34-151-25735

Well Details

Well ID: 34-151-25735
Loading map...
Country: United States
State: Ohio
County: Stark
Municipality: Lexington Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000544
Farm/Lease Name: FRANK UNIT
License Status: Producing
License Date: 2011-11-25
Spud Date: 2012-02-18
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2012-03-27
Well Total Depth: 13525.00 ft
Configuration: Horizontal
Latitude: 40.940000
Longitude: -81.180000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2011-06-02 Proposed Formations:POINT PLEASANT, Issued Date:6/2/2011, Expired Date:6/1/2013 12:00:00 PM, Drilling unit acres:336, Proposed Well Type:OG, Proposed Well Class:ENPW
APP 2011-11-25 Proposed Formations:POINT PLEASANT, Issued Date:11/25/2011, Expired Date:11/24/2013 12:00:00 PM, Drilling unit acres:187.74, Proposed Well Type:OG, Proposed Well Class:ENPW
Reached Total Depth 2012-03-27 IP NUMBERS FROM ENERVEST AUGUST 2012 PRESENTATION. NGLs WAS LISTED AS 312 Bbld. ALL WERE BASED ON A 24HR RATE
Correction to Well 2012-07-19 CORRECTION TO TARGET INFORMATION :FOOTAGE, X, Y COORDINATES (FROM AS DRILLED SURVEY). UNIT SIZE DECREASED TO 183.68 ACRES.
Completion Report Received 2012-09-11 IP NUMBERS FROM ENERVEST AUGUST 2012 PRESENTATION. NGLs WAS LISTED AS 312 Bbld. ALL WERE BASED ON A 24HR RATE
End of Confidential Data 2013-03-27 IP NUMBERS FROM ENERVEST AUGUST 2012 PRESENTATION. NGLs WAS LISTED AS 312 Bbld. ALL WERE BASED ON A 24HR RATE
Construction Permit Expires 2013-11-24 IP NUMBERS FROM ENERVEST AUGUST 2012 PRESENTATION. NGLs WAS LISTED AS 312 Bbld. ALL WERE BASED ON A 24HR RATE
Record Last Modified 2018-04-06 IP NUMBERS FROM ENERVEST AUGUST 2012 PRESENTATION. NGLs WAS LISTED AS 312 Bbld. ALL WERE BASED ON A 24HR RATE

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2012-07-09 8954 9192 60
2012-07-09 8069 8307 60
2012-07-09 7774 8012 60
2012-07-09 7481 7715 60
2012-07-09 12494 12732 60
2012-07-09 12199 12437 60
2012-07-09 11859 12093 60
2012-07-09 13368 13374 37
2012-07-09 13084 13322 60
2012-07-09 12789 13027 60
2012-07-09 10699 10933 60
2012-07-09 8659 8897 60
2012-07-09 10409 10643 60
13084 13322 60
12789 13027 60
12494 12732 60
12199 12437 60
11859 12093 60
11569 11801 60
11279 11513 60
10989 11223 60
10699 10933 60
10409 10643 60
10119 10353 60
9829 10063 60
9539 9773 60
9249 9483 60
8954 9192 60
8659 8897 60
8364 8602 60
8069 8307 60
7774 8012 60
7481 7715 60
7184 7422 60
6889 7127 60
6594 6832 60
13368 13374 37
2012-07-09 10119 10353 60
6594 6832 60
2012-07-09 11569 11801 60
2012-07-09 11279 11513 60
2012-07-09 10989 11223 60
2012-07-09 8364 8602 60
2012-07-09 9829 10063 60
2012-07-09 9539 9773 60
2012-07-09 9249 9483 60
2012-07-09 7184 7422 60
2012-07-09 6889 7127 60
2012-07-09 6594 6832 60

