If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-133-24397 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.31,"lon":-81.16,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Portage | |
| Municipality: Hiram Township | |
| Operator Name: CEDAR VALLEY ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: COLLIER UNIT | |
| License Status: Producing | |
| License Date: 2010-09-27 | |
| Spud Date: 2010-10-25 | |
| Spud Drilling Contractor: POULSON DRILLING | |
| Final Drill Date: 2010-10-30 | |
| Well Total Depth: 4519.00 ft | |
| Configuration: Vertical | |
| Latitude: 41.310000 | |
| Longitude: -81.160000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2010-09-27 | Proposed Formations:CLINTON, Issued Date:9/27/2010, Expired Date:9/26/2012 12:00:00 PM, Drilling unit acres:40.93, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2010-10-30 | |
| Completion Report Received | 2011-01-07 | |
| Construction Permit Expires | 2012-09-26 | |
| Record Last Modified | 2017-10-24 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2011-05-09 | 4274 | 4319 | 37 |
| 4274 | 4319 | 37 | |
| 4274 | 4319 | 37 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2010-11-08 | H2O | 15 | 90084 Gal | 60000 | Universal Well Services Inc. |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2011 | CEDAR VALLEY ENERGY INC | 54.00 | 113.00 | 143 |
| 2012 | CEDAR VALLEY ENERGY INC | 2576.00 | 691.00 | 366 |
| 2013 | CEDAR VALLEY ENERGY INC | 2245.00 | 688.00 | 365 |
| 2014 | CEDAR VALLEY ENERGY INC | 2319.00 | 553.00 | 365 |
| 2015 | CEDAR VALLEY ENERGY INC | 2469.00 | 577.00 | 365 |
| 2016 | CEDAR VALLEY ENERGY INC | 2761.00 | 458.00 | 365 |
| 2017 | CEDAR VALLEY ENERGY INC | 2642.00 | 369.00 | 365 |
| 2018 | CEDAR VALLEY ENERGY INC | 2536.00 | 405.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2011 | CEDAR VALLEY ENERGY INC | Brine | 1077 | 143 |
| 2012 | CEDAR VALLEY ENERGY INC | Brine | 1088 | 366 |
| 2013 | CEDAR VALLEY ENERGY INC | Brine | 808 | 365 |
| 2014 | CEDAR VALLEY ENERGY INC | Brine | 481 | 365 |
| 2015 | CEDAR VALLEY ENERGY INC | Brine | 554 | 365 |
| 2016 | CEDAR VALLEY ENERGY INC | Brine | 445 | 365 |
| 2017 | CEDAR VALLEY ENERGY INC | Brine | 302 | 365 |
| 2018 | CEDAR VALLEY ENERGY INC | Brine | 262 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -102848855 | 2010-10-27 0:00 | DD | No Violations | |
| -1156619764 | 2011-9-27 0:00: | PL | No Violations | |
| -348715054 | 2011-6-23 0:00: | DD | No Violations | |
| 0102848855 | 2010-10-27 | Drill / Deepen / Reopen | No Violations | Poulson is drilling ahead on air/soap. The pits are lined and in good condition. |
| 0348715054 | 2011-06-23 | Drill / Deepen / Reopen | No Violations | The well was drilled last fall and preliminary restoration is due next month. However, Cedar Valley is still evaluating the economic potential for this well. Water production has and continues to place an economic burden on the well. I spoke with Tim Cosma on site and reminded him of the deadline. He anticipates that a decision on plugging or producing this well will be made within the next 60 days. |
| 1029240781 | 2010-10-25 | Drill / Deepen / Reopen | No Violations | Poulson Drilling has moved on location and will spud the well later today. The pits are lined and are being filled. |
| 1156619764 | 2011-09-27 | Preliminary Restoration | No Violations | Preliminary Restoration is approved. |
| 1288744594 | 2010-10-28 | Drill / Deepen / Reopen | No Violations | Poulson Drilling is drilling ahead with air/soap. The pits are lined and in good condition. No violations at this time. |
| 1660815044 | 2011-01-19 | Drill / Deepen / Reopen | No Violations | The well has been drilled and completed with a pump jack. The well is connected to a 300 bbl frac tank located near the wellhead. Cedar Valley is pumping the well to determine the economic viability of the well. |
| 2143787641 | 2020-1-15 0:00: | PW | No Violations | 0.50 |
For data sources see[9]