34-155-24068

Well Details

Well ID: 34-155-24068
Loading map...
Country: United States
State: Ohio
County: Trumbull
Municipality: Hartford Township
Operator Name: PIN OAK ENERGY PARTNERS LLC
Well Pad ID: US-OH-000703
Farm/Lease Name: BUCKEYE
License Status: Producing
License Date: 2014-08-28
Spud Date: 2013-06-12
Spud Drilling Contractor: NABORS DRILLING
Final Drill Date: 2013-07-12
Well Total Depth: 11512.00 ft
Configuration: Horizontal
Latitude: 41.310000
Longitude: -80.580000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-04-29 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:4/29/2013, Expired Date:4/29/2015 12:00:00 PM, Drilling unit acres:136.98, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-07-12
Correction to Well 2013-10-04 CHANGE IN TARGET & TAKE-POINT INFORMATION (FOOTAGE & X,Y COORDINATES) FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2013-11-13
APP 2014-08-28 Proposed Formations:POINT PLEASANT, Issued Date:8/28/2014, Expired Date:8/27/2016 12:00:00 PM, Drilling unit acres:136.98, Proposed Well Type:OG, Proposed Well Class:
Change of Owner 2014-10-06 Operator changed from 9008, BP AMERICA PRODUCTION COMPANY to 8966, HALCON OPERATING COMPANY INC
Construction Permit Expires 2016-08-27
Change of Owner 2017-09-12 Operator changed from 8966, HALCON OPERATING COMPANY INC to 9722, PIN OAK ENERGY PARTNERS LLC
Record Last Modified 2017-09-12

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-11-14 7000 11280 672
7000 11280 672
7000 11280 672

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 08/18/2013 08/21/2013 6869 4,141,030.0 10753

Fluid Composition Data

-65 Scale Inhibitor
Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 BC-140 X2 Halliburton Crosslinker Monoethanolamine borate 26038-87-9 100 0.01866 7416
Ethylene glycol 107-21-1 30 0.0056 2225
BE-9 Halliburton Biocide Tributyl tetradecyl phosphonium chloride 81741-28-8 10 0.00436 1735
FR-66 Halliburton Friction Reducer Hydrotreated light petroleum distillate 64742-47-8 30 0.01511 6008
Halliburton Scale Inhibitor Ammonium chloride 12125-02-9 10 0.00265 1055
OPTIFLO-HTE Halliburton Breaker Crystalline silica, quartz 14808-60-7 30 0.00083 330
Walnut hulls Mixture 100 0.00277 1100
OptiKleen- Halliburton Concentrate Sodium perborate tetrahydrate 10486-00-7 100 0.00609 2420
LoSurf-300D Halliburton Non-ionic Surfactant Ethanol 64-17-5 60 0.05093 20243
1,2,4 Trimethylbenzene 95-63-6 1 0.00085 337
Naphthalene 91-20-3 5 0.00424 1687
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,

branched

127087-87-0 5 0.00424 1687
Heavy aromatic petroleum naphtha 64742-94-5 30 0.02546 10122
100 MESH, SSA-2, BULK (100003676) Halliburton Proppant Crystalline silica, quartz 14808-60-7 100 0.67248 267300
40/70 White Halliburton Proppant Crystalline silica, quartz 14808-60-7 100 5.37183 2,135,200.0
SAND - PREMIUM WHITE Halliburton Proppant Crystalline silica, quartz 14808-60-7 100 4.58185 1,821,200.0
LCA-1 Halliburton Solvent Paraffinic solvent Proprietary 100 0.00177 703
SAND - PREMIUM - 20/40, BULK, SK (101272933) Halliburton Proppant Crystalline silica, quartz 14808-60-7 100 2.31156 918800
GBW - 30 Halliburton Breaker Carbohydrates Proprietary 95 0.001 399
Hemicellulase enzyme 9012-54-8 15 0.00016 63
Fresh Water Operator Carrier/Base Fluid No MSDS Ingredients 7732-18-5 100 86.7834 34,494,800.0
WG-36 GELLING AGENT Halliburton Gelling Agent Guar gum 9000-30-0 100 0.04309 17128

