X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-133-22510

Well Details

Well ID: 34-133-22510
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Ravenna Township
Operator Name: BECK ENERGY CORPORATION
Well Pad ID:
Farm/Lease Name: BECK CAROLYN SUE
License Status: Producing
License Date: 1981-02-23
Spud Date: 1981-05-18
Spud Drilling Contractor:
Final Drill Date: 1981-05-22
Well Total Depth: 4330.00 ft
Configuration: Vertical
Latitude: 41.170000
Longitude: -81.270000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1981-02-23 1888 BECK ENERGY CORP GeoDate 2/23/81
Original Spud 1981-05-18
Completed 1981-05-22
Reached Total Depth 1981-05-22
Record Last Modified 2013-10-03

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 4177 4228 15
4177 4228 15
4177 4228 15

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 68000 Gal 50000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 BEARDMORE OIL & GAS CO 9340.00 270.00 0
1985 BECK ENERGY CORPORATION 9869.00 333.00 365
1986 BECK ENERGY CORPORATION 7363.00 138.00 365
1987 BECK ENERGY CORPORATION 5394.00 323.00 365
1988 BECK ENERGY CORPORATION 4948.00 150.00 365
1989 BECK ENERGY CORPORATION 10982.00 335.00 365
1990 BECK ENERGY CORPORATION 1533.00 46.00 365
1991 BECK ENERGY CORPORATION 8222.00 126.00 365
1992 BECK ENERGY CORPORATION 1209.00 161.00 365
1993 BECK ENERGY CORPORATION 8169.00 93.00 365
1994 BECK ENERGY CORPORATION 6469.00 99.00 365
1995 BECK ENERGY CORPORATION 7307.00 150.00 365
1996 BECK ENERGY CORPORATION 8100.00 98.00 365
1997 BECK ENERGY CORPORATION 5552.00 92.00 365
1998 BECK ENERGY CORPORATION 10933.00 152.00 365
1999 BECK ENERGY CORPORATION 9401.00 160.00 0
2000 BECK ENERGY CORPORATION 7211.00 52.00 0
2001 BECK ENERGY CORPORATION 6020.00 50.00 365
2002 BECK ENERGY CORPORATION 9341.00 56.00 365
2003 BECK ENERGY CORPORATION 9922.00 66.00 365
2004 BECK ENERGY CORPORATION 10042.00 146.00 365
2005 BECK ENERGY CORPORATION 8640.00 81.00 365
2006 BECK ENERGY CORPORATION 8983.00 60.00 365
2007 BECK ENERGY CORPORATION 8145.00 61.00 365
2008 BECK ENERGY CORPORATION 7264.00 119.00 365
2010 BECK ENERGY CORPORATION 6220.00 111.00 365
2011 BECK ENERGY CORPORATION 6029.00 55.00 365
2012 BECK ENERGY CORPORATION 6490.00 56.00 366
2013 BECK ENERGY CORPORATION 4651.00 0.00 365
2014 BECK ENERGY CORPORATION 4190.00 37.00 365
2015 BECK ENERGY CORPORATION 4529.00 0.00 365
2016 BECK ENERGY CORPORATION 4016.00 57.00 365
2017 BECK ENERGY CORPORATION 4101.00 62.00 365
2018 BECK ENERGY CORPORATION 2681.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 BEARDMORE OIL & GAS CO Brine 0 0
1985 BECK ENERGY CORPORATION Brine 70 365
1986 BECK ENERGY CORPORATION Brine 145 365
1987 BECK ENERGY CORPORATION Brine 370 365
1988 BECK ENERGY CORPORATION Brine 230 365
1989 BECK ENERGY CORPORATION Brine 113 365
1990 BECK ENERGY CORPORATION Brine 70 365
1991 BECK ENERGY CORPORATION Brine 90 365
1992 BECK ENERGY CORPORATION Brine 73 365
1993 BECK ENERGY CORPORATION Brine 70 365
1994 BECK ENERGY CORPORATION Brine 85 365
1995 BECK ENERGY CORPORATION Brine 72 365
1996 BECK ENERGY CORPORATION Brine 28 365
1997 BECK ENERGY CORPORATION Brine 52 365
1998 BECK ENERGY CORPORATION Brine 67 365
1999 BECK ENERGY CORPORATION Brine 71
2000 BECK ENERGY CORPORATION Brine 0
2001 BECK ENERGY CORPORATION Brine 40 365
2002 BECK ENERGY CORPORATION Brine 40 365
2003 BECK ENERGY CORPORATION Brine 0 365
2004 BECK ENERGY CORPORATION Brine 110 365
2005 BECK ENERGY CORPORATION Brine 80 365
2006 BECK ENERGY CORPORATION Brine 78 365
2007 BECK ENERGY CORPORATION Brine 35 365
2008 BECK ENERGY CORPORATION Brine 35 365
2010 BECK ENERGY CORPORATION Brine 43 365
2011 BECK ENERGY CORPORATION Brine 38 365
2012 BECK ENERGY CORPORATION Brine 50 366
2013 BECK ENERGY CORPORATION Brine 35 365
2014 BECK ENERGY CORPORATION Brine 0 365
2015 BECK ENERGY CORPORATION Brine 0 365
2016 BECK ENERGY CORPORATION Brine 37 365
2017 BECK ENERGY CORPORATION Brine 28 365
2018 BECK ENERGY CORPORATION Brine 37 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1206093593 2003-2-3 0:00:0 PW No Violations
-1650917341 2011-8-25 0:00: PW No Violations
1206093593 2003-02-03 Production Wells No Violations Status check inspection - no violations at this time. Shares the tank battery with the Beck #2 (P-2802). Recommend constructing a containment dike around the tank battery.
1633075727 2011-08-22 Production Wells No Violations I received an email from Christine Craycroft , Executive Director of Portage Park District(330-297-7728) about this tank battery. She stated that their were no dike around the stock tank. I investagated the tank battery and found that there were no dike around the tank and separator. I called David Beck(330-592-3322)and told him that there needs to be a dike installed. This tank battery has Permit number 2802 also. Two wells feed into the tank battery. He would have it installed by the end of this week. This complaint continues.
1650917341 2011-08-25 Production Wells No Violations The dike has been installed around the tank battery for permits #2510 and 2802. This complaint is resolved.

For data sources see[9]

References