Well ID: 37-059-25376
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Morgan Township
Operator Name: EQT PROD CO
Well Pad ID: 151352
Farm/Lease Name: HILDEBRAND 590206
License Status:
Spud Date:
Permit Date: 2009-12-14
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 39.978389
Longitude: -80.094194

For data sources see[1][2][3]

Well History

Date Event
2009-12-14 New Permit Application
2010-01-26 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 EQT PROD CO 0.00 0 0.00 0 0.00 0
2010 EQT PROD CO 984,450.00 153 0.00 153 0.00 0
2011 EQT PROD CO 1,124,327.00 365 0.00 181 0.00 181
2012 EQT PROD CO 725,066.00 366 0.00 0 0.00 0
2013 EQT PROD CO 516,147.00 365 0.00 0 0.00 0
2014 EQT PROD CO 382,109.00 365 0.00 0 0.00 0
2015 EQT PROD CO 315,776.00 362 0.00 0 0.00 0
2016 EQT PROD CO 365,166.00 366 0.00 0 0.00 0
2017 EQT PROD CO 309,581.00 365 0.00 0 0.00 0
2018 EQT PROD CO 269,240.00 365 0.00 0 0.00 0
2019 EQT PROD CO 178,252.00 364 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 EQT PROD CO Produced Fluid 165.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2010 EQT PROD CO Produced Fluid 203.00 Bbl IDENTIFY METHOD IN COMMENTS
2010 EQT PROD CO Produced Fluid 1,378.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-167-28466
2010 EQT PROD CO Produced Fluid 878.00 Bbl IDENTIFY METHOD IN COMMENTS 34-167-29359
2010 EQT PROD CO Produced Fluid 264.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-121-24037
2010 EQT PROD CO Produced Fluid 98.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-167-28462
2011 EQT PROD CO Produced Fluid 1,005.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-121-24037
2011 EQT PROD CO Produced Fluid 200.00 Bbl INJECTION DISPOSAL WELL 34-083-24137
2011 EQT PROD CO Produced Fluid 114.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-059-24067
2011 EQT PROD CO Produced Fluid 2,105.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-167-28466
2011 EQT PROD CO Produced Fluid 670.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 EQT PROD CO Produced Fluid 1,110.00 Bbl INJECTION DISPOSAL WELL 34-117-23388
2011 EQT PROD CO Produced Fluid 804.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2011 EQT PROD CO Produced Fluid 114.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2011 EQT PROD CO Produced Fluid 817.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 EQT PROD CO Fracing Fluid Waste 24.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 EQT PROD CO Produced Fluid 125.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-121-23390
2012 EQT PROD CO Produced Fluid 653.00 Bbl INJECTION DISPOSAL WELL 34-083-24137
2012 EQT PROD CO Produced Fluid 2,331.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 EQT PROD CO Produced Fluid 114.00 Bbl INJECTION DISPOSAL WELL 34-167-28462
2012 EQT PROD CO Fracing Fluid Waste 89,676.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 EQT PROD CO Produced Fluid 179.00 Bbl INJECTION DISPOSAL WELL 34-117-23388
2012 EQT PROD CO Produced Fluid 361.00 Bbl INJECTION DISPOSAL WELL 34-167-28466
2012 EQT PROD CO Fracing Fluid Waste 10,776.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2012 EQT PROD CO Produced Fluid 224.00 Bbl INJECTION DISPOSAL WELL 34-167-29577
2013 EQT PROD CO Produced Fluid 3,615.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 EQT PROD CO Fracing Fluid Waste 3,534.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 EQT PROD CO Fracing Fluid Waste 4,219.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 EQT PROD CO Produced Fluid 2,318.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 EQT PROD CO Produced Fluid 110.00 Bbl INJECTION DISPOSAL WELL 34-031-27177
2015 EQT PROD CO Fracing Fluid Waste 260.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 EQT PROD CO Produced Fluid 5,451.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Servicing Fluid 55.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Produced Fluid 968.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 EQT PROD CO Other Oil & Gas Wastes 10.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Produced Fluid 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EQT PROD CO Produced Fluid 35.22 Bbl INJECTION DISPOSAL WELL 34-157-25511
2017 EQT PROD CO Produced Fluid 928.46 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 47.13 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Produced Fluid 194.46 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 100.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Produced Fluid 8.24 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 EQT PROD CO Produced Fluid 50.38 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Produced Fluid 8.05 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Other Oil & Gas Wastes 50.00 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 24.14 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 EQT PROD CO Produced Fluid 333.25 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Other Oil & Gas Wastes 18.57 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1866806 Primary Facility 2010-02-24 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
1877855 Primary Facility 2010-04-06 Follow-up Inspection No Violations Noted HORIZONTAL MARCELLUS
1878381 Primary Facility 2010-01-29 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
1890263 Primary Facility 2010-05-21 Routine/Complete Inspection Violation(s) Noted § 78.57(a) violation. Production fluids were allowed to escape the production pit onto the ground and leave the work site.
1922454 Primary Facility 2010-06-29 Compliance Evaluation No Violations Noted
2083847 Primary Facility 2012-07-12 Complaint Inspection No Violations Noted
2123057 Primary Facility 2012-06-18 Complaint Inspection No Violations Noted Water Well Complaint - No Land Owners at residence. Water well is connected to water to fresh
2152273 Primary Facility 2013-03-14 Complaint Inspection No Violations Noted The Department was at the above referenced Marcellus Wells to conduct a follow-up Complaint Inspection. The Department sampled the spring in the cattle field next to the access road. The sample results have not all been reported at this point. Sample results will be provided to all parties involved. The soil pile from the sediment trap is still on site and covered with plastic.
2595654 Primary Facility 2017-04-05 Follow-up Inspection No Violations Noted On 04/05/17 at approximately 1200 hours I along with WQSS John Carson and Environmental Engineer Donna Davis conducted a follow up inspection of the Hildebrand site in response to an NOV issued on 03/07/17.

