If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-167-29723 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.61,"lon":-81.41,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Washington | |
Municipality: Aurelius Township | |
Operator Name: TRIAD HUNTER LLC | |
Well Pad ID: US-OH-000695 | |
Farm/Lease Name: FARLEY | |
License Status: Producing | |
License Date: 2013-04-24 | |
Spud Date: 2013-11-15 | |
Spud Drilling Contractor: WARREN DRLG | |
Final Drill Date: 2014-04-07 | |
Well Total Depth: 15110.00 ft | |
Configuration: Horizontal | |
Latitude: 39.610000 | |
Longitude: -81.410000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-04-24 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:4/24/2013, Expired Date:4/24/2015 12:00:00 PM, Drilling unit acres:176.3, Proposed Well Type:OG, Proposed Well Class:EDPW |
Correction to Well | 2013-11-08 | CORRECTION TO CASING PROGRAM |
Reached Total Depth | 2014-04-07 | STATUS BASED ON INSPECTION REPORT BY LJ PARKINS ON 2/11/2016- |
Construction Permit Expires | 2015-04-24 | STATUS BASED ON INSPECTION REPORT BY LJ PARKINS ON 2/11/2016- |
Completion Report Received | 2018-03-09 | STATUS BASED ON INSPECTION REPORT BY LJ PARKINS ON 2/11/2016- |
Record Last Modified | 2018-03-23 | STATUS BASED ON INSPECTION REPORT BY LJ PARKINS ON 2/11/2016- |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-03-19 | 8914 | 9036 | 35 |
2018-03-19 | 13996 | 14118 | 35 |
13996 | 14118 | 35 | |
8914 | 9036 | 35 | |
8914 | 9036 | 35 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 12/18/2017 | 12/28/2017 | 7915 | 10,625,200.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand (100 Mesh Proppant) | Muskie Propant | Proppant | Silica Substrate | 14808-60-7 | 100 | 1.36091 | 1,392,940.0 |
Hydrochloric Acid (28%) | Dover | Acidizing | Hydrochloric Acid (Hydrogen Chloride) | 7732-18-5 | 36 | 0.171563 | 175601 | |
Water | 7732-18-5 | 64 | 0.305001 | 312179 | ||||
Other Chemical(s) | Listed Above | See Trade Name(s) List | Ammonium Chloride ((NH4)Cl) | 12125-02-9 | 2 | 0.00102402 | 1048.12 | |
Water | 7732-18-5 | 75 | 0.0384007 | 39304.4 | ||||
Alcohol ethoxylate | 34398-01-1 | 1 | 0.00000152 | 1.554 | ||||
Alcohols, C14-15, ethoxylated | 68951-67-7 | 5 | 0.00115559 | 1182.79 | ||||
Water | 7732-18-5 | 64 | 0.305001 | 312179 | ||||
Coconut oil acid diethanolamine | 68603-42-9 | 5 | 0.00115559 | 1182.79 | ||||
Fatty acids, tall oil | 61790-12-3 | 5 | 0.00115559 | 1182.79 | ||||
Alcohols, C14-15, ethoxylated | 68551-12-2 | 1.5 | 0.000768014 | 786.088 | ||||
2-Propyn-1-ol | 107-19-7 | 5 | 0.00115559 | 1182.79 | ||||
Crystalline silica | 14808-60-7 | 0.1 | 0.00000009 | 0.094 | ||||
Water | 7732-18-5 | 44.3 | 0.0102385 | 10479.5 | ||||
Oleic Acid Diethanolamide | 93-83-4 | 1.5 | 0.000768014 | 786.088 | ||||
2-Ethylhexanol | 104-76-7 | 10 | 0.00231118 | 2365.57 | ||||
Methanol | 67-56-1 | 40 | 0.00924473 | 9462.3 | ||||
Organophilic clay | 71011-26-2 | 2 | 0.00000307 | 3.14 | ||||
Guar gum | 9000-30-0 | 50 | 0.00007670 | 78.5 | ||||
Phosphinocarboxylic acid | 110224-99-2 | 44 | 0.00622611 | 6372.63 | ||||
Polyethylene glycol | 25322-68-3 | 50 | 0.0115559 | 11827.9 | ||||
Water | Blue Ridge Mountain Resources | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 86.6286 | 88,667,300.0 | |
SI-20W | Moon Chemical Products | Scale Inhibitor | Water | 7732-18-5 | 56 | 0.00792414 | 8110.62 | |
Phosphinocarboxylic acid | 110224-99-2 | 44 | 0.00622611 | 6372.63 | ||||
Plexslick 957 | Chemplex SOLVAY | Friction Reducer | Petroleum Distillate | 64742-47-8 | 20 | 0.0102402 | 10481.2 | |
Alcohols, C14-15, ethoxylated | 68551-12-2 | 1.5 | 0.000768014 | 786.088 | ||||
Water | 7732-18-5 | 75 | 0.0384007 | 39304.4 | ||||
Ammonium Chloride ((NH4)Cl) | 12125-02-9 | 2 | 0.00102402 | 1048.12 | ||||
Oleic Acid Diethanolamide | 93-83-4 | 1.5 | 0.000768014 | 786.088 | ||||
Sand (40/70 Proppant) | Muskie Propant | Proppant | Silica Substrate | 14808-60-7 | 100 | 11.4419 | 11,711,100.0 | |
Breaker | Chemplex SOLVAY | Oxidation | Sodium Persulfate | 7775-27-1 | 100 | 0.000465707 | 476.666 | |
