If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-151-25601 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.87,"lon":-81.13,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Stark | |
| Municipality: Washington Township | |
| Operator Name: C & T ENERGY OF EAST CANTON IN | |
| Well Pad ID: | |
| Farm/Lease Name: KOLLAR KRABILL UNIT | |
| License Status: Producing | |
| License Date: 2007-09-28 | |
| Spud Date: 2007-10-09 | |
| Spud Drilling Contractor: ADVENT DRLG | |
| Final Drill Date: 2007-10-13 | |
| Well Total Depth: 5450.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.870000 | |
| Longitude: -81.130000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2007-09-28 | Proposed Formations:CLINTON, Issued Date:9/28/2007, Expired Date:9/27/2008 6:00:00 AM, Drilling unit acres:80, Proposed Well Type:OG, Proposed Well Class:POOL |
| Completed | 2007-10-13 | |
| Reached Total Depth | 2007-10-13 | |
| Completion Report Received | 2007-11-19 | |
| Construction Permit Expires | 2008-09-27 | |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2008-02-20 | 5212 | 5286 | 57 |
| 5212 | 5286 | 57 | |
| 5212 | 5286 | 57 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 15 | 186000 Gal | 100000 | 1000 GALLONS FE ACID |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2008 | C & T ENERGY OF EAST CANTON IN | 17763.00 | 3019.00 | 365 |
| 2009 | C & T ENERGY OF EAST CANTON IN | 12827.00 | 1296.00 | 365 |
| 2010 | C & T ENERGY OF EAST CANTON IN | 9312.00 | 891.00 | 365 |
| 2011 | C & T ENERGY OF EAST CANTON IN | 8838.00 | 606.00 | 0 |
| 2012 | C & T ENERGY OF EAST CANTON IN | 7011.00 | 518.00 | 366 |
| 2013 | C & T ENERGY OF EAST CANTON IN | 4849.00 | 600.00 | 365 |
| 2014 | C & T ENERGY OF EAST CANTON IN | 4940.00 | 559.00 | 365 |
| 2015 | C & T ENERGY OF EAST CANTON IN | 4623.00 | 430.00 | 365 |
| 2016 | C & T ENERGY OF EAST CANTON IN | 4003.00 | 391.00 | 365 |
| 2017 | C & T ENERGY OF EAST CANTON IN | 3380.00 | 246.00 | 365 |
| 2018 | C & T ENERGY OF EAST CANTON IN | 3069.00 | 160.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2008 | C & T ENERGY OF EAST CANTON IN | Brine | 1163 | 365 |
| 2009 | C & T ENERGY OF EAST CANTON IN | Brine | 455 | 365 |
| 2010 | C & T ENERGY OF EAST CANTON IN | Brine | 315 | 365 |
| 2011 | C & T ENERGY OF EAST CANTON IN | Brine | 315 | |
| 2012 | C & T ENERGY OF EAST CANTON IN | Brine | 238 | 366 |
| 2013 | C & T ENERGY OF EAST CANTON IN | Brine | 175 | 365 |
| 2014 | C & T ENERGY OF EAST CANTON IN | Brine | 70 | 365 |
| 2015 | C & T ENERGY OF EAST CANTON IN | Brine | 70 | 365 |
| 2016 | C & T ENERGY OF EAST CANTON IN | Brine | 95 | 365 |
| 2017 | C & T ENERGY OF EAST CANTON IN | Brine | 35 | 365 |
| 2018 | C & T ENERGY OF EAST CANTON IN | Brine | 35 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| 0115992755 | 2008-08-05 | Preliminary Restoration | No Violations | The location is reclaimed. The Preliminary Restoration is PASSED. |
| 115992755 | 2008-8-5 0:00:0 | PL | No Violations | |
| 1192020911 | 2007-10-09 | Drill / Deepen / Reopen | No Violations | Drilling at 745. Pits and liners are intact. |
| 1412329204 | 2008-07-10 | Preliminary Restoration | No Violations | The well is in production and the location is reclaimed. The I.D. sign has not been posted at the wellhead. I did not pass the Preliminary Restoration at this time. |
| 1669624513 | 2009-04-23 | Production Wells | No Violations | There were no violations at the wellhead or at the tank battery. |
For data sources see[9]