If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-133-24348 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.18,"lon":-81.33,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Portage | |
Municipality: Franklin Township | |
Operator Name: PIN OAK ENERGY PARTNERS LLC | |
Well Pad ID: | |
Farm/Lease Name: LAKE ROCKWELL | |
License Status: Producing | |
License Date: 2007-07-26 | |
Spud Date: 2007-08-25 | |
Spud Drilling Contractor: WILDCAT DRILLING | |
Final Drill Date: 2007-08-30 | |
Well Total Depth: 4451.00 ft | |
Configuration: Directional | |
Latitude: 41.180000 | |
Longitude: -81.330000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2007-07-26 | Proposed Formations:CLINTON, Issued Date:7/26/2007, Expired Date:7/25/2008 6:00:00 AM, Drilling unit acres:40.79, Proposed Well Type:OG, Proposed Well Class:POOL |
Completed | 2007-08-30 | |
Reached Total Depth | 2007-08-30 | |
Completion Report Received | 2007-12-19 | |
Correction to Well | 2008-04-25 | UNIT SIZE INCREASED TO 41.10 ACRES. CHANGE IN TARGET INFORMATION--NEW FOOTAGE= 21'NL & 800'EL OF LOT 58; NEW Y= 555,839; NEW TARGET ELEVATION= 1052'. |
Construction Permit Expires | 2008-07-25 | |
Change of Owner | 2018-08-21 | Operator changed from 3434, GONZOIL INC to 9722, PIN OAK ENERGY PARTNERS LLC |
Record Last Modified | 2018-08-21 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2008-03-07 | 4261 | 4319 | 30 |
4261 | 4319 | 30 | |
4261 | 4319 | 30 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 99000 Gal | 80000 | 250M SCF NITROGEN ASSIST |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | GONZOIL INC | 14758.00 | 2620.00 | 275 |
2009 | GONZOIL INC | 15780.00 | 1516.00 | 365 |
2010 | GONZOIL INC | 10478.00 | 1177.00 | 365 |
2011 | GONZOIL INC | 6595.00 | 970.00 | 365 |
2012 | GONZOIL INC | 5587.00 | 841.00 | 366 |
2013 | GONZOIL INC | 4145.00 | 779.00 | 365 |
2014 | GONZOIL INC | 4195.00 | 730.00 | 365 |
2015 | GONZOIL INC | 4207.00 | 699.00 | 365 |
2016 | GONZOIL INC | 4571.00 | 609.00 | 365 |
2017 | GONZOIL INC | 4495.00 | 581.00 | 365 |
2018 | GONZOIL INC | 2166.00 | 262.00 | 180 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | GONZOIL INC | Brine | 520 | 275 |
2009 | GONZOIL INC | Brine | 300 | 365 |
2010 | GONZOIL INC | Brine | 150 | 365 |
2011 | GONZOIL INC | Brine | 21 | 365 |
2012 | GONZOIL INC | Brine | 50 | 366 |
2013 | GONZOIL INC | Brine | 39 | 365 |
2014 | GONZOIL INC | Brine | 36 | 365 |
2015 | GONZOIL INC | Brine | 55 | 365 |
2016 | GONZOIL INC | Brine | 82 | 365 |
2017 | GONZOIL INC | Brine | 33 | 365 |
2018 | PIN OAK ENERGY PARTNERS LLC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1151829027 | 2007-8-24 0:00: | DD | No Violations | |
-1762254680 | 2008-5-9 0:00:0 | DD | No Violations | |
-1950181037 | 2007-8-27 0:00: | DD | No Violations | |
0003969696 | 2007-09-04 | Drill / Deepen / Reopen | No Violations | Wildcat is moving to the next location, the Rockwell #8 well. The drilling pits are scheduled to be solidified on 9/5. |
1010098021 | 2018-07-17 | UrbanProduction Wells | No Violations | Status check inspection of this directional, Clinton Sandstone well. My inspection found the wellhead fenced, locked, and screened. The wellhead is equipped with 1.5 tubing and operating with the aid of a plunger lift system. Gauges indicate 380psi on the 4.5 production casing and 380psi on the tubing. This well produces to a diked, fenced, and locked tank battery on location. The battery is screened and contains surface equipment consisting of one (1) 140 barrel tank, one (1) 35 barrel poly tank, and one (1) horizontal separator. The tank is equipped with a low pressure relief valve and a 42 gallon, charcoal filter. The chart at the separator indicates a differential production pressure between 60psi and 100psi. The required ID is posted at the tank battery. No violations. |
1151829027 | 2007-08-24 | Drill / Deepen / Reopen | No Violations | Wildcat is moving on the site and will spud the well later tonight. |
1188920195 | 2007-08-31 | Drill / Deepen / Reopen | No Violations | On site to witness grouting the annulus space between the 8-5/8 surface casing and the borehole. Cement did not circulate to surface on the surface job. Placed 10 cubic yards of 9 sack grout in the annular space and filled the rathole and mousehole. |
1235374610 | 2008-01-11 | Production Wells | No Violations | The well is in production and the site has been rough graded. Preliminary restoration is due in the spring. No violations at this time. |
1762254680 | 2008-05-09 | Drill / Deepen / Reopen | No Violations | The site needs to be finish graded and seeded before preliminary restoration is approved. |
1909702535 | 2008-07-29 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
1950181037 | 2007-08-27 | Drill / Deepen / Reopen | No Violations | Wildcat is drilling ahead. The pits are lined, fenced and in good condition. No violations at this time. |
3969696 | 2007-9-4 0:00:0 | DD | No Violations |
For data sources see[9]