X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-129-20157

Well Details

Well ID: 34-129-20157
Loading map...
Country: United States
State: Ohio
County: Pickaway
Municipality: Madison Township
Operator Name: CORTLAND ENERGY CO INC
Well Pad ID:
Farm/Lease Name: MCCRAY FARMS-D STRAWSER (SWIW#8)
License Status: Active Injection
License Date: 2004-12-01
Spud Date: 1997-02-06
Spud Drilling Contractor: KILBARGER DRLG
Final Drill Date: 1997-02-06
Well Total Depth: 2767.00 ft
Configuration: Vertical
Latitude: 39.780000
Longitude: -82.890000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1997-01-06 137 ALTHEIRS OIL INC GeoDate 1/6/97
Oil and Gas 1997-01-06 Issued Date 1/6/97 Expired Date 1/6/98 Acres 0050000 Tool Type RTAF Proposed Formation TRENTON-ROME Proposed Depth 00000 Proposed Drill Depth 00000
Completed 1997-02-06 RBDMS Rec
Original Spud 1997-02-06 RBDMS Rec
Reached Total Depth 1997-02-06 RBDMS Rec
Change of Owner 2001-01-29 Operator changed from 137, ALTHEIRS OIL INC to 4260, CORTLAND ENERGY CO INC
APP 2004-12-01 Proposed Formations:ROSE RUN, Issued Date:12/1/2004, Expired Date:12/1/2005 6:00:00 AM, Drilling unit acres:0, Proposed Well Type:SWD, Proposed Well Class:SWIW
Annulus Pressure Monitoring Approved 2005-08-30 RBDMS Rec
Last Compliance Report 2005-08-30 RBDMS Rec
Completion Report Received 2005-10-26 RBDMS Rec
Construction Permit Expires 2005-12-01 RBDMS Rec
Record Last Modified 2017-02-15 RBDMS Rec

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
ACID 15 1200 Gal 0

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1999 ALTHEIRS OIL INC 0.00 453.00 365
2000 ALTHEIRS OIL INC 0.00 119.00 365
2001 CORTLAND ENERGY CO INC 0.00 89.00 24
2003 CORTLAND ENERGY CO INC 0.00 41.00 365
2004 CORTLAND ENERGY CO INC 0.00 149.00 365
2005 CORTLAND ENERGY CO INC 0.00 39.00 365

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1999 ALTHEIRS OIL INC Brine 0 365
2000 ALTHEIRS OIL INC Brine 0 365
2001 CORTLAND ENERGY CO INC Brine 0 24
2003 CORTLAND ENERGY CO INC Brine 80 365
2004 CORTLAND ENERGY CO INC Brine 200 365
2005 CORTLAND ENERGY CO INC Brine 0 365

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1057502940 2018-3-22 0:00: SW No Violations 2.00
-1101562881 2011-3-17 0:00: SW No Violations
-1114350244 2005-8-29 0:00: SW No Violations
-123286240 2005-8-8 0:00:0 SW No Violations
-1247131704 2005-11-17 0:00 SW No Violations
-12771364 2005-10-4 0:00: SW No Violations
-1288978831 2018-8-28 0:00: SW No Violations 2.90
-136086123 2020-7-27 0:00: SW No Violations 1.00
-1482888133 2013-10-23 0:00 SW No Violations
-1595224255 2007-4-11 0:00: SW No Violations
-1707607994 2019-7-31 0:00: SW No Violations 3.00
-1709295524 2013-1-17 0:00: SW No Violations
-1755565710 2009-6-10 0:00: SW No Violations
-1762344688 2012-8-8 0:00:0 SW No Violations
-1873390939 2009-1-6 0:00:0 SW No Violations
-19261335 2014-6-3 0:00:0 SW No Violations
-1926227917 2018-2-16 0:00: SW No Violations
-2073611269 2016-1-21 0:00: SW No Violations 1.50
-350961153 2016-3-7 0:00:0 SW No Violations 1.50
-372773253 2015-3-2 0:00:0 SW No Violations 2.50
-413592307 2019-4-1 0:00:0 SW No Violations 4.40
-47721659 2011-6-29 0:00: SW No Violations
-505501759 2008-12-23 0:00 SW No Violations
-524833284 2007-6-7 0:00:0 SW No Violations
-52891304 2012-6-14 0:00: SW No Violations
-543352479 2020-5-6 0:00:0 SW No Violations
-544219635 2013-7-3 0:00:0 SW No Violations
-555322526 2018-8-3 0:00:0 SW No Violations 1.00
-579815031 2020-5-27 0:00: SW No Violations 2.50
-693848580 2019-4-29 0:00: SW No Violations
-750792555 2006-10-26 0:00 SW No Violations
-877425916 2008-6-11 0:00: SW No Violations
-897487696 2017-9-6 0:00:0 SW No Violations 2.00
000CENA998 1999-07-30 Production Wells No Violations 1509.12
001248i228 2002-02-19 Production Wells Violations Noted WEATHER CONDITIONS: Cloudy and 45 degrees. Inspection reveled No ID posted at the well head and/or the storage tank. On 01/29/2002 well was transferred from Altheirs Oil, Inc. to Cortland Energy Co., Inc.
0012771364 2005-10-04 Salt Water Injection Well No Violations - Water tank has been set in place, dike is completed. Water line lay to injection well, but not connected to tank.

