If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-133-24369 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.2,"lon":-81.23,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Portage | |
| Municipality: Ravenna Township | |
| Operator Name: RAB OIL & GAS LLC | |
| Well Pad ID: | |
| Farm/Lease Name: BONNER FARM | |
| License Status: Producing | |
| License Date: 2008-07-15 | |
| Spud Date: 2008-09-10 | |
| Spud Drilling Contractor: GREAT PLAINS EXPLORATION LLC | |
| Final Drill Date: 2008-09-22 | |
| Well Total Depth: 4544.00 ft | |
| Configuration: Vertical | |
| Latitude: 41.200000 | |
| Longitude: -81.230000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2008-07-15 | Proposed Formations:CLINTON, Issued Date:7/15/2008, Expired Date:7/15/2009 6:00:00 AM, Drilling unit acres:73, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2008-09-22 | |
| Completion Report Received | 2008-11-05 | |
| Construction Permit Expires | 2009-07-15 | |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2008-12-16 | 4342 | 4407 | 32 |
| 4342 | 4407 | 32 | |
| 4342 | 4407 | 32 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 157 Bbl | 100000 | 680M SCF NITROGEN ASSIST |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2008 | RAB OIL & GAS LLC | 0.00 | 0.00 | 0 |
| 2009 | RAB OIL & GAS LLC | 2147.00 | 344.00 | 365 |
| 2010 | RAB OIL & GAS LLC | 1201.00 | 76.00 | 365 |
| 2011 | RAB OIL & GAS LLC | 95.00 | 76.00 | 365 |
| 2012 | RAB OIL & GAS LLC | 0.00 | 0.00 | 0 |
| 2014 | RAB OIL & GAS LLC | 45.00 | 21.00 | 365 |
| 2015 | RAB OIL & GAS LLC | 55.00 | 15.00 | 365 |
| 2016 | RAB OIL & GAS LLC | 100.00 | 20.00 | 365 |
| 2017 | RAB OIL & GAS LLC | 100.00 | 20.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2008 | RAB OIL & GAS LLC | Brine | 0 | 0 |
| 2009 | RAB OIL & GAS LLC | Brine | 2840 | 365 |
| 2010 | RAB OIL & GAS LLC | Brine | 664 | 365 |
| 2011 | RAB OIL & GAS LLC | Brine | 350 | 365 |
| 2012 | RAB OIL & GAS LLC | Brine | 0 | 0 |
| 2014 | RAB OIL & GAS LLC | Brine | 50 | 365 |
| 2015 | RAB OIL & GAS LLC | Brine | 30 | 365 |
| 2016 | RAB OIL & GAS LLC | Brine | 30 | 365 |
| 2017 | RAB OIL & GAS LLC | Brine | 30 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -132632875 | 2008-11-20 0:00 | DD | No Violations | |
| -2134853875 | 2008-9-24 0:00: | DD | No Violations | |
| 0132632875 | 2008-11-20 | Drill / Deepen / Reopen | No Violations | The tank battery has been built and fenced. It appears that the well will be turned on in the near future. |
| 0509299211 | 2008-09-02 | Drill / Deepen / Reopen | No Violations | The location has been built and the pits dug, lined and partially filled. The fence needs to be installed around the pits. I contacted Tim Reilly with John D who reported that the fence will be installed as soon as possible. |
| 0851840299 | 2008-09-29 | Drill / Deepen / Reopen | No Violations | The drilling pits have been solidified and are being covered over. The frac job is scheduled for mid week. No violations at this time. |
| 1222364795 | 2008-09-17 | Drill / Deepen / Reopen | No Violations | Great Plains is drilling ahead and should TD later this week. The pits are fenced, lined and in good condition. |
| 1974485019 | 2009-09-16 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
| 2134853875 | 2008-09-24 | Drill / Deepen / Reopen | No Violations | Great Plains Exploration rig 1313 has moved to the next location on the same property. The pits are still fenced and lined. No violation at this time. |
| 509299211 | 2008-9-2 0:00:0 | DD | No Violations | |
| 851840299 | 2008-9-29 0:00: | DD | No Violations |
For data sources see[9]