K-BAC 1005 | Water Science Technologie, LLC | Biocide | Polyethylene glycol | 25322-68-3 | 50 | 0.0115559 | 11827.9 | |
2, 2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 5.8 | 0.00133124 | 1362.57 | ||||
Water | 7732-18-5 | 44.3 | 0.0102385 | 10479.5 | ||||
Plexgel 907 | Chemplex SOLVAY | Water Viscosifier | Crystalline silica | 14808-60-7 | 0.1 | 0.00000009 | 0.094 | |
Petroleum distillate | 64742-47-8 | 50 | 0.00007670 | 78.5 | ||||
Organophilic clay | 71011-26-2 | 2 | 0.00000307 | 3.14 | ||||
Guar gum | 9000-30-0 | 50 | 0.00007670 | 78.5 | ||||
Alcohol ethoxylate | 34398-01-1 | 1 | 0.00000152 | 1.554 | ||||
NEFE-180 | Chemplex | Corrosion Inhibitor/Iron Control | Acetic acid | 64-19-7 | 89 | 0.0205695 | 21053.6 | |
2-Ethylhexanol | 104-76-7 | 10 | 0.00231118 | 2365.57 | ||||
Methanol | 67-56-1 | 40 | 0.00924473 | 9462.3 | ||||
2-Propyn-1-ol | 107-19-7 | 5 | 0.00115559 | 1182.79 | ||||
Alcohols, C14-15, ethoxylated | 68951-67-7 | 5 | 0.00115559 | 1182.79 | ||||
Coconut oil acid diethanolamine | 68603-42-9 | 5 | 0.00115559 | 1182.79 | ||||
Fatty acids, tall oil | 61790-12-3 | 5 | 0.00115559 | 1182.79 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-12-18 | H2O | 15 | 7695 Bbl | 368780 | STINGRAY PRESSURE PUMPING LLC | STAGE 1/35
STAGE 2-34 SEE IMAGES |
2017-12-28 | H2O | 15 | 6731 Bbl | 375480 | STINGRAY PRESSURE PUMPING LLC | STAGE 35/35
STAGES 2-34 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | TRIAD HUNTER LLC | 0 | 0 | 0 |
2015 | TRIAD HUNTER LLC | 0 | 0 | 0 |
2016 | TRIAD HUNTER LLC | 0 | 0 | 0 |
2017 | TRIAD HUNTER LLC | 0 | 0 | 0 |
2018 | TRIAD HUNTER LLC | 1074364 | 20109 | 364 |
2019 | TRIAD HUNTER LLC | 155417 | 1572 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | TRIAD HUNTER LLC | Brine | 0 | 0 |
2015 | TRIAD HUNTER LLC | Brine | 0 | 0 |
2016 | TRIAD HUNTER LLC | Brine | 0 | 0 |
2017 | TRIAD HUNTER LLC | Brine | 0 | 0 |
2018 | TRIAD HUNTER LLC | Brine | 19539 | 364 |
2019 | TRIAD HUNTER LLC | Brine | 3027 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1177245795 | 2014-3-10 0:00: | DD | No Violations | 2.00 |
-1350076308 | 2018-11-14 0:00 | PL | No Violations | 0.20 |
-1624007152 | 2016-3-7 0:00:0 | AM | No Violations | 0.10 |
-1709028885 | 2014-2-5 0:00:0 | CS | No Violations | 7.00 |
-1776340646 | 2014-2-13 0:00: | CS | No Violations | 4.00 |
-1787084579 | 2017-12-28 0:00 | CT | No Violations | |
-1975591368 | 2018-7-16 0:00: | PW | No Violations | 0.50 |
-308340690 | 2014-4-1 0:00:0 | DD | No Violations | 5.00 |
-420667440 | 2013-11-22 0:00 | DD | No Violations | 6.50 |
-504881614 | 2014-4-7 0:00:0 | DD | No Violations | 2.50 |
-54168681 | 2020-8-27 0:00: | PW | No Violations | 0.40 |
-706469171 | 2014-3-27 0:00: | DD | No Violations | 6.00 |
0109595262 | 2013-11-25 | Drill / Deepen / Reopen | No Violations | Checked the status of the drilling rig. Total depth at the time of inspection was 890 ft. Spoke with company man and rig manager on site. They were experiencing technical difficulties due to cold weather. |
0308340690 | 2014-04-01 | Drill / Deepen / Reopen | No Violations | Checked the status of drilling operations on this site. Company was tripping out of the hole. Total depth was 14,758 ft. I examined the bit when it came out of the well. It had drilled 500 ft. Spoke with company man and Weatherford directional drilling hand on site. Accompanied by Inspector LJ Parkins. |
0420667440 | 2013-11-22 | Drill / Deepen / Reopen | No Violations | Witnessed the cementing of the surface casing. No chlorides were detected in the mix water. Good circulation and good returns were observed at the surface. |
0504881614 | 2014-04-07 | Drill / Deepen / Reopen | No Violations | Total depth at the time of inspection was 15,111 feet. They had reached total depth and were tripping the drill pipe out of the hole. It was reported to me by the company man that they did not drill into the fault. |
0606847409 | 2014-03-27 | Drill / Deepen / Reopen | No Violations | I met Andy Thomas at well site. They were rigged up with Cudd energy services with a large BOP stack from BTI Group and a snubbing unit from Cudd. Warren drilling rig 12 was being used to run pipe. They were tripping 2.87510lb/ft drill pipe in well to drill out and move toward the fault. |