- Operator still needs to install reducer and fitting for pressure gauge.

0019261335 2014-06-03 Salt Water Injection Well No Violations - On site for UIC inspection, ID on well and tank

- Annulus pressure 500 psi Injection pressure 0 on vacuum - Unloading pad free of debris - Tank dike area has a small amount of water in it. - Weather condition heavy rainfall, windy Temp 74 Wet ground conditions

0047721659 2011-06-29 Salt Water Injection Well No Violations - ID at well and tank area, Unloading pad free of water, overflow vault full contacted Bob Atha on this matter. Annulus pressure 520 Injection pressure 0 vacuum. Water meter 785555 gallons = 18,703 barrels.
0052891304 2012-06-14 Salt Water Injection Well No Violations - ID at well and tank. Dike area free of water and debris. Unloading pad clean, overflow vault about half full of water.

- Annulus pressure 540 PSI injection 0 on vacuum water meter reading 234015 gallons flow rate 18 gpm.

0123286240 2005-08-08 Salt Water Injection Well No Violations - On site for well conversion to UIC well. Bob Master of Cortland Energy Co. contact me at 9:00 AM. Operator unable to get service rig in until next week ( week of 9-15-2005)
0182374055 2005-08-31 Salt Water Injection Well No Violations - On site for installing packer and 2-3/8 tubing, witness packer and tubing going into well, check tubing tally. Packer set at 2671 string length.

- Halliburton on site to set packer and to fill annulus with fluid and anhib. - Pressure check well at 900 psi, held pressure for 15 minutes with no loss.

0326351540 2007-06-06 Salt Water Injection Well No Violations - ID on well and tank. Injection pressure 0 (vacuum) Annulus pressure 280 water meter reading 639602 gallons = 15,228 barrels.
0350961153 2016-03-07 Salt Water Injection Well No Violations UIC inspection. The injection pressure was 0 PSI. The annulus pressure was 1.5 PSI.
0354708329 2005-02-16 Production Wells No Violations - ID to Jeff McCray property owner.

- Well not operating, gasoline motor locked up. Well valve are open. - Oil truck was on site on 2/15/2005 accordingly by land owner. - Operator has been approved to convert this well to injection well.

0372773253 2015-03-02 Salt Water Injection Well Violations Noted Inspected the unloading pad, containment dike, tank, injection line, injection pressure and annulus pressure. The access road had a contaminated area 8 by 8 located approximately 6 from the front edge of the unloading pad. A thin coating of oil was floating on the ice and snow that was melting on the access road. I called Bob Masters about the contamination and the remediation. The oil must be absorbed and removed. All contaminated material must be taken to an EPA approved land fill. Bob told me that they will send a crew out today to clean it up. Reviewed the brine hauling records and the last trucks at the site were Hocking Hills Energy on 3-1-15 (three loads).
0413592307 2019-04-01 Salt Water Injection Well No Violations Inspected the unloading pad, containment dike, tank, injection pressure and annulus pressure. Identification is posted. The containment dike has 8 inched of water in it. The water has field tested with Quantabs. The water has less than 250 ppm CL. I called and talked to Bob Masters about the containment dike water. Bob said that it will be pumped into the tank today.
0436765281 2008-04-22 Salt Water Injection Well No Violations - inspection of well to check if 2 inch ball valve has been replace. At the time of inspection valve has not been replace, annulus pressure has leaked off because of this broken valve. Injection pressure is on vacuum.
0456153229 2007-01-10 Salt Water Injection Well Violations Noted - Well injection pressure 0 ( vacuum) annulus pressure 220 ID on well No ID on tank will contact operator. Dike area free of water. Unable to read water meter. Meter is located on top of water tank.

