If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-157-21390 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.26,"lon":-81.43,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Tuscarawas | |
Municipality: Perry Township | |
Operator Name: JADCO ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: HOLTZ UNIT | |
License Status: Producing | |
License Date: 1971-06-18 | |
Spud Date: 1971-06-24 | |
Spud Drilling Contractor: | |
Final Drill Date: 1971-07-06 | |
Well Total Depth: 5560.00 ft | |
Configuration: Vertical | |
Latitude: 40.260000 | |
Longitude: -81.430000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1971-06-18 | 311 STOCKER & SITLER INC GeoDate 6/18/71 |
Original Spud | 1971-06-24 | |
Completed | 1971-07-06 | |
Reached Total Depth | 1971-07-06 | |
CO | 1995-04-20 | 182 BELDEN & BLAKE CO GeoDate 6/18/71 |
Change of Owner | 2002-08-12 | Operator changed from 182, BELDEN & BLAKE CORPORATION to 1966, PETROX INC |
Change of Owner | 2003-05-21 | Operator changed from 1966, PETROX INC to 5815, JADCO ENERGY INC. |
Record Last Modified | 2013-10-03 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 5406 | 5408 | 0 |
5406 | 5408 | 0 | |
5406 | 5408 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 2100 Bbl | 70000 | R.P. 72 HRS. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | DOMINION EAST OHIO | 4675.00 | 56.00 | 0 |
1985 | DOMINION EAST OHIO | 4181.00 | 74.00 | 365 |
1986 | DOMINION EAST OHIO | 3448.00 | 39.00 | 365 |
1987 | DOMINION EAST OHIO | 14374.00 | 158.00 | 358 |
1988 | DOMINION EAST OHIO | 15994.00 | 154.00 | 336 |
1989 | DOMINION EAST OHIO | 14175.00 | 377.00 | 363 |
1990 | DOMINION EAST OHIO | 3225.00 | 69.00 | 365 |
1991 | DOMINION EAST OHIO | 2737.00 | 34.00 | 365 |
1992 | DOMINION EAST OHIO | 2941.00 | 221.00 | 365 |
1993 | DOMINION EAST OHIO | 69968.00 | 253.00 | 365 |
1994 | DOMINION EAST OHIO | 69968.00 | 253.00 | 365 |
1995 | BELDEN & BLAKE CORPORATION | 1309.00 | 117.00 | 365 |
1996 | BELDEN & BLAKE CORPORATION | 1737.00 | 105.00 | 366 |
1997 | BELDEN & BLAKE CORPORATION | 965.00 | 82.00 | 366 |
2000 | BELDEN & BLAKE CORPORATION | 1588.00 | 56.00 | 130 |
2001 | BELDEN & BLAKE CORPORATION | 922.00 | 0.00 | 293 |
2002 | BELDEN & BLAKE CORPORATION | 248.00 | 0.00 | 16 |
2003 | JADCO ENERGY INC | 1886.00 | 80.00 | 365 |
2004 | JADCO ENERGY INC | 2034.00 | 70.00 | 365 |
2005 | JADCO ENERGY INC | 2229.00 | 41.00 | 365 |
2006 | JADCO ENERGY INC | 1163.00 | 27.00 | 365 |
2007 | JADCO ENERGY INC | 1081.00 | 39.00 | 365 |
2008 | JADCO ENERGY INC | 1338.00 | 33.00 | 365 |
2009 | JADCO ENERGY INC | 1063.00 | 0.00 | 365 |
2010 | JADCO ENERGY INC | 826.00 | 0.00 | 365 |
2011 | JADCO ENERGY INC | 2229.00 | 63.00 | 365 |
2012 | JADCO ENERGY INC | 1290.00 | 38.00 | 366 |
2013 | JADCO ENERGY INC | 1867.00 | 0.00 | 365 |
2014 | JADCO ENERGY INC | 1625.00 | 42.00 | 365 |
2015 | JADCO ENERGY INC | 1820.00 | 0.00 | 365 |
2016 | JADCO ENERGY INC | 1794.00 | 28.00 | 365 |
2017 | JADCO ENERGY INC | 1490.00 | 43.00 | 365 |
2018 | JADCO ENERGY INC | 1444.00 | 0.00 | 180 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | DOMINION EAST OHIO | Brine | 0 | 0 |
