X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-26902

Well Details

Well ID: 37-059-26902
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Morgan Township
Operator Name: EQT PROD CO
Well Pad ID: 149569
Farm/Lease Name: WHITE 592917
License Status: Active
Spud Date: 2015-08-08
Permit Date: 2015-06-24
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.988211
Longitude: -80.109308

For data sources see[1][2][3]

Well History

Date Event
2015-06-24 New Permit Application
2015-07-07 Performed Spud Operation
2015-11-03 New Permit Application
2016-05-06 Drilling Completion
2020-01-23 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-06-26 2016-07-06 8,136 15,278,500 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 APB-1 FTS International Gel Breaker Ammonium Persulfate 7727-54-0 95 0.00004873 69.13
CS-500-SI FTS International Scale inhibitor Ethylene glycol 107-21-1 10 0.0025021 3549.69
MC MX 8-2544 Multi-Chem Group Live Culture - Nitrate Reducing Bacteria Sodium chloride 7647-14-5 100 0.0100283 14227
Sodium nitrate 7631-99-4 5 0.000501414 711.348
Sand (Proppant) FTS International Proppant Silica Substrate 14808-60-7 100 9.75412 13,838,000.0
MC MX 5-3886 Multi-Chem Group Specialty Brine Calcium Nitrate 13477-34-4 100 0.110181 156312
HVG-1 4.0 FTS International Water Gelling Agent Guar Gum 9000-30-0 50 0.000171784 243.707
Quartz 14808-60-7 4 0.00001374 19.497
Raffinates, Sortion Process 64741-85-1 55 0.000188963 268.078
Isotridecanol, ethoxylated 9043-30-5 2 0.00000687 9.748
Hydrochloric Acid (15%) FTS International Acidizing Hydrochloric Acid 7647-01-0 15 0.0212421 30135.9
CI-150 FTS International Acid corrosion inhibitor Quaternary ammonium compound Proprietary 10 0.00000310 4.4
Isopropanol 67-63-0 30 0.00000930 13.2
Aromatic aldehyde Proprietary 10 0.00000310 4.4
Ethylene glycol 107-21-1 30 0.00000930 13.2
Organic amine resin salt Proprietary 30 0.00000930 13.2
Dimethylformamide 68-12-2 10 0.00000310 4.4
LD-2550 Multi-Chem Group Additive Inner salt of alkyl amines Proprietary 60 0.00984461 13966.4
Sodium chloride 7647-14-5 10 0.00164077 2327.73
LD-2250 Multi-Chem Group Friction reducer Sodium chloride 7647-14-5 5 0.00353782 5019.05
Fatty nitrogen derived amides Proprietary 5 0.00353782 5019.05
Ethoxylated alcohol Proprietary 5 0.00353782 5019.05
Hydrotreated light petroleum distillate 64742-47-8 30 0.0212269 30114.3
Polyacrylate Proprietary 30 0.0212269 30114.3
Water FTS International Carrier/Base Fluid Water 7732-18-5 100 89.8714 127,499,000.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 EQT PROD CO 0.00 0 0.00 0 0.00 0
2016 EQT PROD CO 0.00 0 0.00 0 0.00 0
2017 EQT PROD CO 2,211,388.00 283 0.00 0 0.00 0
2018 EQT PROD CO 1,044,025.00 365 0.00 0 0.00 0
2019 EQT PROD CO 797,465.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 EQT PROD CO Drilling Fluid Waste 180.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 EQT PROD CO Drill Cuttings 722.30 Tons LANDFILL 100419
2015 EQT PROD CO Produced Fluid 80.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Fracturing Fluid Waste 29.26 Bbl RESIDUAL WASTE PROCESSING FACILITY 2014-541
2016 EQT PROD CO Drilling Fluid Waste 2,400.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Other Oil & Gas Wastes 936.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Synthetic Liner Materials 4.39 Tons LANDFILL 100419
2016 EQT PROD CO Soil Contaminated by Oil & Gas Related Spills 1.31 Tons LANDFILL 100277
2016 EQT PROD CO Synthetic Liner Materials 2.03 Tons LANDFILL 100277
2016 EQT PROD CO Fracturing Fluid Waste 53.45 Tons LANDFILL 100277
2016 EQT PROD CO Drill Cuttings 590.89 Tons LANDFILL 100419
2016 EQT PROD CO Waste Water Treatment Sludge 28.60 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2016 EQT PROD CO Other Oil & Gas Wastes 12.51 Tons LANDFILL 100419
2016 EQT PROD CO Drill Cuttings 35.43 Tons LANDFILL 100277
2016 EQT PROD CO Produced Fluid 130.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW010
2016 EQT PROD CO Produced Fluid 275.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 EQT PROD CO Other Oil & Gas Wastes 180.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Produced Fluid 591.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EQT PROD CO Produced Fluid 2.38 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2017 EQT PROD CO Produced Fluid 3,843.28 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 34.55 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Produced Fluid 13.87 Bbl INJECTION DISPOSAL WELL 34-157-25511
2018 EQT PROD CO Produced Fluid 696.56 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Produced Fluid 13.87 Bbl INJECTION DISPOSAL WELL 34-031-27177
2018 EQT PROD CO Produced Fluid 62.18 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 EQT PROD CO Synthetic Liner Materials 34.89 Tons LANDFILL 100277
2018 EQT PROD CO Produced Fluid 144.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Other Oil & Gas Wastes 128.66 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Other Oil & Gas Wastes 10.91 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 EQT PROD CO Produced Fluid 484.30 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Produced Fluid 148.57 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 EQT PROD CO Produced Fluid 1,996.95 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 100.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2393961 Primary Facility 2015-07-08 Drilling/Alteration No Violations Noted Set conductor @ 53 ' ( KB ) 7/6/2015.
2406184 Primary Facility 2015-08-13 Routine/Partial Inspection No Violations Noted On 8/13/15, I met with two EQT representatives to take samples from an outside well adjacent to the White Pad.
2408763 Primary Facility 2015-08-18 Drilling/Alteration No Violations Noted Horizontal Marcellus, Drilling on air @ 1011' (TD). Setting one casing string to protect water and coal in mined out Pittsburgh Coal area.Had to run 1" tubing to top of basket and cement to surface (8/9'2015).
2408806 Primary Facility 2015-08-06 Drilling/Alteration No Violations Noted Horizontal Marcellus, Drilling on air @ 3525' (TD).Setting Intermediate Casing and cemeting tonight ( 8/5/2015).
2430544 Primary Facility 2015-10-23 Administrative/File Review No Violations Noted Administrative review of lab results on 10/23/15 indicates that water supply appears to have been impacted by oil & gas activity. Results and documentation forwarded for final determination.
2440059 Primary Facility 2015-11-23 Routine/Complete Inspection No Violations Noted On 11/23/15, I performed a routine complete inspection of the White Pad and made the following observations:
2469098 Primary Facility 2016-03-21 Drilling/Alteration No Violations Noted Horizontal Marcellus,Drilling on air @ 8982' today.
2469291 Primary Facility 2016-03-24 Administrative/File Review No Violations Noted