- Landowner question if operator is aloud to bring water from other well and pump into tank for disposal.

0505501759 2008-12-23 Salt Water Injection Well No Violations - ID on well and tank. Ball valve broken on annuls where gauge mount for reading, unable to check annulus pressure.

- Dike area has water frozen in it, unable to read water meter. - Mr. Jeff McCray landowner ask if a letter could be sent to operator for repairs to drainage tiles that were damage when water line from tank to well was installed. This has caused damage to other field tiles. Also Mr. McCray want production line from where production tank was located to well remove.

0524833284 2007-06-07 Salt Water Injection Well No Violations Working on unloading facility. Pad with curb has been poured. Was to Mike Mitchell on setting vault. Per Mike hole was too deep and waiting for contractor to show up later today to fill some of hole in. Checked well pressures.
0544219635 2013-07-03 Salt Water Injection Well No Violations - ID at well and tank, Annulus pressure 520 Injection pressure 0

- Water meter reading 247992 gallons = 5,904 barrels - unloading pad vault is about 1/2 full of water.

0555322526 2018-08-03 Salt Water Injection Well No Violations I met with landowner Mr. Jeff MCcray at his home at 8:00 AM. The reason for this meeting was to determine if he was happy with the crop growth where the brine had spilled. We inspected the crops where the brine had spilled. The crops were stunted. Mr. MCcray stated he is receiving compensation from well owner Mr. Bob Masters. Mr. MCcray stated he did not want the soil in his field removed and stated the crops would be back to normal strength by next year. I could not take a new GPS reading today due to lack of battery power.
0667247170 2007-05-31 Administrative Inspection No Violations - Received phone call from Bob Atha today, operator is stating to construct loading / unloading pad for the well. Phone call to Tom Tomastik on condition of well construction to UIC for pad. Pad was listed in UIC permit.

- Operator plans to place form for pad first of next week and to set vault next Wednesday June 6.

0669062454 2016-11-22 Salt Water Injection Well No Violations Inspected the unloading pad, containment dike, tank, injection pressure and annulus pressure. Identification posted. The containment dike is free of fluids.
0693848580 2019-04-29 Salt Water Injection Well Violations Noted Our records indicate that the Division has not received the Salt Water Injection Well Annual Report (Form 204) that was due on April 15th for 2018, Please submit the Form 204 to the Division by 5/29/2019.
0721200941 2016-07-27 Salt Water Injection Well No Violations Inspected the unloading pad, containment dike, tank, injection line, injection pressure and annulus pressure. Identification posted.
0750792555 2006-10-26 Salt Water Injection Well No Violations - ID on well and tank.

- Injection on vacuum, annulus 280 psi. - Water meter 341537 gallons = 8,131 barrels

0757395589 2004-10-12 Preliminary Restoration No Violations On site for preliminary inspection, well clear of drilling debris and tank area clear. Preliminary was approved by previous inspector on paper report.
0802100102 2017-06-01 Salt Water Injection Well Violations Noted Salt water injection well inspection. The injection pressure was 0 PSI, the annulus pressure was 151 PSI. I noticed deer tracks near the wellhead witch is indicative of a brine spill. Using high range quantabs I was able to determine the approximate size of the contamination. The approximate size of the spill is 100 foot half circle starting at the well head. The affected area is south of the wellhead. The results of the quantabs ranged from maxing out the high range quantabs to approximately 1600 PPM. I have contacted well owner Bob Masters to inform him of the pending violation and the results of the field test.
0877425916 2008-06-11 Salt Water Injection Well No Violations - No ID at well or tank, contacted Bob Atha.

- Annuls 600 psi injection 0 on vacuum. Water meter 394965 gallons = 9,403 barrels.