1985 | DOMINION EAST OHIO | Brine | 0 | 365 |
1986 | DOMINION EAST OHIO | Brine | 0 | 365 |
1987 | DOMINION EAST OHIO | Brine | 0 | 358 |
1988 | DOMINION EAST OHIO | Brine | 0 | 336 |
1989 | DOMINION EAST OHIO | Brine | 0 | 363 |
1990 | DOMINION EAST OHIO | Brine | 0 | 365 |
1991 | DOMINION EAST OHIO | Brine | 0 | 365 |
1992 | DOMINION EAST OHIO | Brine | 0 | 365 |
1993 | DOMINION EAST OHIO | Brine | 0 | 365 |
1994 | DOMINION EAST OHIO | Brine | 0 | 365 |
1995 | BELDEN & BLAKE CORPORATION | Brine | 0 | 365 |
1996 | BELDEN & BLAKE CORPORATION | Brine | 0 | 366 |
1997 | BELDEN & BLAKE CORPORATION | Brine | 0 | 366 |
2000 | BELDEN & BLAKE CORPORATION | Brine | 0 | 130 |
2001 | BELDEN & BLAKE CORPORATION | Brine | 0 | 293 |
2002 | JADCO ENERGY INC | Brine | 0 | 150 |
2003 | JADCO ENERGY INC | Brine | 70 | 365 |
2004 | JADCO ENERGY INC | Brine | 51 | 365 |
2005 | JADCO ENERGY INC | Brine | 33 | 365 |
2006 | JADCO ENERGY INC | Brine | 16 | 365 |
2007 | JADCO ENERGY INC | Brine | 26 | 365 |
2008 | JADCO ENERGY INC | Brine | 25 | 365 |
2009 | JADCO ENERGY INC | Brine | 0 | 365 |
2010 | JADCO ENERGY INC | Brine | 10 | 365 |
2011 | JADCO ENERGY INC | Brine | 6 | 365 |
2012 | JADCO ENERGY INC | Brine | 12 | 366 |
2013 | JADCO ENERGY INC | Brine | 36 | 365 |
2014 | JADCO ENERGY INC | Brine | 35 | 365 |
2015 | JADCO ENERGY INC | Brine | 0 | 365 |
2016 | JADCO ENERGY INC | Brine | 55 | 365 |
2017 | JADCO ENERGY INC | Brine | 20 | 365 |
2018 | JADCO ENERGY INC | Brine | 0 | 180 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-156324360 | 2018-6-6 0:00:0 | PW | No Violations | 0.10 |
-1664225126 | 2016-2-26 0:00: | PW | No Violations | 1.00 |
0000000150 | 2002-04-15 | Production Wells | No Violations | checked site found no violations at this time |
001252i150 | 2002-04-15 | Production Wells | No Violations | checked site found no violations at this time |
0156324360 | 2018-06-06 | Production Wells | No Violations | Upon arrival on location, I witnessed the well was equipped 4.5 inch diameter casing, 1.5 inch diameter tubing, and a plunger lift system. The valves were open on both the tubing and casing. I could not locate production equipment at the time of inspection. The production report was up to date and proper identification was present. |
0987604755 | 2016-02-26 | Production Wells | No Violations | On the day of my inspection I found an 8 X 4 casing hanger and a 4 X 1 1/2 wellhead operated by a plunger lift system. The outlet valve is in the closed position. The tank battery is made up of one 100 bbl. tank. The production reporting is up to date, the tank identification is not legible. |
1252i150 | 2002-4-15 0:00: | PW | No Violations | 0.50 |
150 | 2002-4-15 0:00: | PW | No Violations | 0.50 |
1664225126 | 2016-02-26 | Production Wells | No Violations | On the day of my inspection I found an 8 X 4 casing hanger and a 4 X 1 1/2 wellhead operated by a plunger lift system. The outlet valve is in the closed position. The tank battery is made up of one 100 bbl. tank. The production reporting is up to date, the tank identification is not legible. |
987604755 | 2016-2-26 0:00: | PW | No Violations | 1.00 |
For data sources see[9]