Breaker Ammonium Persulfate 7727-54-0 95 0.00000151 1.9
LD-2250 Multi-Chem Group Friction reducer Hydrotreated light petroleum distillate 64742-47-8 30 0.0193512 24361.3
Fatty nitrogen derived amides Proprietary 5 0.00322521 4060.22
Sodium chloride 7647-14-5 5 0.00322521 4060.22
Polyacrylate Proprietary 30 0.0193512 24361.3
Ethoxylated alcohol Proprietary 5 0.00322521 4060.22
HVG-1 4.0 FTS International Water Gelling Agent Raffinates, Sorption Process 64741-85-1 55 0.00003803 47.871
Guar Gum 9000-30-0 50 0.00003457 43.519
Quartz 14808-60-7 4 0.00000277 3.482
Isotridecanol, ethoxylated 9043-30-5 2 0.00000138 1.741
MC MX 5-3886 Multi-Chem Group Specialty Brine Calcium Nitrate 13477-34-4 100 0.109369 137686
CS-500-SI FTS International Scale inhibitor Ethylene glycol 107-21-1 10 0.00248267 3125.45
MC MX 8-2544 Multi-Chem Group Live Culture - Nitrate Reducing Bacteria Sodium chloride 7647-14-5 100 0.00990747 12472.6
Sodium nitrate 7631-99-4 5 0.000495374 623.628
LD-2550 Multi-Chem Group Additive Inner salt of alkyl amines Proprietary 60 0.0083547 10517.8
Sodium chloride 7647-14-5 10 0.00139245 1752.96
Water FTS International Carrier/Base Fluid Water 7732-18-5 100 89.225 112,326,000.0
Hydrochloric Acid (15%) FTS International Acidizing Hydrochloric Acid 7647-01-0 15 0.0212784 26787.5
Sand (Proppant) FTS International Proppant Silica Substrate 14808-60-7 100 10.4103 13,105,500.0
CI-150 FTS International Acid corrosion inhibitor Quaternary ammonium compound Proprietary 10 0.00002625 33.046
Dimethylformamide 68-12-2 10 0.00002625 33.046
Isopropanol 67-63-0 30 0.00007875 99.139
Ethylene glycol 107-21-1 30 0.00007875 99.139
Aromatic aldehyde Proprietary 10 0.00002625 33.046
Organic amine resin salt Proprietary 30 0.00007875 99.139

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 EQT PROD CO 0.00 0 0.00 0 0.00 0
2016 EQT PROD CO 0.00 0 0.00 0 0.00 0
2017 EQT PROD CO 2,439,390.00 289 0.00 0 0.00 0
2018 EQT PROD CO 1,338,212.00 365 0.00 0 0.00 0
2019 EQT PROD CO 853,947.00 361 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 EQT PROD CO Drill Cuttings 722.30 Tons LANDFILL 100419
2016 EQT PROD CO Fracturing Fluid Waste 29.26 Bbl RESIDUAL WASTE PROCESSING FACILITY 2014-541
2016 EQT PROD CO Drilling Fluid Waste 303.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Filter Socks 0.12 Tons LANDFILL 100277
2016 EQT PROD CO Other Oil & Gas Wastes 780.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Fracturing Fluid Waste 390.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Soil Contaminated by Oil & Gas Related Spills 1.31 Tons LANDFILL 100277
2016 EQT PROD CO Synthetic Liner Materials 2.03 Tons LANDFILL 100277
2016 EQT PROD CO Fracturing Fluid Waste 53.45 Tons LANDFILL 100277
2016 EQT PROD CO Drill Cuttings 935.27 Tons LANDFILL 100419
2016 EQT PROD CO Waste Water Treatment Sludge 28.60 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2016 EQT PROD CO Other Oil & Gas Wastes 240.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 EQT PROD CO Other Oil & Gas Wastes 9.84 Tons LANDFILL 100419
2017 EQT PROD CO Produced Fluid 787.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EQT PROD CO Produced Fluid 1.15 Tons CENT WASTE TRT FAC NPDES EPA ID: 748-163
2017 EQT PROD CO Other Oil & Gas Wastes 60.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Produced Fluid 1,601.28 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Produced Fluid 2.38 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2017 EQT PROD CO Produced Fluid 1.15 Tons CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2018 EQT PROD CO Produced Fluid 827.76 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 34.55 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Produced Fluid 15.74 Bbl INJECTION DISPOSAL WELL 34-031-27177
2018 EQT PROD CO Produced Fluid 15.74 Bbl INJECTION DISPOSAL WELL 34-157-25511
2018 EQT PROD CO Synthetic Liner Materials 46.16 Tons LANDFILL 100277
2018 EQT PROD CO Produced Fluid 78.63 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 EQT PROD CO Produced Fluid 259.02 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Other Oil & Gas Wastes 21.82 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Other Oil & Gas Wastes 106.84 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 14.61 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Other Oil & Gas Wastes 10.91 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 EQT PROD CO Produced Fluid 1,312.87 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 102.32 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2393979 Primary Facility 2015-07-08 Drilling/Alteration No Violations Noted Set conductor @ 53 ' ( KB ) 7/7/2015.
2406186 Primary Facility 2015-08-13 Routine/Partial Inspection No Violations Noted On 8/13/15, I met with two EQT representatives to take samples from an outside well adjacent to the White Pad.
2430549 Primary Facility 2015-10-23 Administrative/File Review No Violations Noted Administrative review of lab results on 10/23/15 indicates that water supply appears to have been impacted by oil & gas activity. Results and documentation forwarded for final determination.
2440063 Primary Facility 2015-11-23 Routine/Complete Inspection No Violations Noted On 11/23/15, I performed a routine complete inspection of the White Pad and made the following observations:
2469086 Primary Facility 2016-03-07 Drilling/Alteration No Violations Noted Horizontal Marcellus, Rig start moving on to White 592919 tonight.
2469090 Primary Facility 2016-03-16 Drilling/Alteration No Violations Noted Horizontal Marcellus, Rig drilling on fluid @ 16,615' (TD). Running 51/2" Production Casing and cementing today.
2469306 Primary Facility 2016-03-24 Administrative/File Review No Violations Noted