0897487696 2017-09-06 Salt Water Injection Well No Violations My inspection today revealed the pollution and contamination has not ben cleaned up. The landowner has not decided if he wants the topsoil that contained salt water removed. I will make contact with the landowner regarding this matter at a latter date.
0955738905 2018-05-30 Salt Water Injection Well Violations Noted Inspected the unloading pad, containment dike, tank, injection pressure and annulus pressure. Identification is posted at the facility and the well site. The containment dike has 12 inches of fluid in it. The fluid was tested with a High Range Quantab. The Quantab measured 2449 ppm Cl. I called Bob Masters at 10:23 am and informed him that the containment dike has 12 inches of brine and it must be pumped into the tank for disposal in the injection well. Bob told me that he is coming to the site to pump out the dike.
0966577825 2005-08-16 Salt Water Injection Well No Violations - Rig moved on 8/12/2005 operator has dug pit, and rig up. Joint inspection with Jeff Fry.

- Driller putting sand into well to protect injection zone. Wait for sand to settle, operator is leaving to retrieve tools to use tomorrow. Off site at 10:15 AM

1007953166 2010-01-05 Salt Water Injection Well No Violations - ID at well and tank, Annulus pressure 380 injection 0 on vacuum. Debris at well area.

- Water meter reading 451398 gallons = 10,747 barrels. Unloading pad vault 1/2 full of water. Small amount of water in dike area. - Weather Condition - Temp 16 ground snow covered.

1031542367 2017-03-16 Brine Hauler Violations Noted A Central Ohio Oil truck was parked on the unloading pad after unloading. The Central Ohio Oil truck License # PWB4946 was not labeled for UIC number, Brine, or company phone number. 1509.223 (D) Each registered transporter shall legibly identify with reflective paints all vehicles employed in transporting or disposing of brine. Letters shall be no less than four inches in height and shall indicate the identification number issued by the chief, the word brine, and the name and telephone number of the transporter. Bob Masters was on site and notified of the brine truck labeling requirements.
1036076006 2002-10-31 Production Wells No Violations Inspection conducted at the request of Tom Tomastik UIC section. Review of the well site and production tank battery revealed surrounding area is rolling farm land. Walnut Creek is located to the west of the site and Mud creek to the south. There is no water wells located within a 1000 radius of the location. The lease road leading from Perrill Rd. go past a residence and four (4) out buildings, and is constructed of lime stone and old road materials. WEATHER CONDITIONS: Cloudy and 40 degrees. CC: Tom Tomastik.
1057196202 2003-07-02 Production Wells No Violations - On site for inspection, joint inspection with Jeff Fry, status check of well may be converted into injection well. Well looks capable to produce.
1057502940 2018-03-22 Salt Water Injection Well No Violations The salt water injection well had 95 psi on the annulus and 0 psi on the injection tubing. The dike was relativity free of fluids. Legible identification was posted.
1078930886 2004-03-10 Production Wells Violations Noted - On site for inspection ID at House.

- Well is shut in all ball valves are closed, pulley are heavy rusted. - Tank area 1 tank valve is closed GPS taken at well and tank. - No ID at well or tank. Well not n production. - Contacted operator on 3/11/2004

1101562881 2011-03-17 Salt Water Injection Well No Violations - Operator has posted ID at well, sign also posted at tank and unloading pad.

- Annulus pressure 420 injection pressure 0 Vacuum - The week of March 7, 2011 the operator had acidize well, when the service truck enter onto the lease road they drove off of the road and across an agricultural field, their ruts were back bladed with a dozer. Its unknown if there were any field drainage tiles damage. - Tank area - dike has a small amount of water.

1114350244 2005-08-29 Salt Water Injection Well No Violations - On site for well conversion to UIC.

- Operator cemented 4-1/2 casing in on 8/24/2005, Halliburton contactor for cement job. - Appalachian Well Service doing bond log on well, witness logging of well, by Jeff Fry, Bob Master, and myself. Phone call to Tom Tomastik to approve cement job, cement not at top of requirement on application permit. OK was given, because of the total amount of cement used above the required amount.

1127223210 2005-09-20 Salt Water Injection Well No Violations - On site for well construction progress, water line has been laid on top of ground from propose storage tank area to well, line is connected to well.

- Operator will need to install fittings and 1/4 valve to check annuals pressure. - Dike area is being constructed, inspector wasnt notify, call in to Bob Master to question why he didnt notify. - Pump unit has been removed from well area. Operator still needs to clean old production equipment from well area.

1127240890 2005-09-20 Production Wells No Violations - on site for inspection of well, well is producing gas. Tank and separator is northwest of well along Morris Liest Rd. on the east side.