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-08-19 H2O 0 276730 Gal 400507 Halliburton STAGE 4

60 SHOTS

2013-08-21 H2O 0 309892 Gal 344398 Halliburton STAGE 13

60 SHOTS

2013-08-20 H2O 0 331370 Gal 401773 Halliburton STAGE 10

42 SHOTS

2013-08-19 H2O 0 282312 Gal 398456 Halliburton STAGE 7

42 SHOTS

2013-08-19 H2O 0 363359 Gal 395917 Halliburton STAGE 3

60 SHOTS

2013-08-20 H2O 0 353738 Gal 400695 Halliburton STAGE 8

42 SHOTS

2013-08-19 H2O 0 355221 Gal 401714 Halliburton STAGE 5

60 SHOTS

2013-08-19 H2O 0 355436 Gal 404325 Halliburton STAGE 6

60 SHOTS

2013-08-18 H2O 0 352470 Gal 592700 Halliburton STAGE 1

60 SHOTS

2013-08-20 H2O 0 339780 Gal 401529 Halliburton STAGE 9

60 SHOTS

2013-08-20 H2O 0 248742 Gal 388518 Halliburton STAGE 12

42 SHOTS

2013-08-18 H2O 0 259475 Gal 400800 Halliburton STAGE 2

42 SHOTS

2013-08-20 H2O 0 312502 Gal 401463 Halliburton STAGE 11

42 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 BP AMERICA PRODUCTION COMPANY 20322 378 75
2014 HALCON OPERATING COMPANY INC 133732 1762 294
2015 HALCON OPERATING COMPANY INC 89004 417 197
2016 HALCON OPERATING COMPANY INC 10023 39 15
2017 PIN OAK ENERGY PARTNERS LLC 118037 178 255
2018 PIN OAK ENERGY PARTNERS LLC 121383 336 360
2019 PIN OAK ENERGY PARTNERS LLC 38631 137 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 BP AMERICA PRODUCTION COMPANY Brine 2203 75
2014 HALCON OPERATING COMPANY INC Brine 3631 294
2015 HALCON OPERATING COMPANY INC Brine 1037 197
2016 HALCON OPERATING COMPANY INC Brine 2 15
2017 PIN OAK ENERGY PARTNERS LLC Brine 223 255
2018 PIN OAK ENERGY PARTNERS LLC Brine 534 360
2019 PIN OAK ENERGY PARTNERS LLC Brine 70 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1109458884 2013-7-29 0:00: DD No Violations 1.00
-1188359609 2014-11-18 0:00 PL No Violations 0.50
-1671715535 2019-3-25 0:00: PW No Violations
-1757567883 2020-9-9 0:00:0 PW No Violations
-1883133202 2013-6-23 0:00: DD No Violations 8.50
-2078702450 2013-6-7 0:00:0 ND No Violations 1.50
-524980425 2017-10-17 0:00 PW No Violations 0.30
-581540148 2013-7-16 0:00: DD No Violations 0.50
0053577771 2013-07-25 Drill / Deepen / Reopen No Violations My inspection found Nabors M05 drilling at a current depth of 5,438. The drilling permit was posted in the companymans trailer; no violations at this time.
0060878580 2015-04-27 Production Wells No Violations I meet with the Federal EPA at this location. They performed an Air Quality Inspection of the well and tank battery. I performed a status check of the tank battery and well head. ID signs are posted. No violations were noted at this time.
0130170855 2013-05-23 Not Drilled No Violations My inspection found BP had added a soil stabilizer to the well pad. Some equipment has been positioned. Grass was growing on the topsoil stockpiles surrounding the well pad. All drainage and erosion controls are in place and working properly; no violations at this time.
0349320928 2013-06-24 Drill / Deepen / Reopen No Violations My inspection found the cement static at surface. BP and Nabors M07 performing rig maintenance; no violations at this time.
0524980425 2017-10-17 Production Wells No Violations I found the well in production on the day of my inspection. The production equipment and well are in good repair. The proper identification signs are post at the well pad and at the entrance. The access road is in good repair with a locked gate at the entrance. Pin Oak Energy took ownership on 9/12/2017.