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2012-05-03 H2O 15 110564 Gal 492020 OTHER STAGE 19
2012-05-01 H2O 15 109240 Gal 488480 OTHER STAGE 13
2012-04-23 H2O 15 67601 Gal 0 OTHER STAGE 1
2012-05-05 H2O 15 108466 Gal 483682 OTHER STAGE 24
2012-04-29 H2O 15 113250 Gal 498926 OTHER STAGE 8
2012-04-25 H2O 15 102190 Gal 478840 OTHER STAGE 5
2012-05-02 H2O 15 107569 Gal 491040 OTHER STAGE 17
2012-04-29 H2O 15 111521 Gal 521398 OTHER STAGE 6
2012-05-03 H2O 15 106891 Gal 488540 OTHER STAGE 18
2012-05-02 H2O 15 107990 Gal 489420 OTHER STAGE 15
2012-05-04 H2O 15 106386 Gal 479970 OTHER STAGE 21
2012-05-01 H2O 15 108435 Gal 489000 OTHER STAGE 14
2012-04-30 H2O 15 103838 Gal 483700 OTHER STAGE 10
2012-04-24 H2O 15 206244 Gal 486360 OTHER STAGE 2
2012-04-30 H2O 15 109838 Gal 489060 OTHER STAGE 9
2012-05-04 H2O 15 114597 Gal 493300 OTHER STAGE 23
2012-04-25 H2O 15 112143 Gal 488340 OTHER STAGE 4
2012-04-24 H2O 15 135311 Gal 494939 OTHER STAGE 3
2012-04-29 H2O 15 111061 Gal 488380 OTHER STAGE 7
2012-05-02 H2O 15 109768 Gal 491080 OTHER STAGE 16
2012-05-04 H2O 15 110574 Gal 492200 OTHER STAGE 22
2012-05-03 H2O 15 109983 Gal 488060 OTHER STAGE 20
2012-04-30 H2O 15 112643 Gal 488780 OTHER STAGE 11
2012-05-01 H2O 15 112905 Gal 489000 OTHER STAGE 12

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2012 ENERVEST OPERATING LLC 58679.00 8637.00 73
2013 ENERVEST OPERATING LLC 106885 8851 365
2014 ENERVEST OPERATING LLC 84494 5033 365
2015 ENERVEST OPERATING LLC 73182 3296 365
2016 ENERVEST OPERATING LLC 65828 2821 366
2017 ENERVEST OPERATING LLC 59255 2177 365
2018 ENERVEST OPERATING LLC 60692 2519 365
2019 ENERVEST OPERATING LLC 12607 343 90

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2012 ENERVEST OPERATING LLC Brine 8543 73
2013 ENERVEST OPERATING LLC Brine 3755 365
2014 ENERVEST OPERATING LLC Brine 1213 365
2015 ENERVEST OPERATING LLC Brine 1121 365
2016 ENERVEST OPERATING LLC Brine 1339 366
2017 ENERVEST OPERATING LLC Brine 825 365
2018 ENERVEST OPERATING LLC Brine 932 365
2019 ENERVEST OPERATING LLC Brine 179 90

