If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-151-25735 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.94,"lon":-81.18,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Stark | |
Municipality: Lexington Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000544 | |
Farm/Lease Name: FRANK UNIT | |
License Status: Producing | |
License Date: 2011-11-25 | |
Spud Date: 2012-02-18 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2012-03-27 | |
Well Total Depth: 13525.00 ft | |
Configuration: Horizontal | |
Latitude: 40.940000 | |
Longitude: -81.180000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-06-02 | Proposed Formations:POINT PLEASANT, Issued Date:6/2/2011, Expired Date:6/1/2013 12:00:00 PM, Drilling unit acres:336, Proposed Well Type:OG, Proposed Well Class:ENPW |
APP | 2011-11-25 | Proposed Formations:POINT PLEASANT, Issued Date:11/25/2011, Expired Date:11/24/2013 12:00:00 PM, Drilling unit acres:187.74, Proposed Well Type:OG, Proposed Well Class:ENPW |
Reached Total Depth | 2012-03-27 | IP NUMBERS FROM ENERVEST AUGUST 2012 PRESENTATION. NGLs WAS LISTED AS 312 Bbld. ALL WERE BASED ON A 24HR RATE |
Correction to Well | 2012-07-19 | CORRECTION TO TARGET INFORMATION :FOOTAGE, X, Y COORDINATES (FROM AS DRILLED SURVEY). UNIT SIZE DECREASED TO 183.68 ACRES. |
Completion Report Received | 2012-09-11 | IP NUMBERS FROM ENERVEST AUGUST 2012 PRESENTATION. NGLs WAS LISTED AS 312 Bbld. ALL WERE BASED ON A 24HR RATE |
End of Confidential Data | 2013-03-27 | IP NUMBERS FROM ENERVEST AUGUST 2012 PRESENTATION. NGLs WAS LISTED AS 312 Bbld. ALL WERE BASED ON A 24HR RATE |
Construction Permit Expires | 2013-11-24 | IP NUMBERS FROM ENERVEST AUGUST 2012 PRESENTATION. NGLs WAS LISTED AS 312 Bbld. ALL WERE BASED ON A 24HR RATE |
Record Last Modified | 2018-04-06 | IP NUMBERS FROM ENERVEST AUGUST 2012 PRESENTATION. NGLs WAS LISTED AS 312 Bbld. ALL WERE BASED ON A 24HR RATE |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2012-07-09 | 8954 | 9192 | 60 |
2012-07-09 | 8069 | 8307 | 60 |
2012-07-09 | 7774 | 8012 | 60 |
2012-07-09 | 7481 | 7715 | 60 |
2012-07-09 | 12494 | 12732 | 60 |
2012-07-09 | 12199 | 12437 | 60 |
2012-07-09 | 11859 | 12093 | 60 |
2012-07-09 | 13368 | 13374 | 37 |
2012-07-09 | 13084 | 13322 | 60 |
2012-07-09 | 12789 | 13027 | 60 |
2012-07-09 | 10699 | 10933 | 60 |
2012-07-09 | 8659 | 8897 | 60 |
2012-07-09 | 10409 | 10643 | 60 |
13084 | 13322 | 60 | |
12789 | 13027 | 60 | |
12494 | 12732 | 60 | |
12199 | 12437 | 60 | |
11859 | 12093 | 60 | |
11569 | 11801 | 60 | |
11279 | 11513 | 60 | |
10989 | 11223 | 60 | |
10699 | 10933 | 60 | |
10409 | 10643 | 60 | |
10119 | 10353 | 60 | |
9829 | 10063 | 60 | |
9539 | 9773 | 60 | |
9249 | 9483 | 60 | |
8954 | 9192 | 60 | |
8659 | 8897 | 60 | |
8364 | 8602 | 60 | |
8069 | 8307 | 60 | |
7774 | 8012 | 60 | |
7481 | 7715 | 60 | |
7184 | 7422 | 60 | |
6889 | 7127 | 60 | |
6594 | 6832 | 60 | |
13368 | 13374 | 37 | |
2012-07-09 | 10119 | 10353 | 60 |
6594 | 6832 | 60 | |
2012-07-09 | 11569 | 11801 | 60 |
2012-07-09 | 11279 | 11513 | 60 |
2012-07-09 | 10989 | 11223 | 60 |
2012-07-09 | 8364 | 8602 | 60 |
2012-07-09 | 9829 | 10063 | 60 |
2012-07-09 | 9539 | 9773 | 60 |
2012-07-09 | 9249 | 9483 | 60 |
2012-07-09 | 7184 | 7422 | 60 |
2012-07-09 | 6889 | 7127 | 60 |
2012-07-09 | 6594 | 6832 | 60 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2012-05-03 | H2O | 15 | 110564 Gal | 492020 | OTHER | STAGE 19 |
2012-05-01 | H2O | 15 | 109240 Gal | 488480 | OTHER | STAGE 13 |
2012-04-23 | H2O | 15 | 67601 Gal | 0 | OTHER | STAGE 1 |
2012-05-05 | H2O | 15 | 108466 Gal | 483682 | OTHER | STAGE 24 |
2012-04-29 | H2O | 15 | 113250 Gal | 498926 | OTHER | STAGE 8 |
2012-04-25 | H2O | 15 | 102190 Gal | 478840 | OTHER | STAGE 5 |
2012-05-02 | H2O | 15 | 107569 Gal | 491040 | OTHER | STAGE 17 |
2012-04-29 | H2O | 15 | 111521 Gal | 521398 | OTHER | STAGE 6 |
