X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-25498

Well Details

Well ID: 37-059-25498
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Morgan Township
Operator Name: EQT PROD CO
Well Pad ID: 149569
Farm/Lease Name: WHITE 590380
License Status:
Spud Date:
Permit Date: 2010-05-11
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 39.988167
Longitude: -80.109444

For data sources see[1][2][3]

Well History

Date Event
2010-05-11 New Permit Application
2010-05-13 Performed Spud Operation
2010-06-10 Drilling Completion
2010-12-02 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2010-09-28 2010-09-28 8,130 6,505,716

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HCl Halliburtion 15 HCl Acid Hydrochloric Acid 7647-01-0 28.0 0.0637
GBW-30 Halliburtion Enzyme Breaker Hemicellulase Enzyme 9012-54-8 15.0 0.00001000
BA-40L Halliburtion Buffer Potassium carbonate 584-08-7 60.0 0.01428
SP Breaker Halliburtion Oxidizing Breaker Sodium Persulfate 7775-27-1 100.0 0.0001
Halliburtion Gelling Agent Methanol 67-56-1 60.0 0.0006
Paraffinic Solvent N/A 30.0 0.0063
Propargyl Alcohol 107-19-7 10.0 0.0001
BE-9 Halliburtion Biocide Tributyl tetradecyl phosphonium chloride 81741-28-8 10.0 0.0054
LGC-35 Halliburtion Gelling Agent Polysaccharide N/A 30.0 0.0063
FR-66 Halliburtion Friction Reducer Hydrotreated light petroleum distillate 64742-47-8 30.0 0.0255
Halliburtion Corrosion Inhibitor
LP-65 Halliburtion Scale Inhibitor Ammonium chloride 12125-02-9 10.0 0.0023

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 EQT PROD CO 0.00 0 0.00 0 0.00 0
2011 EQT PROD CO 1,327,942.00 219 0.00 35 0.00 35
2012 EQT PROD CO 1,060,668.00 366 0.00 0 0.00 0
2013 EQT PROD CO 809,188.00 365 0.00 0 0.00 0
2014 EQT PROD CO 560,283.00 365 0.00 0 0.00 0
2015 EQT PROD CO 370,766.00 349 0.00 0 0.00 0
2016 EQT PROD CO 399,267.00 304 0.00 0 0.00 0
2017 EQT PROD CO 472,277.00 365 0.00 0 0.00 0
2018 EQT PROD CO 298,420.00 361 0.00 0 0.00 0
2019 EQT PROD CO 235,116.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 EQT PROD CO Produced Fluid 150.00 Bbl IDENTIFY METHOD IN COMMENTS
2010 EQT PROD CO Drilling Fluid Waste 335.00 Bbl IDENTIFY METHOD IN COMMENTS
2011 EQT PROD CO Produced Fluid 454.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-121-24037
2011 EQT PROD CO Produced Fluid 750.00 Bbl INJECTION DISPOSAL WELL 34-083-24137
2011 EQT PROD CO Produced Fluid 3,428.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-167-28466
2011 EQT PROD CO Produced Fluid 905.00 Bbl INJECTION DISPOSAL WELL 34-117-23388
2011 EQT PROD CO Produced Fluid 1,464.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2011 EQT PROD CO Produced Fluid 112.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2011 EQT PROD CO Produced Fluid 1,355.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 EQT PROD CO Produced Fluid 140.00 Bbl INJECTION DISPOSAL WELL 34-009-22704
2011 EQT PROD CO Fracing Fluid Waste 1,115.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 EQT PROD CO Produced Fluid 233.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-121-23390
2012 EQT PROD CO Produced Fluid 342.00 Bbl INJECTION DISPOSAL WELL 34-083-24137
2012 EQT PROD CO Produced Fluid 3,195.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 EQT PROD CO Produced Fluid 220.00 Bbl INJECTION DISPOSAL WELL 34-167-28466
2012 EQT PROD CO Produced Fluid 161.00 Bbl INJECTION DISPOSAL WELL 34-117-23388
2012 EQT PROD CO Produced Fluid 1,505.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2013 EQT PROD CO Produced Fluid 4,907.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 EQT PROD CO Produced Fluid 105.00 Bbl INJECTION DISPOSAL WELL 34-083-24137
2014 EQT PROD CO Produced Fluid 3,054.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 EQT PROD CO Fracturing Fluid Waste 10.92 Tons LANDFILL 100419
2015 EQT PROD CO Produced Fluid 1,095.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Other Oil & Gas Wastes 224.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Produced Fluid 1,979.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 EQT PROD CO Produced Fluid 830.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 EQT PROD CO Produced Fluid 5,272.40 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Produced Fluid 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2017 EQT PROD CO Produced Fluid 2,040.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EQT PROD CO Other Oil & Gas Wastes 370.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Produced Fluid 40.84 Bbl INJECTION DISPOSAL WELL 34-157-25511
2018 EQT PROD CO Other Oil & Gas Wastes 59.10 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Produced Fluid 201.36 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Produced Fluid 62.57 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Produced Fluid 22.41 Bbl INJECTION DISPOSAL WELL 34-157-25511
2018 EQT PROD CO Produced Fluid 13.97 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 EQT PROD CO Produced Fluid 2.33 Bbl INJECTION DISPOSAL WELL 34-031-27177
2019 EQT PROD CO Produced Fluid 450.64 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Other Oil & Gas Wastes 21.82 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 EQT PROD CO Produced Fluid 3.31 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Other Oil & Gas Wastes 117.75 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 71.56 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1984853 Primary Facility 2011-06-02 Routine/Complete Inspection No Violations Noted
2016854 Primary Facility 2011-10-17 Routine/Complete Inspection No Violations Noted WELL IS HOOKED UP AND PRODUCING.
2063675 Primary Facility 2012-04-24 Routine/Complete Inspection No Violations Noted SITE LOOKED GOOD AT TIME OF INSPECTION.
2317056 Primary Facility 2014-08-04 Routine/Complete Inspection No Violations Noted Well in production. Well in compliance.
2406176 Primary Facility 2015-08-13 Routine/Partial Inspection No Violations Noted On 8/13/15, I met with two EQT representatives to take samples from an outside well adjacent to the White Pad.
2430539 Primary Facility 2015-10-23 Administrative/File Review No Violations Noted Administrative review of lab results on 10/23/15 indicates that water supply appears to have been impacted by oil & gas activity. Results and documentation forwarded for final determination.
2440047 Primary Facility 2015-11-23 Routine/Complete Inspection No Violations Noted On 11/23/15, I performed a routine complete inspection of the White Pad and made the following observations:
2469300 Primary Facility 2016-03-24 Administrative/File Review No Violations Noted

