If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23167 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.27,"lon":-81.62,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Richfield Township | |
Operator Name: PIN OAK ENERGY PARTNERS LLC | |
Well Pad ID: | |
Farm/Lease Name: UNION SAND & SUPPLY | |
License Status: Producing | |
License Date: 2013-07-19 | |
Spud Date: 2013-11-11 | |
Spud Drilling Contractor: WILDCAT DRILLING | |
Final Drill Date: 2013-11-17 | |
Well Total Depth: 4020.00 ft | |
Configuration: Directional | |
Latitude: 41.270000 | |
Longitude: -81.620000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-07-19 | Proposed Formations:ORISKANY/NEWBURG/CLINTON, Issued Date:7/19/2013, Expired Date:7/19/2015 12:00:00 PM, Drilling unit acres:160, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2013-11-17 | |
Completion Report Received | 2014-01-16 | |
Correction to Well | 2014-02-14 | CHANGE IN TARGET INFORMATION (FOOTAGE, COORDINATES AND ELEVATION) FROM AS DRILLED SURVEY PLAT. |
Construction Permit Expires | 2015-07-19 | |
Change of Owner | 2018-08-21 | Operator changed from 3434, GONZOIL INC to 9722, PIN OAK ENERGY PARTNERS LLC |
Record Last Modified | 2018-08-21 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-01-17 | 3779 | 3813 | 23 |
3779 | 3813 | 23 | |
3779 | 3813 | 23 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-12-03 | H2O | 15 | 2180 Bbl | 91560 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | GONZOIL INC | 9070.00 | 3326.00 | 306 |
2015 | GONZOIL INC | 8580.00 | 1616.00 | 306 |
2016 | GONZOIL INC | 5469.00 | 1238.00 | 306 |
2017 | GONZOIL INC | 4385.00 | 952.00 | 306 |
2018 | GONZOIL INC | 2958.00 | 483.00 | 180 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | GONZOIL INC | Brine | 513 | 306 |
2015 | GONZOIL INC | Brine | 93 | 306 |
2016 | GONZOIL INC | Brine | 48 | 306 |
2017 | GONZOIL INC | Brine | 45 | 306 |
2018 | PIN OAK ENERGY PARTNERS LLC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1384439118 | 2013-11-12 | Casing String Witnessed | No Violations | I was on this location to observe the cementing of the 8.625 surface casing. Wildcat Drillng drilled a 11.75 hole to 527 K.B. and ran 11 joints of 8.625 20#, R-3, .219 wall, new casing to 486 G.L. Petroset Cementing Services rigged up and mixed a cement slurry of 225 sacks comprised of Class A cement , 3% CaCl, 1/4# per sack cello-flake. The cement slurry was displaced to 466 G.L with 30.5 Bbls fresh water. Centralizers were affixed on the 1st, 3rd, 5th, 7th, collars. Water temp. was 52 degrees with a pH of 6. I observed cement return to surface with 16 Bbls. circulated to the pit. Plug down @ 1803 Hrs.. Wait on cement ( WOC ) was given to be eight hours. I did not observed any violations on this inspection. |
1998873508 | 2013-11-19 | Casing String Witnessed | No Violations | Wildcat Drilling is set-up and drilling is in progress. Upon my arrival, crews were running in 11 joints (498 feet) of new, 20 lb./ft. 8 5/8-inch surface casing with a nominal average length of 44.50 feet. A total of 4 centralizers were placed (at joints #1, #3, #5, and #7). Depth of drilled hole is 526 feet KB. Circulation was established with no appreciable loss of fluid. 270 sacks (100% surplus) of Class A cement was run to surface with 15 barrels of returns. Pits have ample freeboard and liners are in place. No problems observed or noted. |
For data sources see[9]