If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-157-21331 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.45,"lon":-81.39,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Tuscarawas | |
Municipality: Goshen Township | |
Operator Name: SOUND ENERGY CO INC | |
Well Pad ID: | |
Farm/Lease Name: GASSER H J ETAL | |
License Status: Producing | |
License Date: 1970-12-17 | |
Spud Date: 1970-12-13 | |
Spud Drilling Contractor: | |
Final Drill Date: 1970-12-19 | |
Well Total Depth: 5085.00 ft | |
Configuration: Vertical | |
Latitude: 40.450000 | |
Longitude: -81.390000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Original Spud | 1970-12-13 | |
Completed | 1970-12-19 | |
Reached Total Depth | 1970-12-19 | |
CO | 1989-07-14 | 1586 L L P OIL & GAS CORP |
Change of Owner | 1999-02-25 | Operator changed from 1586, L L P OIL & GAS CORP to 4327, SOUND ENERGY CO INC |
Record Last Modified | 2013-10-03 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 4916 | 4973 | 18 |
4916 | 4973 | 18 | |
4916 | 4973 | 18 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1500 Bbl | 36000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1989 | LLP GAS AND OIL CORPORATION | 993.00 | 0.00 | 365 |
1992 | LLP GAS AND OIL CORPORATION | 323.00 | 0.00 | 365 |
1993 | LLP GAS AND OIL CORPORATION | 618.00 | 0.00 | 365 |
1998 | SOUND ENERGY CO INC | 0.00 | 0.00 | 365 |
1999 | LLP GAS AND OIL CORPORATION | 0.00 | 0.00 | 365 |
2000 | LLP GAS AND OIL CORPORATION | 0.00 | 0.00 | 0 |
2001 | SOUND ENERGY CO INC | 2424.00 | 0.00 | 365 |
2002 | LLP GAS AND OIL CORPORATION | 0.00 | 0.00 | 365 |
2003 | SOUND ENERGY CO INC | 1292.00 | 0.00 | 365 |
2004 | SOUND ENERGY CO INC | 1300.00 | 51.00 | 365 |
2005 | SOUND ENERGY CO INC | 1254.00 | 0.00 | 365 |
2006 | SOUND ENERGY CO INC | 1553.00 | 0.00 | 365 |
2007 | SOUND ENERGY CO INC | 1209.00 | 0.00 | 365 |
2008 | SOUND ENERGY CO INC | 738.00 | 0.00 | 365 |
2009 | SOUND ENERGY CO INC | 920.00 | 0.00 | 365 |
2010 | SOUND ENERGY CO INC | 940.00 | 0.00 | 365 |
2011 | SOUND ENERGY CO INC | 962.00 | 48.00 | 365 |
2012 | SOUND ENERGY CO INC | 1731.00 | 0.00 | 366 |
2013 | SOUND ENERGY CO INC | 1570.00 | 0.00 | 365 |
2014 | SOUND ENERGY CO INC | 1227.00 | 0.00 | 365 |
2015 | SOUND ENERGY CO INC | 1256.00 | 57.00 | 365 |
2016 | SOUND ENERGY CO INC | 1325.00 | 0.00 | 365 |
2017 | SOUND ENERGY CO INC | 1148.00 | 0.00 | 365 |
2018 | SOUND ENERGY CO INC | 1232.00 | 53.00 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1527005192 | 2018-05-22 | Production Wells | No Violations | Upon arrival on location, I witnessed the well was equipped 4.5 inch diameter casing, 1.5 inch diameter tubing, and a plunger lift system. The valve was open on the tubing and one of two valves were open on the casing. Production equipment included a steel 100 barrel tank and a vertical separator within an earthen dike. This well provides domestic gas. The production report was up to date and proper identification was present. |
For data sources see[9]