X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-157-24491

Well Details

Well ID: 34-157-24491
Loading map...
Country: United States
State: Ohio
County: Tuscarawas
Municipality: Clay Township
Operator Name: A BERRY ENTERPRISES LLC
Well Pad ID:
Farm/Lease Name: CLUM UNIT
License Status: Producing
License Date: 1986-12-29
Spud Date: 1987-01-13
Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]]
Final Drill Date: 1987-01-18
Well Total Depth: 4904.00 ft
Configuration: Vertical
Latitude: 40.370000
Longitude: -81.480000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1986-12-29 Issued Date 12/29/86 Expired Date 12/29/87 Acres 0000000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 04904 Proposed Drill Depth 04904
Original Spud 1987-01-13
Completed 1987-01-18
Reached Total Depth 1987-01-18
CO 1987-02-16 84 EVERFLOW EASTERN PTNS L P GeoDate 12/29/86
Completion Report Received 1987-03-02
Construction Permit Expires 1987-12-29
Change of Owner 2018-09-25 Operator changed from 84, EVERFLOW EASTERN PTNS L P to 10068, A BERRY ENTERPRISES LLC
Record Last Modified 2018-09-25

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 4686 4763 0
4686 4763 0
2006-09-11 4776 4832 30
4776 4832 30
4686 4763 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 99000 Gal 64000 FRA W/99M GAL H20, 64M# SAND & 240
N2 0 240 Mscf 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1987 EVERFLOW EASTERN PARTNERS LP 1137.00 79.00 365
1988 EVERFLOW EASTERN PARTNERS LP 3583.00 80.00 365
1989 EVERFLOW EASTERN PARTNERS LP 3124.00 79.00 365
1990 EVERFLOW EASTERN PARTNERS LP 2675.00 48.00 365
1991 EVERFLOW EASTERN PARTNERS LP 2098.00 0.00 365
1992 EVERFLOW EASTERN PARTNERS LP 947.00 0.00 365
1993 EVERFLOW EASTERN PARTNERS LP 1438.00 0.00 365
1994 EVERFLOW EASTERN PARTNERS LP 2270.00 70.00 365
1995 EVERFLOW EASTERN PARTNERS LP 1630.00 0.00 365
1996 EVERFLOW EASTERN PARTNERS LP 941.00 0.00 365
1997 EVERFLOW EASTERN PARTNERS LP 1154.00 0.00 365
1998 EVERFLOW EASTERN PARTNERS LP 808.00 0.00 365
1999 EVERFLOW EASTERN PARTNERS LP 943.00 0.00 365
2000 EVERFLOW EASTERN PARTNERS LP 476.00 44.00 365
2001 EVERFLOW EASTERN PARTNERS LP 416.00 0.00 365
2002 EVERFLOW EASTERN PARTNERS LP 384.00 0.00 365
2003 EVERFLOW EASTERN PARTNERS LP 215.00 0.00 365
2004 EVERFLOW EASTERN PARTNERS LP 43.00 0.00 365
2005 EVERFLOW EASTERN PARTNERS LP 627.00 0.00 365
2006 EVERFLOW EASTERN PARTNERS LP 738.00 0.00 365
2007 EVERFLOW EASTERN PARTNERS LP 795.00 0.00 365
2008 EVERFLOW EASTERN PARTNERS LP 607.00 0.00 365
2009 EVERFLOW EASTERN PARTNERS LP 564.00 0.00 365
2010 EVERFLOW EASTERN PARTNERS LP 414.00 66.00 365
2011 EVERFLOW EASTERN PARTNERS LP 757.00 0.00 365
2012 EVERFLOW EASTERN PARTNERS LP 643.00 0.00 246
2013 EVERFLOW EASTERN PARTNERS LP 488.00 0.00 95
2014 EVERFLOW EASTERN PARTNERS LP 911.00 36.00 185
2015 EVERFLOW EASTERN PARTNERS LP 463.00 0.00 365
2016 EVERFLOW EASTERN PARTNERS LP 287.00 0.00 365
2017 EVERFLOW EASTERN PARTNERS LP 420.00 0.00 365
2018 EVERFLOW EASTERN PARTNERS LP 874.00 36.00 267

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1987 EVERFLOW EASTERN PARTNERS LP Brine 120 365
1988 EVERFLOW EASTERN PARTNERS LP Brine 145 365
1989 EVERFLOW EASTERN PARTNERS LP Brine 55 365
1990 EVERFLOW EASTERN PARTNERS LP Brine 40 365
1991 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1992 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1993 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1994 EVERFLOW EASTERN PARTNERS LP Brine 40 365
1995 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1996 EVERFLOW EASTERN PARTNERS LP Brine 40 365
1997 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1998 EVERFLOW EASTERN PARTNERS LP Brine 40 365
1999 EVERFLOW EASTERN PARTNERS LP Brine 32 365
2000 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2001 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2002 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2003 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2004 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2005 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2006 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2007 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2008 EVERFLOW EASTERN PARTNERS LP Brine 55 365
2009 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2010 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2011 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2012 EVERFLOW EASTERN PARTNERS LP Brine 37 246
2013 EVERFLOW EASTERN PARTNERS LP Brine 0 95
2014 EVERFLOW EASTERN PARTNERS LP Brine 24 185
2015 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2016 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2017 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2018 EVERFLOW EASTERN PARTNERS LP Brine 0 267

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1143286867 2004-7-21 0:00: PW No Violations
-1159434059 2016-5-13 0:00: PW No Violations 0.50
-1848482798 2018-4-2 0:00:0 PW No Violations 0.50
-99858923 2018-4-2 0:00:0 PW No Violations 0.50
0000PL2516 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
001252i394 2002-09-16 Production Wells No Violations noviolations
0099858923 2018-04-02 Production Wells No Violations On the day of inspection with ground covered with snow, I was accompanied by ODNR Inspector Randy Akins. I witnessed the well was equipped with 4.5 inch diameter casing, 1.5 inch diameter tubing, a plunger lift system, and with domestic gas. The valve was open on tubing and 1 of 2 valves were open on casing. Production equipment included 2 steel 100 barrel tanks, 2- horizonal separators, 2- concrete vaults, and a chart recorder within an earthen dike. The production equipment was shared with another well. The proper identification was in place and production report was up to date. Heater tube on the one 100 barrel tank was leaking. Contacted George from Everflow Eastern about issue.
1143286867 2004-07-21 Production Wells No Violations no violation
1159434059 2016-05-13 Production Wells No Violations On the day of my inspection I found a 4 1/2 X 1 1/2 inch wellhead operated by a plunger lift system. The tubing valve is in the closed position. The well was idle on this day. The tank battery is shared with well 34-157-2-4492, and is made up of two 100 bbl. tanks, two horizontal separators, and two concrete vaults, all in an earthen dike. A recording gauge is on location. The tank is properly identified; the production reporting is up to date, there are no violations at this time
1252i394 2002-9-16 0:00: PW No Violations
1848482798 2018-04-02 Production Wells No Violations
PL2516 PL No Violations

For data sources see[9]

References