X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-133-24394

Well Details

Well ID: 34-133-24394
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: SUMMIT PETROLEUM INC
Well Pad ID:
Farm/Lease Name: ST.CLAIR UNIT
License Status: Producing
License Date: 2010-08-09
Spud Date: 2010-11-22
Spud Drilling Contractor: POULSON DRILLING
Final Drill Date: 2010-11-29
Well Total Depth: 4153.00 ft
Configuration: Vertical
Latitude: 41.250000
Longitude: -81.360000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2010-08-09 Proposed Formations:CLINTON, Issued Date:8/9/2010, Expired Date:8/8/2012 12:00:00 PM, Drilling unit acres:47.37, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2010-08-20 ADDED THE FOLLOWING COMMENT: "TANK BATTERY DISTANCE TO HOMES REDUCED 100 FEET PERSUANT TO ORC. 1509.21 (A)".
Correction to Well 2010-10-29 ADDED NEW PERMIT CONDITION (KNOX CONDITIONS); CHANGED TOTAL DEPTH TO 6450'; CHANGED PROPOSED FORMATION TO "CLINTON THRU ROSE RUN"; CHANGED CASING PROGRAM.
Reached Total Depth 2010-11-29
Construction Permit Expires 2011-08-09
Completion Report Received 2011-08-15
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2011-10-06 3939 3987 42
3939 3987 42
3939 3987 42

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2011-05-20 H2O 0 87800 Gal 50000 Universal Well Services Inc.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2011 SUMMIT PETROLEUM INC 3673.00 545.00 365
2012 SUMMIT PETROLEUM INC 8794.00 555.00 366
2013 SUMMIT PETROLEUM INC 9603.00 423.00 365
2014 SUMMIT PETROLEUM INC 7708.00 226.00 365
2015 SUMMIT PETROLEUM INC 6954.00 113.00 365
2016 SUMMIT PETROLEUM INC 6727.00 213.00 365
2017 SUMMIT PETROLEUM INC 6316.00 112.00 365
2018 SUMMIT PETROLEUM INC 6156.00 117.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2011 SUMMIT PETROLEUM INC Brine 1569 365
2012 SUMMIT PETROLEUM INC Brine 379 366
2013 SUMMIT PETROLEUM INC Brine 267 365
2014 SUMMIT PETROLEUM INC Brine 128 365
2015 SUMMIT PETROLEUM INC Brine 140 365
2016 SUMMIT PETROLEUM INC Brine 65 365
2017 SUMMIT PETROLEUM INC Brine 124 365
2018 SUMMIT PETROLEUM INC Brine 121 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1008295833 2011-7-1 0:00:0 PL No Violations
-1314797798 2011-9-27 0:00: PL No Violations
-133162681 2010-12-2 0:00: UD No Violations
-182567719 2011-6-20 0:00: PL No Violations
-442868772 2010-12-6 0:00: UD No Violations
0133162681 2010-12-02 Urban Drill / Deepen / Reopen No Violations Poulson Drilling is moving off location. The pits are fenced, lined and in good condition. No violations at this time.
0182567719 2011-06-20 Preliminary Restoration No Violations Preliminary restoration is past due. I met on site with the Alan from Summit and Don Caporaletti to discuss restoration requirements. Weather permitting they intend to have the affected area graded, seeded and mulched by the first of next week.
0213544521 2011-02-03 Urban Drill / Deepen / Reopen No Violations The well has been fraced and the pits have been solidified and covered. The tank battery has not been built. No violations at this time.
0215527119 2018-03-20 Production Wells No Violations Status check inspection of this Clinton Sandstone well. My inspection found the wellhead fenced and locked and operating with the aid of a 4 casing plunger system. This well produces to a diked, fenced, and locked tank battery along the lease road and contains two (2) 100 barrel tanks, one (1) 50 barrel tank, and a horizontal separator. There is a domestic tap and meter on the separator sales line. The required ID is posted at the tank battery. No violations.
0442868772 2010-12-06 Urban Drill / Deepen / Reopen No Violations Chemtech is on site with two loads of dust to solidify the drilling pits.
0456355549 2011-04-12 UrbanPreliminary Restoration No Violations Summit Petroleum requested a preliminary restoration extension in a letter dated April 7. The request letter did not mention a specific time but permission is hereby granted for preliminary restoration to be completed by June 1, 2011. Failure to complete the required work in a satisfactory manner will result in a compliance notice for failure to complete restoration as required.
0800583687 2010-11-22 Urban Drill / Deepen / Reopen No Violations Poulson Drilling is moving on location and should spud the well later today. The pits are being dug by Palmer Excavating.
1008295833 2011-07-01 Preliminary Restoration No Violations The affected area has been graded, seeded and mulched. Preliminary restoration will be approved as soon as the grass has started growing.
1288961781 2010-11-02 Urban Drill / Deepen / Reopen No Violations Summit Petroleum has started building the drilling location. The lease road is in and the location has been cleared. The permit is posted as required.
1302572978 2011-04-06 Urban Drill / Deepen / Reopen No Violations Status check inspection found that the well has not been completed, the tank battery has not been set and more importantly, preliminary restoration has not been completed. Preliminary restoration was due the first part of March. I contacted Summit and advised them of the deadlines, that they were in violation and suggested that they request an extension to the deadline.
1314797798 2011-09-27 Preliminary Restoration No Violations Preliminary Restoration is approved.
2004057497 2010-11-04 Urban Drill / Deepen / Reopen No Violations The lease road and location have been built. The drilling rig is scheduled to arrive next week.
213544521 2011-2-3 0:00:0 UD No Violations
215527119 2018-3-20 0:00: PW No Violations 0.90
456355549 2011-4-12 0:00: UL No Violations
800583687 2010-11-22 0:00 UD No Violations

For data sources see[9]

References