0581540148 2013-07-16 Drill / Deepen / Reopen No Violations My inspection found BP rigging down Nabors M07 and moving equipment to the Zerovich #1 in Mecca Twp.; no violations at this time.
0630403479 2013-07-22 Drill / Deepen / Reopen No Violations My inspection found Brammer had reached total depth of 5,090 RKB (Kelly) for Hole #3. Currently, Nabors M05 and Brammer were performing rig maintenance and waiting on the proper landing joint to arrive; no violations at this time.
0789980084 2013-06-13 Drill / Deepen / Reopen No Violations I witnessed Halliburton cement the conductor casing for BP. Patterson Rig 256 drilled a 24 Hole #1 to 533 from RKB (Kelly). The operator set the 20 casing to 522 RKB. The conductor casing had a grade of H-40, 94 lbs. per ft., and averaged 44 in length. Halliburton established circulation with 5 bbls of fresh water. The operator pumped 50 bbls of 6% gel spacer followed by 420 sacks of Bondcem System cement. The cement was displaced to 475 using 179 bbls of fresh water. I witnessed approximately 52 bbls of good cement returned to surface. Cement was static at surface after 20 minutes. Cement was sampled and weighed three separate times; at the beginning, middle, and end of the operation.
0962072994 2013-10-25 Production Wells No Violations My inspection found BP flaring off flash gas from the production tanks. The tank battery contained a 500 barrel and five, 400 barrel production tanks surrounded by a steel dike. The dike was lined and had a layer of pea gravel.
0968078940 2013-06-18 Drill / Deepen / Reopen No Violations My inspection found the Nabor M07 had changed over from air drilling to fluid. The current depth was 1,622; there are no violations at this time.
1109458884 2013-07-29 Drill / Deepen / Reopen No Violations My inspection found a 6 inch water line being installed to frac the well. The drainage and erosion control were in good, stable condition; no violations at this time.
1188359609 2014-11-18 Preliminary Restoration No Violations I was on location for a Preliminary Restoration. During my inspection, I found all of the drill equipment removed from the location. The site was graded. The berms around the well site were in stable condition and vegetated. The well was equipped with a production tree. The tank battery consisted of five, 400 barrel production tanks and a 500 barrel production tank. A steel dike surrounded the tanks. There was a compressor and emergency flare. No pits were used to drill the well. All debris was removed. Drainage and erosion controls were in place and working properly. The lease road was in great condition with two locked gates.
130170855 2013-5-23 0:00: ND No Violations 0.50
1373470935 2013-07-08 Drill / Deepen / Reopen No Violations My inspection found the Nabors M07 drilling at a depth of 7,228; no violations at this time.
1472132483 2016-08-25 Production Wells No Violations I was on location for a status check. My inspection found the access road is in good repair. The entrance gate at Route 305 and the gate next to the well pad are locked. Identification signs are posted at the access road entrance and tank battery. The pad is fenced and all man doors are locked. The #1H is not in production. The well is equipped with a christmas tree valve assembly and partially rapped in insulation. There is a steel dike around the storage tanks.

The equipment on the pad consists of the following: 6 Storage tanks Five 400 bbl. One 500 bbl. 1 Vapor recovery unit (VRU) 1 Gas processing unit (GPU) 1 Production well on the pad Site fenced and man doors locked