On 03/24/16 I conducted an administrative inspection of the White pad in response to a spill by EQT off the White pad. When the rig was being moved on 03/15/16 at 2000 hours a mixture of produced water and drilling mud was spilled onto Bowser Road. EQT has cleaned up the spill in compliance with DEP spill policy.

2476627 Primary Facility 2016-04-08 Administrative/File Review No Violations Noted

On 04/08/16 at approximately 0800 hours I conducted an administrative review of the EQT White pad. A spill occurred at the site on 03/12/16 of approximately 30-40 gallons of produced fluid. On 03/14/16 I performed an inspection of the site and the spill area had been excavated and the material placed into a lined roll off box. The area of the spill was then filled with fresh gravel. The spill was cleaned up in compliance with DEP spill policy.

2487655 Primary Facility 2016-04-29 Drilling/Alteration No Violations Noted Horizontal Marcellus, Triple rig moving onto well location today.
2487656 Primary Facility 2016-05-05 Drilling/Alteration No Violations Noted Horizontal Marcellus, Triple rig drilling on fluid @ 17,650' (TD). Setting 51/2" Prod. Casing and cementing tonight.
2503829 Primary Facility 2016-06-13 Drilling/Alteration No Violations Noted Horizontal Marcellus, Moving on site prepairing to start fracing.
2505282 Primary Facility 2016-07-22 Drilling/Alteration No Violations Noted Horizontal Marcellus, Fracing is completed on this well.
2530488 Primary Facility 2016-09-23 Routine/Complete Inspection No Violations Noted On 09/23/14 at approximately 0845 hours I conducted a routine complete inspection of the White Unit. The Act 9 sign was in place and all required documents were present at the site. There were no signs of erosion at the time of inspection. There were no violations observed at the time of inspection.
2538987 Primary Facility 2016-11-16 Incident- Response to Accident or Event In Compliance with Policy Incident response conducted as a result of an operator notification.
2783215 Primary Facility 2018-10-03 Site Restoration No Violations Noted A site restoration inspection was conducted in response to an NOT submittal from EQT.

The Act 9 sign was in place and all required documents were present at the site. The production equipment appeared to be in good condition. PCSM features were installed and appeared to be functioning. The site was well vegetated and meets the requirement of uniform 70% vegetative cover. The NOT is approved.

For data sources see[8]

References