X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-155-23614

Well Details

Well ID: 34-155-23614
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: PIN OAK ENERGY PARTNERS LLC
Well Pad ID:
Farm/Lease Name: WALTERS
License Status: Producing
License Date: 1996-06-11
Spud Date: 1996-09-24
Spud Drilling Contractor: CUBBY DRLG
Final Drill Date: 1996-10-03
Well Total Depth: 5219.00 ft
Configuration: Directional
Latitude: 41.260000
Longitude: -80.830000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1996-04-05 Issued Date 4/5/96 Expired Date 4/5/97 Acres 0055244 Tool Type RTAF Proposed Formation CLINTON Proposed Depth Proposed Drill Depth
CO 1996-06-11 3614 COPPERWELD ENERGY INC GeoDate 6/11/96
Oil and Gas 1996-06-11 Issued Date 6/11/96 Expired Date 6/11/97 Acres 0055627 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 05219 Proposed Drill Depth 05219
Original Spud 1996-09-24 RL 6-15-96, CORR ACREAGE / TGT/ XY 12-7-96
Completed 1996-10-03 RL 6-15-96, CORR ACREAGE / TGT/ XY 12-7-96
Reached Total Depth 1996-10-03 RL 6-15-96, CORR ACREAGE / TGT/ XY 12-7-96
CO 1996-10-21 3614 COPPERWELD ENERGY INC GeoDate 4/5/96
Completion Report Received 1996-11-08 RL 6-15-96, CORR ACREAGE / TGT/ XY 12-7-96
CO 1996-12-09 2816 P & S ENERGY INC GeoDate 6/11/96
Construction Permit Expires 1997-06-11 RL 6-15-96, CORR ACREAGE / TGT/ XY 12-7-96
Change of Owner 2019-02-26 Operator changed from 2816, P & S ENERGY INC to 9722, PIN OAK ENERGY PARTNERS LLC
Record Last Modified 2019-02-26 RL 6-15-96, CORR ACREAGE / TGT/ XY 12-7-96

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 4912 5058 0
4912 5058 0
2006-09-11 4929 5055 111
4929 5055 111
4912 5058 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 122000 Gal 100000 FRAC W/122M GAL WATER,100M# SAND &
N2 0 180 Mscf 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1996 P & S ENERGY INC 4685.00 323.00 72
1997 P & S ENERGY INC 52639.00 881.00 365
1998 P & S ENERGY INC 42551.00 280.00 365
1999 P & S ENERGY INC 33188.00 178.00 365
2000 P & S ENERGY INC 28697.00 73.00 365
2001 P & S ENERGY INC 24521.00 78.00 365
2002 P & S ENERGY INC 20297.00 69.00 365
2003 P & S ENERGY INC 19393.00 74.00 365
2004 P & S ENERGY INC 17130.00 20.00 365
2005 P & S ENERGY INC 14686.00 0.00 365
2006 P & S ENERGY INC 12805.00 0.00 365
2007 P & S ENERGY INC 13583.00 0.00 365
2008 P & S ENERGY INC 12914.00 56.00 365
2009 P & S ENERGY INC 11574.00 39.00 365
2010 P & S ENERGY INC 12985.00 0.00 365
2011 P & S ENERGY INC 12299.00 94.00 365
2012 P & S ENERGY INC 13961.00 0.00 366
2013 P & S ENERGY INC 11231.00 52.00 365
2014 P & S ENERGY INC 11050.00 0.00 365
2015 P & S ENERGY INC 10543.00 0.00 365
2016 P & S ENERGY INC 9625.00 42.00 365
2017 P & S ENERGY INC 9768.00 0.00 365
2018 P & S ENERGY INC 7851.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1996 P & S ENERGY INC Brine 0 72
1997 P & S ENERGY INC Brine 51 365
1998 P & S ENERGY INC Brine 0 365
1999 P & S ENERGY INC Brine 0 365
2000 P & S ENERGY INC Brine 0 365
2001 P & S ENERGY INC Brine 0 365
2002 P & S ENERGY INC Brine 0 365
2003 P & S ENERGY INC Brine 17 365
2004 P & S ENERGY INC Brine 55 365
2005 P & S ENERGY INC Brine 0 365
2006 P & S ENERGY INC Brine 0 365
2007 P & S ENERGY INC Brine 0 365
2008 P & S ENERGY INC Brine 0 365
2009 P & S ENERGY INC Brine 15 365
2010 P & S ENERGY INC Brine 0 365
2011 P & S ENERGY INC Brine 0 365
2012 P & S ENERGY INC Brine 40 366
2013 P & S ENERGY INC Brine 22 365
2014 P & S ENERGY INC Brine 0 365
2015 P & S ENERGY INC Brine 35 365
2016 P & S ENERGY INC Brine 0 365
2017 P & S ENERGY INC Brine 0 365
2018 P & S ENERGY INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
1079877869 2004-02-25 Preliminary Restoration No Violations Restoration approved .
1797089817 2013-08-28 UrbanProduction Wells No Violations My inspection found the well in production. The well was equipped with a plunger lift unit. The tank battery contained two, 100 barrel production tanks, a 50 barrel brine tank, and two separators. One separator was a heat, treated unit with the correct spacing. The dike met containment requirements. There were locked chain link fences and pine trees surrounding the tank battery and well. The proper identification signs were posted on the production tank and well. There were plugs on the load lines. A domestic gas line came off the heat, treated separator. The lease road was the parking lot for the business. The tank battery was shared with permit number 2-3068. This well was placed into production prior to House Bill 278.
246208462 2020-9-14 0:00: UP No Violations

For data sources see[9]

References