Well Details

Well ID: 34-157-24462
Loading map...
Country: United States
State: Ohio
County: Tuscarawas
Municipality: Bucks Township
Operator Name: NGO DEVELOPMENT CORP.
Well Pad ID:
Farm/Lease Name: EDWIN TROENDLY
License Status: Final Restoration
License Date: 2011-08-08
Spud Date: 1986-10-29
Spud Drilling Contractor: CUBBY DRLG
Final Drill Date: 1986-11-04
Well Total Depth: 7000.00 ft
Configuration: Vertical
Latitude: 40.380000
Longitude: -81.670000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1986-10-15 53 ATWOOD RESOURCES INC GeoDate 10/15/86
Oil and Gas 1986-10-15 Issued Date 10/15/86 Expired Date 10/15/87 Acres 0000000 Tool Type RTAF Proposed Formation Proposed Depth 07000 Proposed Drill Depth 07000
Original Spud 1986-10-23 LOG TYPE: LITHO-D.
Completed 1986-11-04 LOG TYPE: LITHO-D.
Reached Total Depth 1986-11-04 LOG TYPE: LITHO-D.
Completion Report Received 1986-11-24 LOG TYPE: LITHO-D.
CO 1992-12-21 424 NATIONAL PRODUCTION CORP GeoDate 10/15/86
CO 1992-12-22 98 NGO DEVELOPMENT CORP. GeoDate 10/15/86
APP 2011-08-08 Proposed Formations:OHIO SHALE TO UTICA SHALE (MAY NOT PRODUCE BEREA), Issued Date:8/8/2011, Expired Date:8/7/2013 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:ENPW
Construction Permit Expires 2013-08-07 LOG TYPE: LITHO-D.
Plugged/Abandoned 2016-01-08 LOG TYPE: LITHO-D.
Record Last Modified 2019-06-05 LOG TYPE: LITHO-D.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1999-05-20 6758 6768 20
6758 6768 20
6758 6768 20

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
ACID 15 500 Gal 0 ACID: 500 GAL OF 15% FE ACID

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1986 ATWOOD RESOURCES INC 622.00 2893.00 61
1987 ATWOOD RESOURCES INC 9969.00 21040.00 365
1988 ATWOOD RESOURCES INC 9120.00 18774.00 365
1989 ATWOOD RESOURCES INC 11351.00 3470.00 365
1990 ATWOOD RESOURCES INC 11722.00 2281.00 365
1991 ATWOOD RESOURCES INC 11956.00 7558.00 365
1992 ATWOOD RESOURCES INC 2029.00 3963.00 365
1993 NGO DEVELOPMENT CORP. 7930.00 7811.00 365
1994 NGO DEVELOPMENT CORP. 9510.00 7078.00 365
1995 NGO DEVELOPMENT CORP. 0.00 63.00 365
1996 NGO DEVELOPMENT CORP. 4500.00 4209.00 365
1997 NGO DEVELOPMENT CORP. 5840.00 3821.00 365
1998 NGO DEVELOPMENT CORP. 1510.00 2130.00 365
1999 NGO DEVELOPMENT CORP. 660.00 1377.00 365
2000 NGO DEVELOPMENT CORP. 3948.00 2563.00 0
2001 NGO DEVELOPMENT CORP. 281.00 2837.00 365
2002 NGO DEVELOPMENT CORP. 2330.00 1752.00 365
2003 NGO DEVELOPMENT CORP. 4254.00 2868.00 365
2004 NGO DEVELOPMENT CORP. 6446.00 2016.00 365
2005 NGO DEVELOPMENT CORP. 5868.00 2053.00 365
2006 NGO DEVELOPMENT CORP. 4254.00 1552.00 365
2007 NGO DEVELOPMENT CORP. 4801.00 1267.00 365
2008 NGO DEVELOPMENT CORP. 2892.00 615.00 365
2009 NGO DEVELOPMENT CORP. 2418.00 968.00 365
2010 NGO DEVELOPMENT CORP. 2417.00 471.00 365
2011 NGO DEVELOPMENT CORP. 248.00 53.00 365
2012 NGO DEVELOPMENT CORP. 0.00 0.00 366
2013 NGO DEVELOPMENT CORP. 0.00 0.00 365
2014 NGO DEVELOPMENT CORP. 0.00 0.00 365
2015 NGO DEVELOPMENT CORP. 0.00 0.00 365
2016 NGO DEVELOPMENT CORP. 0.00 0.00 8

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1986 ATWOOD RESOURCES INC Brine 70 61
1987 ATWOOD RESOURCES INC Brine 350 365
1988 ATWOOD RESOURCES INC Brine 0 365
1989 ATWOOD RESOURCES INC Brine 328 365
1990 ATWOOD RESOURCES INC Brine 250 365
1991 ATWOOD RESOURCES INC Brine 330 365
1992 ATWOOD RESOURCES INC Brine 85 365
1993 NGO DEVELOPMENT CORP. Brine 1882 365
1994 NGO DEVELOPMENT CORP. Brine 7086 365
1995 NGO DEVELOPMENT CORP. Brine 4 365
1996 NGO DEVELOPMENT CORP. Brine 9774 365
1997 NGO DEVELOPMENT CORP. Brine 9925 365
1998 NGO DEVELOPMENT CORP. Brine 9306 365
1999 NGO DEVELOPMENT CORP. Brine 8842 365
2000 NGO DEVELOPMENT CORP. Brine 9479
2001 NGO DEVELOPMENT CORP. Brine 9760 365
2002 NGO DEVELOPMENT CORP. Brine 9847 365
2003 NGO DEVELOPMENT CORP. Brine 10499 365
2004 NGO DEVELOPMENT CORP. Brine 10869 365
2005 NGO DEVELOPMENT CORP. Brine 10669 365
2006 NGO DEVELOPMENT CORP. Brine 11790 365
2007 NGO DEVELOPMENT CORP. Brine 12088 365
2008 NGO DEVELOPMENT CORP. Brine 10586 365
2009 NGO DEVELOPMENT CORP. Brine 11153 365
2010 NGO DEVELOPMENT CORP. Brine 11695 365
2011 NGO DEVELOPMENT CORP. Brine 3202 365
2012 NGO DEVELOPMENT CORP. Brine 0 366
2013 NGO DEVELOPMENT CORP. Brine 0 365
2014 NGO DEVELOPMENT CORP. Brine 0 365
2015 NGO DEVELOPMENT CORP. Brine 355 365
2016 NGO DEVELOPMENT CORP. Brine 605 8

