If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-133-24406 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.01,"lon":-81.17,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Portage | |
| Municipality: Atwater Township | |
| Operator Name: PIN OAK ENERGY PARTNERS LLC | |
| Well Pad ID: | |
| Farm/Lease Name: WHITTLESEY-DUTTON UNIT | |
| License Status: Producing | |
| License Date: 2011-02-24 | |
| Spud Date: 2011-07-14 | |
| Spud Drilling Contractor: POULSON DRILLING | |
| Final Drill Date: 2011-07-19 | |
| Well Total Depth: 4849.00 ft | |
| Configuration: Vertical | |
| Latitude: 41.010000 | |
| Longitude: -81.170000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2011-02-24 | Proposed Formations:CLINTON, Issued Date:2/24/2011, Expired Date:2/23/2013 12:00:00 PM, Drilling unit acres:302.119, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2011-07-19 | |
| Completion Report Received | 2011-09-22 | |
| Construction Permit Expires | 2013-02-23 | |
| Change of Owner | 2016-10-07 | Operator changed from 2050, ORION PETRO CORP to 9722, PIN OAK ENERGY PARTNERS LLC |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2011-12-06 | 4686 | 4768 | 33 |
| 4686 | 4768 | 33 | |
| 4686 | 4768 | 33 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2011-09-06 | H2O | 15 | 64980 Gal | 38000 | Universal Well Services Inc. |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2011 | ORION PETRO CORP | 1663.00 | 297.00 | 94 |
| 2012 | ORION PETRO CORP | 9433.00 | 1255.00 | 366 |
| 2013 | ORION PETRO CORP | 4756.00 | 838.00 | 365 |
| 2014 | ORION PETRO CORP | 2864.00 | 462.00 | 365 |
| 2015 | ORION PETRO CORP | 3525.00 | 491.00 | 365 |
| 2016 | ORION PETRO CORP | 2802.00 | 361.00 | 273 |
| 2017 | PIN OAK ENERGY PARTNERS LLC | 4201.00 | 542.00 | 365 |
| 2018 | PIN OAK ENERGY PARTNERS LLC | 4066.00 | 427.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2011 | ORION PETRO CORP | Brine | 1197 | 94 |
| 2012 | ORION PETRO CORP | Brine | 410 | 366 |
| 2013 | ORION PETRO CORP | Brine | 174 | 365 |
| 2014 | ORION PETRO CORP | Brine | 35 | 365 |
| 2015 | ORION PETRO CORP | Brine | 35 | 365 |
| 2016 | ORION PETRO CORP | Brine | 77 | 273 |
| 2017 | PIN OAK ENERGY PARTNERS LLC | Brine | 287 | 365 |
| 2018 | PIN OAK ENERGY PARTNERS LLC | Brine | 77 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -316911163 | 2011-7-19 0:00: | DD | No Violations | |
| 0148978707 | 2018-04-23 | Production Wells | No Violations | Status check inspection of this Clinton Sandstone well. My inspection found the well equipped with 1.5 rods and tubing and operating with the aid of a natural gas powered pumping unit. This well produces to a diked tank battery to the south and contains two (2) 100 barrel tanks, a 35 barrel poly tank, and a vertical separator with an associated meter run. A gauge at the separator indicates a pressure of 50psi and the meter chart indicates a differential production pressure of 40psi. The required ID is posted at the tank battery. No violations. |
| 0316911163 | 2011-07-19 | Drill / Deepen / Reopen | No Violations | I performed a rig inspection on Poulson rig1. The rig crew were running into the hole with the 4 1/2 casing. This inspection satisfies 1501:9-9-03. There were no violations at this time. |
| 0970788161 | 2011-08-02 | Preliminary Restoration | No Violations | The drilling pits are closed. The rig is gone. There were no violations at this time. |
| 1311011896 | 2011-07-18 | Drill / Deepen / Reopen | No Violations | I performed a rig inspection on Poulson rig 1. The drilling depth was 4753 and drilling in the Clinton. This inspection satisfies 1501:9-9-03. There were no violations at this time. |
| 1311102804 | 2011-07-19 | Drill / Deepen / Reopen | No Violations | I witnessed the cementing of the 4 1/2 casing by Petroset on Poulsons rig. There were no violations at this time. |
| 1311339879 | 2011-07-13 | Drill / Deepen / Reopen | No Violations | Poulson Drilling is moving on location. The pits will be dug and lined after the rig is on site. No violations at this time. |
| 148978707 | 2018-4-23 0:00: | PW | No Violations | 0.40 |
| 1564753251 | 2019-8-2 0:00:0 | PL | No Violations | 0.70 |
| 970788161 | 2011-8-2 0:00:0 | PL | No Violations |
For data sources see[9]