If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-25311 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.87,"lon":-81.96,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: Wayne Township | |
Operator Name: PIN OAK ENERGY PARTNERS LLC | |
Well Pad ID: | |
Farm/Lease Name: BOWEN | |
License Status: Producing | |
License Date: 1999-10-29 | |
Spud Date: 1999-11-22 | |
Spud Drilling Contractor: MARIC DRILLING CO. | |
Final Drill Date: 1999-12-02 | |
Well Total Depth: 5656.00 ft | |
Configuration: Vertical | |
Latitude: 40.870000 | |
Longitude: -81.960000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 1999-10-29 | Proposed Formations:TREMPEALEAU (MAY NOT PRODUCE CLINTON), Issued Date:10/29/99, Expired Date:10/28/00 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 1999-11-22 | RBDMS Rec |
Completed | 1999-12-02 | RBDMS Rec |
Reached Total Depth | 1999-12-02 | RBDMS Rec |
Completion Report Received | 2000-06-26 | RBDMS Rec |
Construction Permit Expires | 2000-10-28 | RBDMS Rec |
Change of Owner | 2019-04-29 | Operator changed from 169, JAMES R SMAIL INC to 9722, PIN OAK ENERGY PARTNERS LLC |
Record Last Modified | 2019-04-29 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2000-09-07 | 5560 | 5566 | 13 |
5560 | 5566 | 13 | |
5560 | 5566 | 13 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 15 | 1200 Gal | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2000 | JAMES R SMAIL INC | 2678.00 | 1431.00 | 240 |
2001 | JAMES R SMAIL INC | 5300.00 | 1892.00 | 365 |
2002 | JAMES R SMAIL INC | 4937.00 | 1488.00 | 365 |
2003 | JAMES R SMAIL INC | 4236.00 | 1009.00 | 365 |
2004 | JAMES R SMAIL INC | 3284.00 | 520.00 | 365 |
2005 | JAMES R SMAIL INC | 2535.00 | 625.00 | 365 |
2006 | JAMES R SMAIL INC | 2050.00 | 465.00 | 365 |
2007 | JAMES R SMAIL INC | 1736.00 | 302.00 | 365 |
2008 | JAMES R SMAIL INC | 1383.00 | 273.00 | 365 |
2009 | JAMES R SMAIL INC | 1520.00 | 312.00 | 365 |
2010 | JAMES R SMAIL INC | 1095.00 | 427.00 | 365 |
2011 | JAMES R SMAIL INC | 1016.00 | 134.00 | 365 |
2012 | JAMES R SMAIL INC | 726.00 | 251.00 | 366 |
2013 | JAMES R SMAIL INC | 597.00 | 251.00 | 365 |
2014 | JAMES R SMAIL INC | 417.00 | 264.00 | 365 |
2015 | JAMES R SMAIL INC | 391.00 | 137.00 | 365 |
2016 | JAMES R SMAIL INC | 505.00 | 120.00 | 365 |
2017 | JAMES R SMAIL INC | 490.00 | 256.00 | 365 |
2018 | JAMES R SMAIL INC | 456.00 | 134.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2000 | JAMES R SMAIL INC | Brine | 330 | 240 |
2001 | JAMES R SMAIL INC | Brine | 30 | 365 |
2002 | JAMES R SMAIL INC | Brine | 0 | 365 |
2003 | JAMES R SMAIL INC | Brine | 0 | 365 |
2004 | JAMES R SMAIL INC | Brine | 0 | 365 |
2005 | JAMES R SMAIL INC | Brine | 0 | 365 |
2006 | JAMES R SMAIL INC | Brine | 0 | 365 |
2007 | JAMES R SMAIL INC | Brine | 0 | 365 |
2008 | JAMES R SMAIL INC | Brine | 30 | 365 |
2009 | JAMES R SMAIL INC | Brine | 0 | 365 |
2010 | JAMES R SMAIL INC | Brine | 25 | 365 |
2011 | JAMES R SMAIL INC | Brine | 0 | 365 |
2012 | JAMES R SMAIL INC | Brine | 0 | 366 |
2013 | JAMES R SMAIL INC | Brine | 0 | 365 |
2014 | JAMES R SMAIL INC | Brine | 0 | 365 |
2015 | JAMES R SMAIL INC | Brine | 0 | 365 |
2016 | JAMES R SMAIL INC | Brine | 40 | 365 |
2017 | JAMES R SMAIL INC | Brine | 33 | 365 |
2018 | JAMES R SMAIL INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1214067791 | 2017-2-3 0:00:0 | PL | No Violations | |
-1324153097 | 2016-3-24 0:00: | PW | No Violations | |
-171161208 | 2014-12-15 0:00 | PW | No Violations | 0.50 |
-597744851 | 2013-7-2 0:00:0 | PW | No Violations | 0.50 |
0051332816 | 2018-03-13 | Production Wells | No Violations | Inspected production well tank battery on 03/12/2018. The tank battery consists of 2-100 bbl steel tanks, 1-vertical separator, 1-drip, 1-meter box, and 1-underground brine vault (shared), located within an earthen dike; the diked area and noted equipment are shared with the Bowen #1 and #2 wells (PN: 169-23947/23945). Inspected production well on 03/13/2018. The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
0171161208 | 2014-12-15 | Production Wells | No Violations | This pumping unit well has no apparent issues a this time. |
0597744851 | 2013-07-02 | Production Wells | No Violations | This pump jack well has no apparent problems at this time. |
1214067791 | 2017-02-03 | Preliminary Restoration | No Violations | Inspected production well on 02/03/2017. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
1324153097 | 2016-03-24 | Production Wells | No Violations | Inspected production well on 03/24/2016. The tank battery consists of 4-100 bbl steel tanks, 3-vertical separators, and 1-underground brine vault located within an earthen dike. The tank battery is used by multiple wells (3); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. The area around the wellhead needs to be cleaned-up. Tim Taylor, James R. Smail Incs pumper, was notified of this issue and will have it addressed promptly. No other problems were noted at the time of the inspection. |
1477577254 | 2020-4-20 0:00: | PW | No Violations | |
1700624496 | 2017-02-03 | Production Wells | No Violations | Inspected production well on 02/03/2017. The tank battery consists of 2-100 bbl steel tanks and 1-vertical separator, located within an earthen dike. The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
2005170097 | 2016-09-26 | Production Wells | No Violations | Inspected production well on 09/26/2016. The tank battery consists of 2-100 bbl steel tanks, 1-vertical separator, and 1-underground brine vault, located within an earthen dike. The diked area and the underground brine vault are shared with the Bowen #1 and #2 wells (PN: 169-23947/23945). The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
51332816 | 2018-3-13 0:00: | PW | No Violations | |
iDIAN00459 | 2000-05-11 | Preliminary Restoration | No Violations | |
iDIAN004592 | 2000-5-11 0:00: | PL | No Violations |
For data sources see[9]