If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-23362 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.92,"lon":-81.93,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: Canaan Township | |
Operator Name: TRANSIT ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: MCILVAINE | |
License Status: Producing | |
License Date: 1982-07-29 | |
Spud Date: 1982-12-06 | |
Spud Drilling Contractor: TARGET DRLG | |
Final Drill Date: 1982-12-10 | |
Well Total Depth: 3440.00 ft | |
Configuration: Vertical | |
Latitude: 40.920000 | |
Longitude: -81.930000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1982-07-29 | Issued Date 7/29/82 Expired Date 1/15/83 Acres 0020000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 03440 Proposed Drill Depth 03440 |
Original Spud | 1982-12-06 | PERMIT EXPIRED |
Completed | 1982-12-10 | PERMIT EXPIRED |
Reached Total Depth | 1982-12-10 | PERMIT EXPIRED |
CO | 1982-12-14 | 513 DALTON & HANNA CO GeoDate 7/29/82 |
Construction Permit Expires | 1983-01-15 | PERMIT EXPIRED |
Completion Report Received | 1984-09-17 | PERMIT EXPIRED |
Last Compliance Report | 2014-08-05 | PERMIT EXPIRED |
Change of Owner | 2017-03-31 | Operator changed from 513, DALTON & HANNA LTD to 2771, TRANSIT ENERGY INC |
Record Last Modified | 2017-03-31 | PERMIT EXPIRED |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 0 | 0 | |
0 | 0 | ||
2006-09-11 | 3266 | 3344 | 13 |
3266 | 3344 | 13 | |
0 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 0 | 0 | 0 | |||
H2O | 0 | 72280 Bbl | 30000 | FRAC:WATER-SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | GREEN GAS CO | 1457.00 | 442.00 | 0 |
1985 | DALTON & HANNA LTD | 1237.00 | 310.00 | 365 |
1986 | DALTON & HANNA LTD | 2076.00 | 153.00 | 365 |
1987 | DALTON & HANNA LTD | 1394.00 | 230.00 | 365 |
1988 | DALTON & HANNA LTD | 1082.00 | 216.00 | 365 |
1989 | DALTON & HANNA LTD | 1869.00 | 136.00 | 365 |
1990 | DALTON & HANNA LTD | 1448.00 | 147.00 | 365 |
1991 | DALTON & HANNA LTD | 2028.00 | 149.00 | 365 |
1992 | DALTON & HANNA LTD | 1172.00 | 74.00 | 365 |
1993 | DALTON & HANNA LTD | 405.00 | 75.00 | 365 |
1995 | DALTON & HANNA LTD | 170.00 | 0.00 | 365 |
1996 | DALTON & HANNA LTD | 0.00 | 146.00 | 365 |
2012 | DALTON & HANNA LTD | 0.00 | 60.00 | 366 |
2013 | DALTON & HANNA LTD | 0.00 | 0.00 | 365 |
2014 | DALTON & HANNA LTD | 0.00 | 70.00 | 365 |
2015 | DALTON & HANNA LTD | 0.00 | 0.00 | 365 |
2016 | DALTON & HANNA LTD | 0.00 | 73.00 | 365 |
2017 | DALTON & HANNA LTD | 0.00 | 0.00 | 365 |
2018 | TRANSIT ENERGY INC | 0.00 | 63.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | GREEN GAS CO | Brine | 0 | 0 |
1985 | DALTON & HANNA LTD | Brine | 0 | 365 |
1986 | DALTON & HANNA LTD | Brine | 0 | 365 |
1987 | DALTON & HANNA LTD | Brine | 0 | 365 |
1988 | DALTON & HANNA LTD | Brine | 0 | 365 |
1989 | DALTON & HANNA LTD | Brine | 0 | 365 |
1990 | DALTON & HANNA LTD | Brine | 0 | 365 |
1991 | DALTON & HANNA LTD | Brine | 0 | 365 |
1992 | DALTON & HANNA LTD | Brine | 0 | 365 |
1993 | DALTON & HANNA LTD | Brine | 0 | 365 |
1995 | DALTON & HANNA LTD | Brine | 40 | 365 |
1996 | DALTON & HANNA LTD | Brine | 0 | 365 |
2012 | DALTON & HANNA LTD | Brine | 0 | 366 |
2013 | DALTON & HANNA LTD | Brine | 0 | 365 |
2014 | DALTON & HANNA LTD | Brine | 0 | 365 |
2015 | DALTON & HANNA LTD | Brine | 0 | 365 |
2016 | DALTON & HANNA LTD | Brine | 0 | 365 |
2017 | DALTON & HANNA LTD | Brine | 0 | 365 |
2018 | TRANSIT ENERGY INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1100920622 | 2014-6-11 0:00: | PW | No Violations | 0.50 |
-590386040 | 2017-2-2 0:00:0 | PW | No Violations | |