On 03/24/16 I conducted an administrative inspection of the White pad in response to a spill by EQT off the White pad. When the rig was being moved on 03/15/16 at 2000 hours a mixture of produced water and drilling mud was spilled onto Bowser Road. EQT has cleaned up the spill in compliance with DEP spill policy.

2471131 Primary Facility 2016-03-14 Incident- Response to Accident or Event No Violations Noted

On 03/14/16 at approximately 1330 hours I conducted an incident response inspection in response to a spill from 03/12/16 at the EQT White pad.

On 03/12/16 at 0305 hours a brine spill occurred to the well pad surface off containment when a truck was loading and the sight glass broke. Initial estimate by the truck driver was 3-5 barrels of fluid, but EQT revised the estimate to 30-40 gallons once EQT staff were able to evaluate the spill. A vacuum truck removed standing fluid and excavation occurred at first light on 03/12/16. An area approximately 30’30’x6” was delineated with the use of a soil conductivity probe and excavated. The impacted material was placed in a lined roll off box for disposal.

2476634 Primary Facility 2016-04-08 Administrative/File Review No Violations Noted

On 04/08/16 at approximately 0800 hours I conducted an administrative review of the EQT White pad. A spill occurred at the site on 03/12/16 of approximately 30-40 gallons of produced fluid. On 03/14/16 I performed an inspection of the site and the spill area had been excavated and the material placed into a lined roll off box. The area of the spill was then filled with fresh gravel. The spill was cleaned up in compliance with DEP spill policy.

2530495 Primary Facility 2016-09-23 Routine/Complete Inspection No Violations Noted On 09/23/14 at approximately 0845 hours I conducted a routine complete inspection of the White Unit. The Act 9 sign was in place and all required documents were present at the site. There were no signs of erosion at the time of inspection. There were no violations observed at the time of inspection.
2538983 Primary Facility 2016-11-16 Incident- Response to Accident or Event In Compliance with Policy Incident response conducted as a result of an operator notification.
2783204 Primary Facility 2018-10-03 Site Restoration No Violations Noted A site restoration inspection was conducted in response to an NOT submittal from EQT.

The Act 9 sign was in place and all required documents were present at the site. The production equipment appeared to be in good condition. PCSM features were installed and appeared to be functioning. The site was well vegetated and meets the requirement of uniform 70% vegetative cover. The NOT is approved.

For data sources see[8]

References