If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-167-63840 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.56,"lon":-81.18,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Washington | |
| Municipality: Ludlow Township | |
| Operator Name: SMITHBERGER JOHN D | |
| Well Pad ID: | |
| Farm/Lease Name: ARMSTRONG GEORGE | |
| License Status: Producing | |
| License Date: | |
| Spud Date: 1929-07-27 | |
| Spud Drilling Contractor: | |
| Final Drill Date: | |
| Well Total Depth: 2035.00 ft | |
| Configuration: Vertical | |
| Latitude: 39.560000 | |
| Longitude: -81.180000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| Original Spud | 1929-07-27 | FDT=GRIT |
| Record Last Modified | 2013-10-03 | FDT=GRIT |
For data sources see[2]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2002 | SMITHBERGER JOHN D | 880.00 | 84.00 | 365 |
| 2003 | SMITHBERGER JOHN D | 1000.00 | 45.00 | 365 |
| 2004 | SMITHBERGER JOHN D | 940.00 | 70.00 | 365 |
| 2005 | SMITHBERGER JOHN D | 351.00 | 61.00 | 365 |
| 2006 | SMITHBERGER JOHN D | 661.00 | 56.00 | 365 |
| 2007 | SMITHBERGER JOHN D | 558.00 | 39.00 | 365 |
| 2008 | SMITHBERGER JOHN D | 796.00 | 52.00 | 365 |
| 2009 | SMITHBERGER JOHN D | 885.00 | 49.00 | 365 |
| 2011 | SMITHBERGER JOHN D | 442.00 | 44.00 | 365 |
| 2012 | SMITHBERGER JOHN D | 301.00 | 41.00 | 366 |
| 2014 | SMITHBERGER JOHN D | 212.00 | 14.00 | 365 |
| 2015 | SMITHBERGER JOHN D | 497.00 | 20.00 | 365 |
| 2016 | SMITHBERGER JOHN D | 547.00 | 11.00 | 365 |
| 2017 | SMITHBERGER JOHN D | 361.00 | 18.00 | 365 |
| 2018 | SMITHBERGER JOHN D | 471.00 | 9.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2002 | SMITHBERGER JOHN D | Brine | 0 | 365 |
| 2003 | SMITHBERGER JOHN D | Brine | 0 | 365 |
| 2004 | SMITHBERGER JOHN D | Brine | 0 | 365 |
| 2005 | SMITHBERGER JOHN D | Brine | 0 | 365 |
| 2006 | SMITHBERGER JOHN D | Brine | 0 | 365 |
| 2007 | SMITHBERGER JOHN D | Brine | 0 | 365 |
| 2008 | SMITHBERGER JOHN D | Brine | 0 | 365 |
| 2009 | SMITHBERGER JOHN D | Brine | 0 | 365 |
| 2011 | SMITHBERGER JOHN D | Brine | 0 | 365 |
| 2012 | SMITHBERGER JOHN D | Brine | 0 | 366 |
| 2014 | SMITHBERGER JOHN D | Brine | 0 | 365 |
| 2015 | SMITHBERGER JOHN D | Brine | 0 | 365 |
| 2016 | SMITHBERGER JOHN D | Brine | 0 | 365 |
| 2017 | SMITHBERGER JOHN D | Brine | 0 | 365 |
| 2018 | SMITHBERGER JOHN D | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| 1063636520 | 2003-09-12 | Production Wells | No Violations | Inspection this day found spill area had been cleaned up - grass seed planted on dike and disturbed area, ground cleaned and smoothed back in place, good dike around tanks, new tank in place - will have IDs soon, no oil in creek, area around Heinrichs well complete enough so he can get in and produce well |
| 1739038540 | 2003-08-29 | Production Wells | No Violations | Reinspect location due to oil spill - land and creek cleaned up - tank in process of getting replaced, need to set new tank and rebuild dike - should be completed by 9/5/2003? |
For data sources see[7]