The leak around the riser structure in the rain garden had been repaired. The rain garden appears to contain sediment from poorly stabilized adjacent slopes. The slopes appeared to be failing, depositing sediment into the rain garden and causing a loss of volume. Additionally, erosion was occurring along the southwestern rip rap channel into the rain garden. It is recommended that this be repaired to prevent further erosion and volume loss. It is requested that EQT contact Donna Davis to discuss maintenance of the BMP. It is requested that EQT contact Donna Davis regarding the cross drain causing erosion into the pond on UNT to Castile Run.

The silt socks that were previously undercut or overtopped had been maintained to prevent undercutting, but sediment was still close to or at the top of the silt soc

2613976 Primary Facility 2017-06-27 Follow-up Inspection No Violations Noted A follow up inspection was conducted, since previously cited violations are still outstanding. An excavator was present on the site making repairs to the rain garden. The erosion that had occurred in the area of the removed sediment trap appeared to have been repaired, but erosion was still occurring in the area. Silt socks had been reconfigured to prevent further erosion. Portions of the area upslope of the removed sediment trap had increased vegetative cover since the last NOV was issued. The access road appeared to be washing out on the bend in the access road. The slide in the well pad slope was still present. Additional repairs on the site appeared to be occurring at the time of inspection.
2638132 Primary Facility 2017-09-20 Site Restoration No Violations Noted A site inspection was conducted in response to EQT requesting a meeting to discuss site vegetation and silt sock removal. The Act 9 sign was in place and all required documents were present at the site. The site overall was well vegetated. The erosion channel from near the access road to the location of the removed sediment trap was vegetated. It is recommended that the erosion channel be repaired to original grade, seeded, and mulched. The rain garden appeared to be in good condition. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection.
2692683 Primary Facility 2018-01-29 Site Restoration No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site entrance exhibited signs of access road erosion (see photographs). It appeared water was overflowing the culvert and removing material from the access road near the Act 9 sign.

The site did not exhibit uniform 70% vegetative cover. Areas of poor or no vegetative cover were observed. Erosion was occurring along the access road below the check dams in the location of the removed sediment trap (see photographs).

The site does not meet the requirements for permit termination. The NOT is denied.

2760136 Primary Facility 2018-08-01 Site Restoration No Violations Noted A site restoration inspection was conducted in response to an NOT submittal from EQT Production Co. The Act 9 sign was in place and all required documents were present.

Erosion of the access road was observed at the site entrance. Metal grates were in place over a large channel in the access road (see photographs). The channel continued off the site parallel to Bowser Road heading South. Erosion of the access road along the right side was also observed (see photographs). Erosion was observed adjacent to the left side of the access road below a neighboring pond, exposing a black pipe.

Poorly vegetated soil and accelerated erosion were observed where silt sock was removed in the area of the restored sediment trap. Multiple small erosion rills were observed in the vegetated area upslope. It appeared the rills existed and were not repaired prior to the vegetation grew and covered the rills. It is recommended the accelerated erosion is repaired.

The site does not meet the requirements for permit terminatio

2798829 Primary Facility 2018-11-06 Routine/Complete Inspection No Violations Noted
2809659 Primary Facility 2018-11-14 Site Restoration No Violations Noted A meeting was requested by EQT to evaluate the site for NOT criteria. The Act 9 sign was in place and all required documents were present at the site. PCSM was installed and appeared to be functioning. Site vegetation met the requirement of 70% uniform vegetative cover. The site meets the requirements for permit termination. The NOT is approved.
2849626 Primary Facility 2019-02-25 Routine/Complete Inspection No Violations Noted On 02/25/19 at approximately 1220 hours I conducted an inspection of the site. It appeared recent heavy rains had caused the pit collecting water for the culvert to overflow at the site entrance, causing wash out of the access road. Ice was present on Bowser road and appeared to have been caused by water leaving the well site.

Water from the adjacent private pond was eroding through the pond bank along the pipe leading to the culvert inlet. The inlet from the pond was clogged with debris, causing water to divert around the pipe and erode alongside it.

The culvert appeared to be functioning at the time of inspection.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1890263 589125 05/21/2010 2010-05-21 78.57 - Failure to post pit approval number Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
589125 259023 NOV - Notice of Violation Comply/Closed 2010-09-14
589125 267122 CACP - Consent Assessment of Civil Penalty Comply/Closed 2011-01-27 2011-01-27 $4,500.00 $4,500.00

For data sources see[7]