0706469171 | 2014-03-27 | Drill / Deepen / Reopen | No Violations | Witnessed drill pipe being snubbed in the well after a bit change. The casing shoe had been drilled out. I was accompanied by Inspector Pat Shreve. We walked around the rig and learned more about the BOP/Snubbing stack the was being used to drill through. Spoke with company men on site. |
0762889876 | 2014-04-01 | Drill / Deepen / Reopen | No Violations | Accompanied Inspector Andy Thomas to witness drilling operations on this rig. The total depth of this well was set at 14,758. Witnessed the bit tripping out of the hole and examined the used bit which had been used for 500 of drilling. Andy Thomas took pictures of the used bit. Toured the well site with Triad Hunter Company Man and Safety Coordinator from Weatherford Drilling. |
109595262 | 2013-11-25 0:00 | DD | No Violations | 3.00 |
1161216800 | 2014-09-17 | Preliminary Restoration | No Violations | Upon inspection, it was observed that all disturbed land surfaces have been stabilized with a vegetative cover. All drilling equipment has been removed from the location, the lease road has been maintained, any drilling pits have been closed, and the entire location is diked. This fulfills the requirements of the preliminary restoration. |
1177245795 | 2014-03-10 | Drill / Deepen / Reopen | No Violations | Total depth at the time of inspection is 11,018 ft. The inclination is 90.35 degrees. The azimuth is 326.9 degrees. They are using an 8.5 in bit. Spoke with company man on site. |
1196008113 | 2013-11-12 | Drill / Deepen / Reopen | No Violations | Checked on the drilling of the conductor holes for this well and for permit number 9724. Express energy services was performing the work. Spoke with Mr. Sparky Bare on site. |
1350076308 | 2018-11-14 | Preliminary Restoration | No Violations | I am on location today to complete the preliminary restoration on this well. The preliminary restoration meets 1509.072(A). There are no violations at this time. |
1392737718 | 2014-02-18 | Drill / Deepen / Reopen | No Violations | Total depth at the time of inspection was 2353 ft. The company was starting their nudge out section to distance the well from others drilled on the pad. Spoke with company man on site. |
1393861594 | 2014-03-03 | Drill / Deepen / Reopen | No Violations | Total depth at the time of inspection is 7382 ft. An 8.5 in bit is being used for this section of hole. Spoke with company man Mr. Harold Roper on site. He stated that Triad was planning on running a 7.625 in. liner through the curve section. I reminded him that the rules state that liners must be hung 200 ft. into the previous casing string. |
1393945971 | 2014-03-04 | Administrative Inspection | No Violations | Received call from Mr. Tim Neil from Triad Hunter at 8:20 am. He called to notify me that they will be running a 7.625 in liner in the curve section. I reminded him that the rules state that liners have to be hung 200 vertical feet inside the nest larger casing. |
1395076883 | 2014-03-17 | Drill / Deepen / Reopen | No Violations | Drilling had reached a total depth of 14,258 ft. 14,213 ft. of 5.5 in. casing was ran and cemented on 3/16/14. I picked up paperwork for the cement job and spoke with the company man on site. We also talked about the next step for drilling on this pad which is running down with 3.5 in. tools and drilling out past the 5.5 in casing. I expressed my concern on this matter due to the pattern of activity associate with a fault zone that they are drilling close to. I then called Inspector Pat Shreve and discussed it with him, then I called my Supervisor Dan Goins and Deputy Chief Dave Claus. Deputy Chief Claus told me to get a hold of Engineer for Triad Mr. Tim Neill and get a plan and procedure together for this operation. I spoke with Mr. Neill and he agreed to send me one via e-mail. |
1395684164 | 2014-03-24 | Drill / Deepen / Reopen | No Violations | Total depth at the time of inspection is 14258 ft. They are getting ready to drill past the shoe on the 5.5 in. production string. Spoke with company man on site. |