1527610773 2018-05-29 Production Wells No Violations At the time of this inspection, the valves on the annulus were open. Production records for this well were current. The production equipment was in good repair. The proper identification signs are post at the well pad and at the entrance. The lease access was stable. There was a locked gate at the entrance. No violations observed.
1606528576 2013-09-09 Drill / Deepen / Reopen No Violations I received a call from Koreen Burrows, BP Field Environmental Advisor. Koreen stated that all of the grass on the berms surrounding the well pad was killed by a company contracted to kill weeds at all of BPs well locations. Koreen stated the weed killer lasts up to 6 to 8 months. BP plans to reseed the berms by the Spring of 2014. My inspection found all of the grass on the berms dead. The soil in the berms appeared stable. I took photos of the berms.
1671715535 2019-03-25 Production Wells No Violations At the time of this inspection, the well was equipped with a plunger lift assembly and the valves on the well casing and flow line were open. The production equipment was in good repair. The proper identification signs are post at the well pad and at the entrance. The lease access was stable with a locked gate. There was a locked gate at the entrance. No violations observed.
1720113591 2015-08-10 Production Wells No Violations I was on location for a status check. During my inspection, I found the well in production. The wellhead is equipped with a christmas tree. An insulated tarp is wrapped around the wellhead and christmas tree. The tank battery consists of five (5), 400 barrel production tanks, a 500 barrel tank, a heat, treat separator, and a vapor recovery unit. The six (6) tanks are positioned in a steel, lined dike with pea gravel. All of the load lines are encased in locked, plastic boxes. An identification sign is posted at the entrance. The lease road is in stable condition.
1847871639 2016-02-24 Production Wells No Violations I was on location for a status check. My inspection found the access road is in good repair. Identification signs are posted at the access road entrance. The pad is fenced and all man doors are unlocked. The #1H is in production. The well is equipped with a christmas tree valve assembly. There is a steel dike around the storage tanks.

The equipment on the pad consists of the following: 6 Storage tanks Five 400 bbl One 500 bbl 1 Vapor recovery unit (VRU) 1 Gas processing unit (GPU) 1 Production well on the pad Site fenced and man doors unlocked

I called and spoke with Zane Oshurac from Halcon. I instructed Mr. Oshurac to secure all man doors with locks and post an identification sign at the well.

1883133202 2013-06-23 Drill / Deepen / Reopen No Violations I witnessed Halliburton cement the surface casing for BP. Nabors M07 drilled a 17.5 Hole #2 to 2,988 RKB (Kelly) and set 13.375 surface casing to 2,980 RKB. The casing was 61 lbs/ft and a grade of J-55. Halliburton established circulation with 5 bbls of fresh water. The operator pumped 50 bbls of 6% Gel Spacer followed by 1,270 sacks of Bondcem System cement. When Halliburton reached 330 bbls during the displacement out of 440 bbls; the surface casing began to lift out of the hole. Nabors M07 used the top drive to push the casing down, then held it in place. Halliburton slowed down the displacement pump rate due to the casing lifting. After 357 bbls of displacement, cementing operations was shut down due to pressure climbing to high at the pump truck. I witnessed 6 bbls of good cement returned to surface. Halliburton bled off pressure to the pump truck and the floats held static for 5 minutes. Approximately 641 of cement was left in the casing. After 20 minutes, cement was static a surface. Cement was sampled and weighed three separate times; at the beginning, middle, and end of the operation. All cement sample met density requirements.
1992601560 2018-01-04 Production Wells No Violations I conducted an inspection on this well site with DOGRM inspector John Fleming. At the time of this inspection, the valves on the annulus were open. Production records for this well were current. The production equipment was in good repair. The proper identification signs are post at the well pad and at the entrance. The lease access was stable with a locked gate at the entrance. No violations observed.
2078702450 2013-06-07 Not Drilled No Violations I attended a pre-spud meeting lead by BP. The meeting included an updated casing program that was approved by Columbus and an estimated timeline for the well from start to finish. I walked the entire well pad; drainage and erosion controls were in place and working properly.
349320928 2013-6-24 0:00: DD No Violations 1.00
53577771 2013-7-25 0:00: DD No Violations 1.00
60878580 2015-4-27 0:00: PW No Violations 1.00
630403479 2013-7-22 0:00: DD No Violations
789980084 2013-6-13 0:00: DD No Violations 7.50
962072994 2013-10-25 0:00 PW No Violations 0.50
968078940 2013-6-18 0:00: DD No Violations 0.50

For data sources see[10]