2012-05-03 | H2O | 15 | 106891 Gal | 488540 | OTHER | STAGE 18 |
2012-05-02 | H2O | 15 | 107990 Gal | 489420 | OTHER | STAGE 15 |
2012-05-04 | H2O | 15 | 106386 Gal | 479970 | OTHER | STAGE 21 |
2012-05-01 | H2O | 15 | 108435 Gal | 489000 | OTHER | STAGE 14 |
2012-04-30 | H2O | 15 | 103838 Gal | 483700 | OTHER | STAGE 10 |
2012-04-24 | H2O | 15 | 206244 Gal | 486360 | OTHER | STAGE 2 |
2012-04-30 | H2O | 15 | 109838 Gal | 489060 | OTHER | STAGE 9 |
2012-05-04 | H2O | 15 | 114597 Gal | 493300 | OTHER | STAGE 23 |
2012-04-25 | H2O | 15 | 112143 Gal | 488340 | OTHER | STAGE 4 |
2012-04-24 | H2O | 15 | 135311 Gal | 494939 | OTHER | STAGE 3 |
2012-04-29 | H2O | 15 | 111061 Gal | 488380 | OTHER | STAGE 7 |
2012-05-02 | H2O | 15 | 109768 Gal | 491080 | OTHER | STAGE 16 |
2012-05-04 | H2O | 15 | 110574 Gal | 492200 | OTHER | STAGE 22 |
2012-05-03 | H2O | 15 | 109983 Gal | 488060 | OTHER | STAGE 20 |
2012-04-30 | H2O | 15 | 112643 Gal | 488780 | OTHER | STAGE 11 |
2012-05-01 | H2O | 15 | 112905 Gal | 489000 | OTHER | STAGE 12 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | ENERVEST OPERATING LLC | 58679.00 | 8637.00 | 73 |
2013 | ENERVEST OPERATING LLC | 106885 | 8851 | 365 |
2014 | ENERVEST OPERATING LLC | 84494 | 5033 | 365 |
2015 | ENERVEST OPERATING LLC | 73182 | 3296 | 365 |
2016 | ENERVEST OPERATING LLC | 65828 | 2821 | 366 |
2017 | ENERVEST OPERATING LLC | 59255 | 2177 | 365 |
2018 | ENERVEST OPERATING LLC | 60692 | 2519 | 365 |
2019 | ENERVEST OPERATING LLC | 12607 | 343 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | ENERVEST OPERATING LLC | Brine | 8543 | 73 |
2013 | ENERVEST OPERATING LLC | Brine | 3755 | 365 |
2014 | ENERVEST OPERATING LLC | Brine | 1213 | 365 |
2015 | ENERVEST OPERATING LLC | Brine | 1121 | 365 |
2016 | ENERVEST OPERATING LLC | Brine | 1339 | 366 |
2017 | ENERVEST OPERATING LLC | Brine | 825 | 365 |
2018 | ENERVEST OPERATING LLC | Brine | 932 | 365 |
2019 | ENERVEST OPERATING LLC | Brine | 179 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1969037274 | 2012-11-19 0:00 | PW | No Violations | 1.50 |
-273211623 | 2012-11-14 0:00 | PW | No Violations | 1.00 |
0273211623 | 2012-11-14 | Production Wells | No Violations | I inspected the Frank 2H (34151257350000) site on November 14, 2012; I was accompanied by Tom Hill. We met Tom Vosick, Enervest Operating LLC, to check the pressure on the cemented annulus of the 8 inch casing string. Tom Vosick opened the valve on the annulus and there was zero pressure. The 5.5 inch casing had 535 psi and the tubing registered 2069 psi. Tom Hill and I walked the site to check restoration and drainage. My inspection showed sedimentation migrating off site on the south side of the well pad. There is a grated drain south of the wellhead outside the fenced well pad that does not have waddles around the drain, allowing sediments to enter the drain. The silt fencing and straw bales on the south side of the site are inadequate to control erosion. The south slope from the chain link fence to the grated drain is slumping and does not have vegetation and erosion control in place. The north slope, to include the north central and northeast corner, from State Route 619 to the chain link fence is slumping and does not have vegetation and erosion control in place. All slopes need to be stabilized to prevent slumping and erosion. Straw waddles need to be used to isolate the grated drain on the south side of the site. The south side of the site requires additional erosion control to prevent sediments migrating off site, such as straw waddles, silt fencing, and vegetation. No violations were issued. I called Tom Vosick to discuss the inspection items and he referred me to Chris Besley (304-590-7707). I called Chris and discussed the issues with him and he scheduled a contractor to be on site Monday November 19, 2012 to address the listed items. I will meet with the contractor next week to discuss the inspection. |