1396286559 | 2014-03-31 | Drill / Deepen / Reopen | No Violations | Total depth at the time of inspection was 14,663 ft. Spoke with company man on site. He stated that they were getting small intermittent gas shows. Crew was performing a gas kick safety drill so that everyone would know what to do in the event that high pressure gas was encountered. |
1544929374 | 2016-02-11 | Production Wells | No Violations | Upon inspection, it was observed that this well is currently shut-in and is awaiting pipeline infrastructure to be completed and open for production. There were no leaks observed and gauges on annular fittings read 0 psi. No violations noted. Photos were taken of the location. I was accompanied on this inspection by DOGRM Emergency Response Coordinator Nathan Lane. |
1624007152 | 2016-03-07 | Administrative Inspection | No Violations | Addition to inspection from 2/11/16: This well has not yet been completed for oil/gas production purposes. |
1709028885 | 2014-02-05 | Casing String Witnessed | No Violations | My inspection finds the rig, Warren Rig 12, ran casing to a depth of 419. Baker Hughes circulated 627 sks of PNE-1 cement into place. I witnessed approximately 20 bbl of cement returns to surface. |
1776340646 | 2014-02-13 | Casing String Witnessed | No Violations | Witnessed the cementing of the 13.375 in. casing string. 1919 ft. of casing was ran in 1970 ft. of 17.5 in. hole. Good circulation was achieved throughout the whole job but no returns were observed. I looked at a sample of cement that was pulled when Baker Hughes started mixing cement. After letting it set for a while, no free water was observed on the top. Since there were no returns at the surface company will run a bond log to find the cement top. |
1787084579 | 2017-12-28 | Completion Testing | No Violations | Status check inspection on the well completion process found Stingray Pressure pumping on location completing stage 34 of 35 to be stimulated. The well bore is being completed in 150 increments and perforated by Kodiak Wireline Service with 5 clusters of 7 shots each cluster. The total sand used is 175,000 pounds per stage with a total treating mix water total of 7,200 barrels. The initial shut in pressure is 3,000 psi. All annulis is being monitored electronically and hooked into a gas buster tank flowing through a pressure control flow valve. The well head is a Universal Well Service 15,000 psi rated working pressure along with all the pressure pumping equipment. All stimulation equipment and support equipment is situated on polymer containment. |
1975591368 | 2018-07-16 | Production Wells | No Violations | Status check inspection found the well now in production. The well is equipped with a lower A section attached to the 13.375 diameter casing string with a riser pipe and both a manual and electronic transducer gauge on the 13.375 well head section, the gauge reads 0 pounds per square inch (psi). The upper B section of the well head has a riser pipe and pressure gauge present monitoring the casing pressure of the 9.625 diameter casing string with 0 psi present on the manual gauge. The 5.5 diameter casing string well head section shows 960 psi and the tubing well head section production flow line shows 586 psi. The well head is equipped with an emergency shut down valve that is controlled both remotely and by multiple electrical emergency shut down sites on the well pad. The well is selling through a sand trap system before entering the gas processing unit followed by a contact tower and glycol heater. The final gas sales point is a Blue Racer midstream sales point on the North side of the well pad. Also present is a production fluid facility consisting of 4 steel construction tanks of 400 barrel fluid volume, the tanks are situated inside a polymer lined steel containment dike area. The company has installed a low pressure vapor recovery system on the production equipment. |
606847409 | 2014-3-27 0:00: | DD | No Violations | 6.00 |
762889876 | 2014-4-1 0:00:0 | DD | No Violations | 6.00 |
For data sources see[10]