34-169-23362

Well Details

Well ID: 34-169-23362
Loading map...
Country: United States
State: Ohio
County: Wayne
Municipality: Canaan Township
Operator Name: TRANSIT ENERGY INC
Well Pad ID:
Farm/Lease Name: MCILVAINE
License Status: Producing
License Date: 1982-07-29
Spud Date: 1982-12-06
Spud Drilling Contractor: TARGET DRLG
Final Drill Date: 1982-12-10
Well Total Depth: 3440.00 ft
Configuration: Vertical
Latitude: 40.920000
Longitude: -81.930000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1982-07-29 Issued Date 7/29/82 Expired Date 1/15/83 Acres 0020000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 03440 Proposed Drill Depth 03440
Original Spud 1982-12-06 PERMIT EXPIRED
Completed 1982-12-10 PERMIT EXPIRED
Reached Total Depth 1982-12-10 PERMIT EXPIRED
CO 1982-12-14 513 DALTON & HANNA CO GeoDate 7/29/82
Construction Permit Expires 1983-01-15 PERMIT EXPIRED
Completion Report Received 1984-09-17 PERMIT EXPIRED
Last Compliance Report 2014-08-05 PERMIT EXPIRED
Change of Owner 2017-03-31 Operator changed from 513, DALTON & HANNA LTD to 2771, TRANSIT ENERGY INC
Record Last Modified 2017-03-31 PERMIT EXPIRED

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 0 0
0 0
2006-09-11 3266 3344 13
3266 3344 13
0 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
ACID 0 0 0
H2O 0 72280 Bbl 30000 FRAC:WATER-SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 GREEN GAS CO 1457.00 442.00 0
1985 DALTON & HANNA LTD 1237.00 310.00 365
1986 DALTON & HANNA LTD 2076.00 153.00 365
1987 DALTON & HANNA LTD 1394.00 230.00 365
1988 DALTON & HANNA LTD 1082.00 216.00 365
1989 DALTON & HANNA LTD 1869.00 136.00 365
1990 DALTON & HANNA LTD 1448.00 147.00 365
1991 DALTON & HANNA LTD 2028.00 149.00 365
1992 DALTON & HANNA LTD 1172.00 74.00 365
1993 DALTON & HANNA LTD 405.00 75.00 365
1995 DALTON & HANNA LTD 170.00 0.00 365
1996 DALTON & HANNA LTD 0.00 146.00 365
2012 DALTON & HANNA LTD 0.00 60.00 366
2013 DALTON & HANNA LTD 0.00 0.00 365
2014 DALTON & HANNA LTD 0.00 70.00 365
2015 DALTON & HANNA LTD 0.00 0.00 365
2016 DALTON & HANNA LTD 0.00 73.00 365
2017 DALTON & HANNA LTD 0.00 0.00 365
2018 TRANSIT ENERGY INC 0.00 63.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 GREEN GAS CO Brine 0 0
1985 DALTON & HANNA LTD Brine 0 365
1986 DALTON & HANNA LTD Brine 0 365
1987 DALTON & HANNA LTD Brine 0 365
1988 DALTON & HANNA LTD Brine 0 365
1989 DALTON & HANNA LTD Brine 0 365
1990 DALTON & HANNA LTD Brine 0 365
1991 DALTON & HANNA LTD Brine 0 365
1992 DALTON & HANNA LTD Brine 0 365
1993 DALTON & HANNA LTD Brine 0 365
1995 DALTON & HANNA LTD Brine 40 365
1996 DALTON & HANNA LTD Brine 0 365
2012 DALTON & HANNA LTD Brine 0 366
2013 DALTON & HANNA LTD Brine 0 365
2014 DALTON & HANNA LTD Brine 0 365
2015 DALTON & HANNA LTD Brine 0 365
2016 DALTON & HANNA LTD Brine 0 365
2017 DALTON & HANNA LTD Brine 0 365
2018 TRANSIT ENERGY INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1100920622 2014-6-11 0:00: PW No Violations 0.50
-590386040 2017-2-2 0:00:0 PW No Violations
-848917427 2020-4-22 0:00: PW No Violations
00000PL960 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0100952547 2015-11-30 Production Wells No Violations Inspected production well on 11/30/2015. The tank battery consists of 2-210 bbl steel tanks, 1-100 bbl steel tank, and 1-vertical separator located within an earthen dike. The tank battery is used by multiple wells (3); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection.
0196779555 2019-05-16 Production Wells No Violations Inspected production well on 05/16/2019. No problems were noted at the time of the inspection.
0399543656 2018-09-13 Production Wells No Violations Inspected production well on 09/13/2018 with NW Region Supervisor Steve Ochs. The tank battery consists of 1-210 bbl steel tank, 1-100 bbl steel tank (shared), 1-vertical separator (shared), and 1-drip (shared), located within an earthen dike; the diked area and noted equipment are shared with the tank battery for the Gasser #1 and #2 wells (PN: 169-25032/25035). Well identification is posted for at the tank battery, but it is very faded and must be updated to remain legible. Tim Sigler (Transit Energy) was notified of this issue and will address it promptly. The well is equipped with a pump jack with an electric motor. No other problems were noted at the time of the inspection.
0590386040 2017-02-02 Production Wells No Violations Inspected production well on 02/02/2017. The tank battery consists of 1-210 bbl steel tank, 1-100 bbl steel tank, and 1-vertical separator, located within an earthen dike. The 100 bbl steel tank, separator, and earthen dike are shared with the Gasser #1 and #2 wells (PN: 169-25032/25035). Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor. No problems were noted at the time of the inspection.
100952547 2015-11-30 0:00 PW No Violations
1100920622 2014-06-11 Production Wells No Violations This producing pumping unit well has no apparent problems at this time.
1261344507 2006-02-15 Annular Disposal No Violations This well is not using A.D.
1372109492 2013-06-20 Production Wells No Violations This is a pumping unit well. No apparent problems at this time.
1592516699 2008-04-02 Annular Disposal No Violations Check this well for Tom Tomastik.No.A.D.
1781544173 2015-08-14 Production Wells No Violations This pumping unit well has no apparent problems at time of inspection. There are no compliance issues at this time.
196779555 2019-5-16 0:00: PW No Violations
1984195383 2016-08-08 Production Wells No Violations Inspected production well on 08/08/2016. The tank battery consists of 2-210 bbl steel tanks, 1-100 bbl steel tank, and 1-vertical separator, located within an earthen dike. The tank battery is used by multiple wells (3); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection.
2116370703 2018-02-28 Production Wells No Violations Inspected production well on 02/28/2018. The tank battery consists of 1-210 bbl steel tank, 1-100 bbl steel tank (shared), 1-vertical separator (shared), and 1-drip (shared), located within an earthen dike; the diked area and noted equipment are shared with the Gasser #1 and #2 wells (PN: 169-25032/25035). Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor. No problems were noted at the time of the inspection.
399543656 2018-9-13 0:00: PW No Violations
934048561 2020-9-29 0:00: PW No Violations
PL960 PL No Violations

For data sources see[9]