0433435591 | 2014-01-27 | Preliminary Restoration | No Violations | I was on location to perform a production inspection and to pass preliminary restoration. The lease road is in good condition, graveled, and does not show signs of erosion. The tank battery consists of twelve 210 stock tanks, six for condensate and six for brine, and one mechanical separator. The 210 bbl stock tanks have proper identification sign attached. The dike has good walls and containment capacity. The drain lines on the 210 bbl stock tanks are closed and capped to prevent an uncontrolled release. There is a 50 barrel sand tank on location as well. All equipment on site is new and in great condition. The wellhead does not show signs of oil, gas, or saltwater leaks. The fencing surrounding the wellhead and entire location is in good condition. The well has three casing strings and each is cemented to surface with no annular space. The 5.5 inch production casing has 235 psi at the time of my inspection. Erosion controls are in place and working as designed during my inspection. There are no violations on this well site and preliminary restoration can be passed at this time. |
0928137512 | 2012-11-29 | Production Wells | No Violations | I inspected the Frank 2H (34151257350000) site on November 29, 2012. My inspection was to follow up with the meeting I had on November 19, 2012 with Joe Little regarding erosion control around the well site. Joe Little Excavating installed straw matting on the northern and southern slopes of the site to control erosion. Straw bales have been installed on the hillside south of the well pad and surrounding the metal storm grate to prevent erosion and sedimentation migrating off site. |
1818585851 | 2012-11-05 | Production Wells | No Violations | I inspected the Frank 2H (34151257350000) site on November 5, 2012 due to a request from Kyle Tharp regarding the water well compliant at 12308 McCallum Avenue in Lexington Township. The lease road is in good condition, graveled, and does not show signs of erosion. The tank battery consists of twelve 210 bbl stock tanks, six for condensate and six for brine, and one mechanical separator. The 210 bbl stock tanks have proper identification sign attached. The dike has good walls and containment capacity. The drain lines on the 210 bbl stock tanks are closed and capped to prevent an uncontrolled release. All equipment on site is new and in great condition. The wellhead does not show signs of oil, gas, or saltwater leaks. The fencing surrounding the well head is in good condition. I called Tom Vosick, Enervest Operating LLC Utica Well Division, to discuss the completion report for this well. According to Tom, the well was in production from August 16, 2012 to September 12, 2012 and since September 12, 2012 the well has been shut in. The well has three casing strings and each is cemented to surface with no annular space. The 5.5 inch production casing has 450 psi and the tubing has 2025 psi at the time of my inspection. |
1969037274 | 2012-11-19 | Production Wells | No Violations | I met with Joe Little from Joe Little Excavating at the Frank 2H (34151257350000) well site on November 19, 2012. Joe and I discussed erosion control surrounding the well site. We walked the site and I showed Joe the areas of erosion and the need for control to prevent sedimentation migrating off site. Joe will have a crew install straw matting on the north and south slopes of the site. Isolate the grated drain south of the wellhead outside the fenced well pad and improve silt fencing. The entire site will be reseeded in the spring of 2013 to establish permanent erosion control. |
433435591 | 2014-1-27 0:00: | PL | No Violations | 2.00 |
928137512 | 2012-11-29 0:00 | PW | No Violations | 1.00 |
For data sources see[9]