On 03/24/16 I conducted an administrative inspection of the White pad in response to a spill by EQT off the White pad. When the rig was being moved on 03/15/16 at 2000 hours a mixture of produced water and drilling mud was spilled onto Bowser Road. EQT has cleaned up the spill in compliance with DEP spill policy.

2471135 Primary Facility 2016-03-14 Incident- Response to Accident or Event No Violations Noted

On 03/14/16 at approximately 1330 hours I conducted an incident response inspection in response to a spill from 03/12/16 at the EQT White pad.

On 03/12/16 at 0305 hours a brine spill occurred to the well pad surface off containment when a truck was loading and the sight glass broke. Initial estimate by the truck driver was 3-5 barrels of fluid, but EQT revised the estimate to 30-40 gallons once EQT staff were able to evaluate the spill. A vacuum truck removed standing fluid and excavation occurred at first light on 03/12/16. An area approximately 30’30’x6” was delineated with the use of a soil conductivity probe and excavated. The impacted material was placed in a lined roll off box for disposal.

2476636 Primary Facility 2016-04-08 Administrative/File Review No Violations Noted

On 04/08/16 at approximately 0800 hours I conducted an administrative review of the EQT White pad. A spill occurred at the site on 03/12/16 of approximately 30-40 gallons of produced fluid. On 03/14/16 I performed an inspection of the site and the spill area had been excavated and the material placed into a lined roll off box. The area of the spill was then filled with fresh gravel. The spill was cleaned up in compliance with DEP spill policy.

2503827 Primary Facility 2016-06-13 Drilling/Alteration No Violations Noted Horizontal Marcellus, Moving on site prepairing to start fracing.
2505287 Primary Facility 2016-07-22 Drilling/Alteration No Violations Noted Horizontal Marcellus, Fracing is completed on this well.
2530498 Primary Facility 2016-09-23 Routine/Complete Inspection No Violations Noted On 09/23/14 at approximately 0845 hours I conducted a routine complete inspection of the White Unit. The Act 9 sign was in place and all required documents were present at the site. There were no signs of erosion at the time of inspection. There were no violations observed at the time of inspection.
2538989 Primary Facility 2016-11-16 Incident- Response to Accident or Event In Compliance with Policy Incident response conducted as a result of an operator notification.
2783219 Primary Facility 2018-10-03 Site Restoration No Violations Noted A site restoration inspection was conducted in response to an NOT submittal from EQT.

The Act 9 sign was in place and all required documents were present at the site. The production equipment appeared to be in good condition. PCSM features were installed and appeared to be functioning. The site was well vegetated and meets the requirement of uniform 70% vegetative cover. The NOT is approved.

For data sources see[8]

References