If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-21344 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.15,"lon":-81.59,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Bath Township | |
Operator Name: PINE TOP INC | |
Well Pad ID: | |
Farm/Lease Name: MCCLEARY UNIT | |
License Status: Producing | |
License Date: 1983-02-10 | |
Spud Date: 1983-06-29 | |
Spud Drilling Contractor: MARTIN DRILLING | |
Final Drill Date: 1983-07-04 | |
Well Total Depth: 3730.00 ft | |
Configuration: Vertical | |
Latitude: 41.150000 | |
Longitude: -81.590000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1983-02-10 | 570 PINE TOP INC GeoDate 2/10/83 |
Oil and Gas | 1983-02-10 | Issued Date 2/10/83 Expired Date 8/9/83 Acres 0024696 Tool Type RTF Proposed Formation CLINTON Proposed Depth 03730 Proposed Drill Depth 03730 |
Original Spud | 1983-06-29 | |
Completed | 1983-07-04 | |
Reached Total Depth | 1983-07-04 | |
Completion Report Received | 1983-07-22 | |
Construction Permit Expires | 1983-08-09 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3544 | 3598 | 49 |
3544 | 3598 | 49 | |
3544 | 3598 | 49 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1400 Bbl | 60000 | FRAC;1400BBL H2O,60M# SD |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | PINE TOP INC | 12410.00 | 1266.00 | 0 |
1985 | PINE TOP INC | 8729.00 | 922.00 | 0 |
1988 | PINE TOP INC | 11722.00 | 2078.00 | 365 |
1989 | PINE TOP INC | 7853.00 | 1535.00 | 365 |
1990 | PINE TOP INC | 5319.00 | 896.00 | 365 |
1991 | PINE TOP INC | 301.00 | 475.00 | 365 |
1992 | PINE TOP INC | 3498.00 | 10255.00 | 365 |
1993 | PINE TOP INC | 7517.00 | 1028.00 | 365 |
1994 | PINE TOP INC | 5370.00 | 803.00 | 0 |
1995 | PINE TOP INC | 5956.00 | 930.00 | 371 |
1996 | PINE TOP INC | 6019.00 | 789.00 | 353 |
1997 | PINE TOP INC | 6019.00 | 789.00 | 365 |
1998 | PINE TOP INC | 4384.00 | 684.00 | 365 |
1999 | PINE TOP INC | 3542.00 | 521.00 | 365 |
2000 | PINE TOP INC | 3067.00 | 524.00 | 365 |
2001 | PINE TOP INC | 3086.00 | 606.00 | 365 |
2002 | PINE TOP INC | 2479.00 | 443.00 | 365 |
2003 | PINE TOP INC | 1973.00 | 354.00 | 365 |
2004 | PINE TOP INC | 1564.00 | 257.00 | 365 |
2005 | PINE TOP INC | 1049.00 | 205.00 | 365 |
2006 | PINE TOP INC | 1412.00 | 187.00 | 365 |
2007 | PINE TOP INC | 1874.00 | 291.00 | 365 |
2009 | PINE TOP INC | 2153.00 | 272.00 | 365 |
2010 | PINE TOP INC | 1204.00 | 513.00 | 365 |
2011 | PINE TOP INC | 1335.00 | 353.00 | 365 |
2012 | PINE TOP INC | 1327.00 | 0.00 | 366 |
2013 | PINE TOP INC | 976.00 | 266.00 | 365 |
2014 | PINE TOP INC | 846.00 | 345.00 | 365 |
2015 | PINE TOP INC | 597.00 | 185.00 | 365 |
2016 | PINE TOP INC | 323.00 | 78.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | PINE TOP INC | Brine | 0 | 0 |
1985 | PINE TOP INC | Brine | 100 | 0 |
1988 | PINE TOP INC | Brine | 41 | 365 |
1989 | PINE TOP INC | Brine | 35 | 365 |
1990 | PINE TOP INC | Brine | 39 | 365 |
1991 | PINE TOP INC | Brine | 0 | 365 |
1992 | PINE TOP INC | Brine | 50 | 365 |
1993 | PINE TOP INC | Brine | 60 | 365 |
1994 | PINE TOP INC | Brine | 30 | 0 |
1995 | PINE TOP INC | Brine | 110 | 371 |
1996 | PINE TOP INC | Brine | 145 | 353 |
1997 | PINE TOP INC | Brine | 145 | 365 |
1998 | PINE TOP INC | Brine | 0 | 365 |
1999 | PINE TOP INC | Brine | 50 | 365 |
2000 | PINE TOP INC | Brine | 0 | 365 |
2001 | PINE TOP INC | Brine | 45 | 365 |
2002 | PINE TOP INC | Brine | 0 | 365 |
2003 | PINE TOP INC | Brine | 50 | 365 |
2004 | PINE TOP INC | Brine | 0 | 365 |
2005 | PINE TOP INC | Brine | 26 | 365 |
2006 | PINE TOP INC | Brine | 350 | 365 |
2007 | PINE TOP INC | Brine | 329 | 365 |
2009 | PINE TOP INC | Brine | 101 | 365 |
2010 | PINE TOP INC | Brine | 104 | 365 |
2011 | PINE TOP INC | Brine | 96 | 365 |
2012 | PINE TOP INC | Brine | 95 | 366 |
2013 | PINE TOP INC | Brine | 95 | 365 |
2014 | PINE TOP INC | Brine | 75 | 365 |
2015 | PINE TOP INC | Brine | 26 | 365 |
2016 | PINE TOP INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1380701901 | 2020-2-6 0:00:0 | UP | No Violations | 1.00 |
1473363277 | 2016-06-07 | UrbanProduction Wells | No Violations | The access road is gravelled to the tank battery. The tank battery was surrounded by an earthen dike and locked fence. The tank battery consisted of one (1) 100 barrel oil tank, one (1) steel 50 barrels brine tank and a horizontal separator. All load lines were secured with tight plugs. The equipment had the proper spacing. The signage needed to be affixed to the fence rather setting on the ground. I spoke with Tony Carlisle ( Pine Top pumper ) and requested that he place the signage on the fence or tank and replace a one (1) inch valve on the bottom of the separator that had leaked. A metered house tie-in was also found in the tank battery. All tanks and equipment were leak free. The well consisted of a electric pumping unit with the customary well head configuration. The well was fenced and locked. The well head was free from leakage. No violations identified during this inspection. |
1553789634 | 2019-02-22 | Production Wells | No Violations | My inspection for complaint #6082 received on 02-21- |
For data sources see[9]