If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-25591 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.85,"lon":-81.69,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: Baughman Township | |
Operator Name: LAKE REGION OIL INC | |
Well Pad ID: | |
Farm/Lease Name: KANDEL | |
License Status: Producing | |
License Date: 2008-05-12 | |
Spud Date: 2008-05-28 | |
Spud Drilling Contractor: MARIC DRILLING CO. | |
Final Drill Date: 2008-06-02 | |
Well Total Depth: 3908.00 ft | |
Configuration: Vertical | |
Latitude: 40.850000 | |
Longitude: -81.690000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-05-12 | Proposed Formations:CLINTON, Issued Date:5/12/2008, Expired Date:5/12/2009 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-06-02 | |
Construction Permit Expires | 2009-05-12 | |
Completion Report Received | 2009-09-16 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2009-12-29 | 3757 | 3782 | 14 |
3757 | 3782 | 14 | |
3757 | 3782 | 14 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 3000 Bbl | 0 | NO TREATMENT OR RESERVOIR PRESSURES WERE REPORTED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | LAKE REGION OIL INC | 0.00 | 126.00 | 10 |
2009 | LAKE REGION OIL INC | 5023.00 | 1002.00 | 365 |
2010 | LAKE REGION OIL INC | 4287.00 | 475.00 | 365 |
2011 | LAKE REGION OIL INC | 2894.00 | 345.00 | 0 |
2012 | LAKE REGION OIL INC | 383.00 | 79.00 | 366 |
2013 | LAKE REGION OIL INC | 1066.00 | 266.00 | 365 |
2014 | LAKE REGION OIL INC | 1421.00 | 205.00 | 365 |
2015 | LAKE REGION OIL INC | 5953.00 | 460.00 | 365 |
2016 | LAKE REGION OIL INC | 4075.00 | 234.00 | 365 |
2017 | LAKE REGION OIL INC | 2863.00 | 160.00 | 365 |
2018 | LAKE REGION OIL INC | 2225.00 | 226.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | LAKE REGION OIL INC | Brine | 0 | 10 |
2009 | LAKE REGION OIL INC | Brine | 20 | 365 |
2010 | LAKE REGION OIL INC | Brine | 65 | 365 |
2011 | LAKE REGION OIL INC | Brine | 25 | |
2012 | LAKE REGION OIL INC | Brine | 40 | 366 |
2013 | LAKE REGION OIL INC | Brine | 55 | 365 |
2014 | LAKE REGION OIL INC | Brine | 195 | 365 |
2015 | LAKE REGION OIL INC | Brine | 257 | 365 |
2016 | LAKE REGION OIL INC | Brine | 345 | 365 |
2017 | LAKE REGION OIL INC | Brine | 435 | 365 |
2018 | LAKE REGION OIL INC | Brine | 720 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1125456590 | 2008-5-28 0:00: | DD | No Violations | 1.00 |
-1448828105 | 2018-10-25 0:00 | PW | No Violations | |
-1494296912 | 2008-5-29 0:00: | DD | No Violations | 4.00 |
-1550189253 | 2017-6-9 0:00:0 | PW | No Violations | |
-1965796932 | 2008-6-2 0:00:0 | DD | No Violations | 1.50 |
-2091612832 | 2017-6-9 0:00:0 | PL | No Violations | |
-321283578 | 2015-3-17 0:00: | PW | No Violations | 0.50 |
-549259530 | 2008-6-4 0:00:0 | DD | No Violations | 0.70 |
-791425948 | 2008-9-5 0:00:0 | PL | No Violations | 1.00 |
-893363106 | 2008-6-1 0:00:0 | DD | No Violations | 1.50 |
0042563515 | 2016-10-03 | Production Wells | No Violations | Inspected production well tank battery on 10/03/2016. The tank battery consists of 1-210 bbl steel tank, 1-1,100 gal plastic tank, and 1-horizontal separator, located within an earthen dike. The plastic tank and the diked area is shared with the production equipment for the Graber #4 well (PN: 169-25626). Well identification is clearly displayed at the tank battery. The well was plowed in with corn, and thus could not be accessed. Will re-inspect the well after the harvest. No other problems were noted at the time of the inspection. |
0321283578 | 2015-03-17 | Production Wells | No Violations | This producing well has no apparent problems at this time. |
0549259530 | 2008-06-04 | Drill / Deepen / Reopen | No Violations | Maric Drilling has moved rig off .Check on pit level and liners and they are both good. |
0791425948 | 2008-09-05 | Preliminary Restoration | No Violations | Meets requirements for Primary restoration. |
0893363106 | 2008-06-01 | Drill / Deepen / Reopen | No Violations | Maric Drilling is at 2900 ft. on 7 7/8 hole. |
0985361224 | 2013-07-11 | Production Wells | No Violations | This producing well has no apparent problems at this time. |
1125456590 | 2008-05-28 | Drill / Deepen / Reopen | No Violations | Maric is still having fill up on surface hole.Will set conductor pipe.OUT on complaint during the night so checked on rig. |
1412546965 | 2008-05-28 | Drill / Deepen / Reopen | No Violations | Maric Drilling is at 183 ft and has fill up so either set conductor or mix more mud. |
1448828105 | 2018-10-25 | Production Wells | No Violations | Inspected production well on 10/25/2018. The tank battery consists of 1-210 bbl steel tank, 1-1,100 gal plastic tank (shared), and 1-horizontal separator with a drip and meter box, located within an earthen dike; the diked area and noted equipment is shared with the tank battery for the Lester Graber #4 well (PN: 169-25626). The well is equipped with a pump jack with a natural gas-powered motor, drip, and regulator. The well was pumping at the time of the inspection. Well identification is clearly displayed at both the tank battery and the wellhead. The well is located ~250 from its RBDMS location. A map showing the location discrepancy, as well as a request for the location to be updated in RBDMS was sent to Aaron Lantz and Gregg Miller (DOGRM Columbus). No other problems were noted at the time of the inspection. |
1494296912 | 2008-05-29 | Drill / Deepen / Reopen | No Violations | Maric Drilling set 472 ft of 8 5/8 casing . |
1550189253 | 2017-06-09 | Production Wells | No Violations | Inspected production well on 06/09/2017. The tank battery conissts of 1-210 bbl steel tank, 1-1,100 gal plastic tank (shared), and 1-horizontal separator, located within an earthen dike; the diked area is shared with the tank battery for the Lester Graber #4 well (PN: 169-25626). The well is equipped with a pump jack with a natural gas-powered hitmiss motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
1616809187 | 2008-09-23 | Preliminary Restoration | No Violations | Meets requirements for Primary restoration. |
1654116026 | 2016-07-18 | Production Wells | No Violations | Inspected production well on 07/18/2016. The tank battery consists of 1-210 bbl steel tank, 1-100 bbl steel tank, 1-1,100 gal plastic tank, and 2-horizontal separators, located within an earthen dike. The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with a natural gas-powered motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection. |
1965796932 | 2008-06-02 | Drill / Deepen / Reopen | No Violations | Maric Drilling at 3400 ft. on 7 7/8 hole soaping. |
2091612832 | 2017-06-09 | Preliminary Restoration | No Violations | Inspected production well on 06/09/2017. All drilling equipment and debris have been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
42563515 | 2016-10-3 0:00: | PW | No Violations | |
985361224 | 2013-7-11 0:00: | PW | No Violations | 0.50 |
For data sources see[9]