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-591743353 2017-5-16 0:00: PB No Violations 1.00
-842878329 2016-5-6 0:00:0 FR No Violations 1.00
-863341971 2015-12-23 0:00 CS No Violations 2.00
0000PL2544 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0556513547 2017-07-18 Final Restoration No Violations On the day of my inspection, I found that the final restoration has been completed. The site passed final restoration per ORC 1509.072 (B).
0591743353 2017-05-16 Plug / Plug Back No Violations Upon arrival on location I found that the final restoration has not been completed. All grading has been done and all production equipment has been removed. There are areas that need seeded and mulched, no vegetation has been established. The final restoration does not pass I have placed a phone call to Gregg Mason with NGO to have this corrected.
0842878329 2016-05-06 Final Restoration No Violations On the day of my inspection I was unable to complete the final restoration at this time. There is still some production equipment on location and some dozer work needs to be done and seeding and mulching needs to be done I will contact NGO for an update. The restoration needs to be complete by 7/1/2016.
0863341971 2015-12-23 Casing String Witnessed No Violations Upon arrival on location I found the rig crew ready to cement the 4 1/2 inch casing. The casing was perforated at 4590 to 4591, the cemented through a cement retainer set at 4580. Established circulation and pumped 200 sacks of class A cement. Pulled off of the cement retainer and reversed circulated the 2 inch tubing.
1087618475 2017-06-01 Final Restoration No Violations On the day of my inspection I found that the final restoration has not been completed. There are areas that vegetation has not been established. I phoned Greg Mason with NGO to correct the areas on location.
1450450789 2015-12-18 Plug / Plug Back No Violations Upon arrival on location I met with Dean Limbacker with NGO Development to dicuss the plug back procedure. The tubing and rods have been removed. The tubing will be steamed and run back into the wellbore to the top of the perforation and a 400 foot plug will be set.
1450800754 2015-12-22 Casing String Witnessed No Violations Upon arrival on location I found the rig crew ready to perforate the 4 1/2 inch casing at a depth of 4590 to 4591 feet. A non- retrieval cement retainer was set at 4580 feet. We will cement the 4 1/2 inch casing from there. Established circulation and shut down for the day.
1451312289 2015-12-28 Casing String Witnessed No Violations Upon arrival on location I found the rig crew preparing to pressure test the 4 1/2 inch casing. The test requires a 900 lb, 30 minute test. Test failed. They will re-test.
1451415804 2015-12-30 Casing String Witnessed No Violations Re- Testing the 4 1/2 inch casing. The casing was tightened down hole and are test for integrity test. The test passed. Pressure at the beginning was 1320 pounds, at the end of Thirty minutes the pressure was 1300 pounds.
1451590127 2015-12-31 Casing String Witnessed No Violations Upon arrival on location I found that the rig crew was ready to perform injection test. 18.5 bbl was pumped at 400 lbs. pressure. NGO will evaluate and decide what further work will be done
1452172687 2016-01-07 Plug / Plug Back No Violations Upon arrival on location I found the rig crew ready to start plugging the well. Perforation are at 4540 feet and tubing was run to 4505 feet. A 400 foot plug was set from 4540 feet to 4140 feet, with 30 sacks of class A cement. Circulation was established and the cement was pumped. Ripped 4 1/2 inch casing at 3042
1452259356 2016-01-08 Plug / Plug Back No Violations Upon arrival on location I found the rig crew ready to continue plugging. The big lime plug will be set from 3002 feet to 2702 feet with class A cement. Set bottom surface plug from 1222 feet to 1022 feet. Set surface plug from 200 feet to ground level. Plugging is complete
1466774626 2016-06-24 Final Restoration No Violations On the day of my inspection I found that the tanks and equipment have been remove and the dike has been graded mulched and seeded. The well location has been graded, but has not been seeded and mulched. The pumping unit is still on location. The site does not pass final restoration.
1471348773 2016-08-16 Final Restoration No Violations On the day of my inspection I found that the tanks and equipment have been remove and the dike has been graded mulched and seeded. The well location has been graded, but has not been seeded and mulched. The pumping unit is still on location. The site does not pass final restoration.
2096397890 2015-12-21 Plug / Plug Back No Violations Upon arrival on location I found that the rig crew had run 2 inch tubing to a depth of 6757 feet to set the plug. Cemenco will cement . Established circulation and pumped 30 sacks of Class A cement and displaced with 24.5 bbls of saltwater.
556513547 2017-7-18 0:00: FR No Violations 0.70
PL2544 PL No Violations

For data sources see[9]