If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-133-24386 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.26,"lon":-81.27,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Portage | |
Municipality: Shalersville Township | |
Operator Name: NORTHWOOD ENERGY CORP | |
Well Pad ID: | |
Farm/Lease Name: FABJANCIC J & B | |
License Status: Producing | |
License Date: 2011-02-07 | |
Spud Date: 2011-07-01 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2011-07-07 | |
Well Total Depth: 4434.00 ft | |
Configuration: Vertical | |
Latitude: 41.260000 | |
Longitude: -81.270000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2010-01-08 | Proposed Formations:CLINTON, Issued Date:1/8/2010, Expired Date:1/8/2011 6:00:00 AM, Drilling unit acres:112.61, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2011-02-07 | Proposed Formations:CLINTON, Issued Date:2/7/2011, Expired Date:2/6/2013 12:00:00 PM, Drilling unit acres:112.61, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2011-07-07 | |
Completion Report Received | 2011-11-29 | |
Construction Permit Expires | 2012-02-07 | |
Change of Owner | 2015-05-29 | Operator changed from 1, HOPEWELL OIL & GAS DEVELOPMENT to 9488, SIBERIAN SOLSTICE ENERGY LLC |
Change of Owner | 2017-08-18 | Operator changed from 9488, SIBERIAN SOLSTICE ENERGY LLC to 1634, NORTHWOOD ENERGY CORP |
Record Last Modified | 2017-08-18 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2012-01-10 | 4170 | 4238 | 273 |
4170 | 4238 | 273 | |
4170 | 4238 | 273 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2011-08-19 | H2O | 15 | 85133 Gal | 420 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | HOPEWELL OIL & GAS DEVELOPMENT | 2855.00 | 762.00 | 366 |
2013 | HOPEWELL OIL & GAS DEVELOPMENT | 1611.00 | 1019.00 | 365 |
2014 | HOPEWELL OIL & GAS DEVELOPMENT | 862.00 | 1122.00 | 365 |
2015 | HOPEWELL OIL & GAS DEVELOPMENT | 109.00 | 328.00 | 365 |
2016 | SIBERIAN SOLSTICE ENERGY LLC | 68.00 | 157.00 | 365 |
2017 | NORTHWOOD ENERGY CORP | 0.00 | 0.00 | 0 |
2018 | NORTHWOOD ENERGY CORP | 256.00 | 182.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 2106 | 366 |
2013 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 792 | 365 |
2014 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 563 | 365 |
2015 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 118 | 365 |
2016 | SIBERIAN SOLSTICE ENERGY LLC | Brine | 66 | 365 |
2017 | NORTHWOOD ENERGY CORP | Brine | 0 | 0 |
2018 | NORTHWOOD ENERGY CORP | Brine | 180 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1078649875 | 2011-7-6 0:00:0 | DD | No Violations | |
-1281421348 | 2011-6-30 0:00: | DD | No Violations | |
-1730677798 | 2011-8-30 0:00: | PL | No Violations | |
-1933101429 | 2011-7-7 0:00:0 | DD | No Violations | |
-1973703264 | 2011-12-28 0:00 | PL | No Violations | |
-303841999 | 2011-7-25 0:00: | PL | No Violations | |
0303841999 | 2011-07-25 | Preliminary Restoration | No Violations | The rig is gone and the debris has been removed. The pits are closed. There were no violations at this time. |
0405113703 | 2011-07-05 | Drill / Deepen / Reopen | No Violations | I performed a rig inspection on Poulson rig 1. The drilling depth was 2646 and drilling on air. This inspection satisfies 1501:9-9-03. There were no violations at this time. |
0781658232 | 2011-07-02 | Drill / Deepen / Reopen | No Violations | I performed a rig inspection on Poulson rig #1. The crew were running into the hole with 8 5/8 casing. This inspection satisfies 1501:9-9-03. There were no violations at this time. |
1078649875 | 2011-07-06 | Drill / Deepen / Reopen | No Violations | I performed a rig inspection on Poulson rig 1. The rig crew were making a connection at 3722. The rig was drilling on air. This inspection satisfies 1501:9-9-03. There were no violations at this time. |
1281421348 | 2011-06-30 | Drill / Deepen / Reopen | No Violations | Wade Pol excavating was making the drilling location. Roy Poulsons rig and equipment were off the drilling location. There were no violations at this time. |
1309701043 | 2011-07-02 | Drill / Deepen / Reopen | No Violations | I witnessed the cementing of the 8 5/8 casing. There was a problem with 3 joints of the 8 5/8 casing. The joints were welded in the middle and 1 had two welds on it. I called Jerry Henderson(740-704-6132) of Hopewell in Zanesville to tell him about the problem. Roy Poulson had 3 joints of 20# 8 5/8 casing in his yard that he would bring up to the location. The decision was made to bring Poulsons casing up to run into the hole. Petroset pumped the cement job. There were no violations at this time. |
1730677798 | 2011-08-30 | Preliminary Restoration | No Violations | The top soil is getting pushed back onto the drilling location. There were no violations at this time. |
1883775218 | 2011-07-07 | Drill / Deepen / Reopen | No Violations | Chris Grimm and myself witnessed the cementing of the 4 1/2 casing. There were no violations at this time. |
1933101429 | 2011-07-07 | Drill / Deepen / Reopen | No Violations | I performed a rig inspection on Poulson rig 1. The rig crew were running 4 1/2 casing. The TD was 4434. This inspection satisfies 1501:9-9-03. There were no violations at this time. |
1973703264 | 2011-12-28 | Preliminary Restoration | No Violations | Some vegetation has been established. The well was not in production yet and identification (ID) signs have not been posted. I called Mark Smith who said he has the ID signs in his truck and will install them by weeks end. |
405113703 | 2011-7-5 0:00:0 | DD | No Violations | |
781658232 | 2011-7-2 0:00:0 | DD | No Violations |
For data sources see[9]