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1969037274 2012-11-19 0:00 PW No Violations 1.50
-273211623 2012-11-14 0:00 PW No Violations 1.00
0273211623 2012-11-14 Production Wells No Violations I inspected the Frank 2H (34151257350000) site on November 14, 2012; I was accompanied by Tom Hill. We met Tom Vosick, Enervest Operating LLC, to check the pressure on the cemented annulus of the 8 inch casing string. Tom Vosick opened the valve on the annulus and there was zero pressure. The 5.5 inch casing had 535 psi and the tubing registered 2069 psi. Tom Hill and I walked the site to check restoration and drainage. My inspection showed sedimentation migrating off site on the south side of the well pad. There is a grated drain south of the wellhead outside the fenced well pad that does not have waddles around the drain, allowing sediments to enter the drain. The silt fencing and straw bales on the south side of the site are inadequate to control erosion. The south slope from the chain link fence to the grated drain is slumping and does not have vegetation and erosion control in place. The north slope, to include the north central and northeast corner, from State Route 619 to the chain link fence is slumping and does not have vegetation and erosion control in place. All slopes need to be stabilized to prevent slumping and erosion. Straw waddles need to be used to isolate the grated drain on the south side of the site. The south side of the site requires additional erosion control to prevent sediments migrating off site, such as straw waddles, silt fencing, and vegetation. No violations were issued. I called Tom Vosick to discuss the inspection items and he referred me to Chris Besley (304-590-7707). I called Chris and discussed the issues with him and he scheduled a contractor to be on site Monday November 19, 2012 to address the listed items. I will meet with the contractor next week to discuss the inspection.
0433435591 2014-01-27 Preliminary Restoration No Violations I was on location to perform a production inspection and to pass preliminary restoration. The lease road is in good condition, graveled, and does not show signs of erosion. The tank battery consists of twelve 210 stock tanks, six for condensate and six for brine, and one mechanical separator. The 210 bbl stock tanks have proper identification sign attached. The dike has good walls and containment capacity. The drain lines on the 210 bbl stock tanks are closed and capped to prevent an uncontrolled release. There is a 50 barrel sand tank on location as well. All equipment on site is new and in great condition. The wellhead does not show signs of oil, gas, or saltwater leaks. The fencing surrounding the wellhead and entire location is in good condition. The well has three casing strings and each is cemented to surface with no annular space. The 5.5 inch production casing has 235 psi at the time of my inspection. Erosion controls are in place and working as designed during my inspection. There are no violations on this well site and preliminary restoration can be passed at this time.
0928137512 2012-11-29 Production Wells No Violations I inspected the Frank 2H (34151257350000) site on November 29, 2012. My inspection was to follow up with the meeting I had on November 19, 2012 with Joe Little regarding erosion control around the well site. Joe Little Excavating installed straw matting on the northern and southern slopes of the site to control erosion. Straw bales have been installed on the hillside south of the well pad and surrounding the metal storm grate to prevent erosion and sedimentation migrating off site.
1818585851 2012-11-05 Production Wells No Violations I inspected the Frank 2H (34151257350000) site on November 5, 2012 due to a request from Kyle Tharp regarding the water well compliant at 12308 McCallum Avenue in Lexington Township. The lease road is in good condition, graveled, and does not show signs of erosion. The tank battery consists of twelve 210 bbl stock tanks, six for condensate and six for brine, and one mechanical separator. The 210 bbl stock tanks have proper identification sign attached. The dike has good walls and containment capacity. The drain lines on the 210 bbl stock tanks are closed and capped to prevent an uncontrolled release. All equipment on site is new and in great condition. The wellhead does not show signs of oil, gas, or saltwater leaks. The fencing surrounding the well head is in good condition. I called Tom Vosick, Enervest Operating LLC Utica Well Division, to discuss the completion report for this well. According to Tom, the well was in production from August 16, 2012 to September 12, 2012 and since September 12, 2012 the well has been shut in. The well has three casing strings and each is cemented to surface with no annular space. The 5.5 inch production casing has 450 psi and the tubing has 2025 psi at the time of my inspection.
1969037274 2012-11-19 Production Wells No Violations I met with Joe Little from Joe Little Excavating at the Frank 2H (34151257350000) well site on November 19, 2012. Joe and I discussed erosion control surrounding the well site. We walked the site and I showed Joe the areas of erosion and the need for control to prevent sedimentation migrating off site. Joe will have a crew install straw matting on the north and south slopes of the site. Isolate the grated drain south of the wellhead outside the fenced well pad and improve silt fencing. The entire site will be reseeded in the spring of 2013 to establish permanent erosion control.
433435591 2014-1-27 0:00: PL No Violations 2.00
928137512 2012-11-29 0:00 PW No Violations 1.00

For data sources see[9]

References