-848917427 | 2020-4-22 0:00: | PW | No Violations | |
00000PL960 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0100952547 | 2015-11-30 | Production Wells | No Violations | Inspected production well on 11/30/2015. The tank battery consists of 2-210 bbl steel tanks, 1-100 bbl steel tank, and 1-vertical separator located within an earthen dike. The tank battery is used by multiple wells (3); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection. |
0196779555 | 2019-05-16 | Production Wells | No Violations | Inspected production well on 05/16/2019. No problems were noted at the time of the inspection. |
0399543656 | 2018-09-13 | Production Wells | No Violations | Inspected production well on 09/13/2018 with NW Region Supervisor Steve Ochs. The tank battery consists of 1-210 bbl steel tank, 1-100 bbl steel tank (shared), 1-vertical separator (shared), and 1-drip (shared), located within an earthen dike; the diked area and noted equipment are shared with the tank battery for the Gasser #1 and #2 wells (PN: 169-25032/25035). Well identification is posted for at the tank battery, but it is very faded and must be updated to remain legible. Tim Sigler (Transit Energy) was notified of this issue and will address it promptly. The well is equipped with a pump jack with an electric motor. No other problems were noted at the time of the inspection. |
0590386040 | 2017-02-02 | Production Wells | No Violations | Inspected production well on 02/02/2017. The tank battery consists of 1-210 bbl steel tank, 1-100 bbl steel tank, and 1-vertical separator, located within an earthen dike. The 100 bbl steel tank, separator, and earthen dike are shared with the Gasser #1 and #2 wells (PN: 169-25032/25035). Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor. No problems were noted at the time of the inspection. |
100952547 | 2015-11-30 0:00 | PW | No Violations | |
1100920622 | 2014-06-11 | Production Wells | No Violations | This producing pumping unit well has no apparent problems at this time. |
1261344507 | 2006-02-15 | Annular Disposal | No Violations | This well is not using A.D. |
1372109492 | 2013-06-20 | Production Wells | No Violations | This is a pumping unit well. No apparent problems at this time. |
1592516699 | 2008-04-02 | Annular Disposal | No Violations | Check this well for Tom Tomastik.No.A.D. |
1781544173 | 2015-08-14 | Production Wells | No Violations | This pumping unit well has no apparent problems at time of inspection. There are no compliance issues at this time. |
196779555 | 2019-5-16 0:00: | PW | No Violations | |
1984195383 | 2016-08-08 | Production Wells | No Violations | Inspected production well on 08/08/2016. The tank battery consists of 2-210 bbl steel tanks, 1-100 bbl steel tank, and 1-vertical separator, located within an earthen dike. The tank battery is used by multiple wells (3); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection. |
2116370703 | 2018-02-28 | Production Wells | No Violations | Inspected production well on 02/28/2018. The tank battery consists of 1-210 bbl steel tank, 1-100 bbl steel tank (shared), 1-vertical separator (shared), and 1-drip (shared), located within an earthen dike; the diked area and noted equipment are shared with the Gasser #1 and #2 wells (PN: 169-25032/25035). Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor. No problems were noted at the time of the inspection. |
399543656 | 2018-9-13 0:00: | PW | No Violations | |
934048561 | 2020-9-29 0:00: | PW | No Violations | |
PL960 | PL | No Violations |
For data sources see[9]