- ID at pumping and tank area. - Operator has filled in pits, pits are mounded up, bentonite still visible, area will need to be regraded for agriculture use. - Will pass preliminary inspection when grading is completed.

1127240890177644 2005-9-20 0:00: PW No Violations
1129055395 2005-10-06 Salt Water Injection Well No Violations - On site for testing of pipe line from tank to well.

- Pipeline is SDR 7 2 diameter, operator has 1,350 feet of line laying on top of ground, operator plans trench line in as so as possible. - Test started at 8:27 AM @ 240 PSI 8:32 AM @ 240 PSI 8:39AM @ 240 PSI 8:44 AM @ 240 PSI. - 10/06/2005 pass line test, operator started to inject into well.

1131023795 2005-11-03 Salt Water Injection Well No Violations - Well has 0 psi on annulus injection 0 psi ( vacuum). Operator has trench in water disposal line from tank to well.

- Tank area grass has vegetated, operator is keeping water pump from dike area.

1133961601 2005-12-07 Salt Water Injection Well No Violations - Annulus pressure 500 , injection 0 (vacuum) operator still has old pipe fitting and some tubing at well area, will need to remove.

- Tank area, operator has pump water from dike. Water meter reading 3480.11 gal. = 82 barrels - Weather overcast temp. low 20s, ground snow cover.

1136900655 2006-01-10 Salt Water Injection Well No Violations Injection pressure 0 line in under vacuum annulus 480 pressure.

Water meter 14809 gallons = 325 barrels Dike area has about 4 inches of water in it.

1141739452 2006-03-07 Salt Water Injection Well No Violations - On site for inspection, Injection on Vacuum annulus 400 psi.

- Water meter 196.20 gallons = 4.6 barrels - Old production line has been removed, still several valves, pipe fitting, and pipe on site. - Temp 30s Sunny

1150290209 2006-06-07 Salt Water Injection Well No Violations - On site for inspection, ID at well not legible, Annulus pressure 400 injection 0 (vacuum)

- Met with Mr. McCray, he indicated that when water line was laid operator cut two field tiles and never fixed them. - Will request operator to make repairs and move water meter from top of tank.

1165293646 2005-08-17 Salt Water Injection Well No Violations - Well being converted to UIC well. Joint inspection with Jeff Fry.

- On site, wait for driller to show, drill place jars down well to tag sand. Sand bridge off at 1570 driller leaving to retrieve tubing and supply to drill out sand bridge. Will be back on site 8/18/2005

1176310687 2007-04-11 Salt Water Injection Well No Violations - Operator has place ID on Tank and well, operator has place ladder at water tank so water meter on be read.
1190295307 2007-09-20 Salt Water Injection Well Violations Noted - Inspection of well, well has lost mechanical integrity annulus 0 psi on vacuum, injection 0 psi vacuum Violation code 1501:9-3-07 (H)

- Water meter has been removed. Line at water tank to well has been disconnected. - Contacted operator of violation.

1190895706 2007-09-26 Salt Water Injection Well No Violations - On site for inspection of well service, no rig on site. Call service company. Killbarger service company change schedule to service well next week.

- Well is out of operating, and will remain out of service until well integrity is comply with.

1191498069 2007-10-03 Salt Water Injection Well No Violations - 10/01 pull tubing and packer from well, unable to have service truck until Wed. 10/03.

- 10/02 install packer and 5 joints of tubing in well. Power tongs blowed hydraulic hose, shut down for repairs. 10/03 install tubing, Halliburton service truck pumped a total of 33 barrels of fresh water with 5 gallons of inhibitor. Robert Hoffee and Shawn Whitacre Halliburton truck service crew. Chris from Halliburton West Virginia office on site and set Halliburton G-6 packer in compression. Packer set at 2652 at GL, 2646 tubing tally plus 6 for sub. Packer had 25,000 lbs of string weight pulled on it after it was set, pressure released and tubing weight set on packer of about 11,000 lbs. - Pressure test started at 10:41 AM with 920 PSI on ODNR gauge, tested for 15 minutes with no loss of pressure. Tested passed, bleed pressure down on annulus to about 350 psi,

1200509013 2008-01-16 Salt Water Injection Well No Violations - ID at well and tank. Annulus pressure 260 psi injection on vaccum. Water meter 159926 gallons = 3807 barrels
1221502404 2008-09-10 Salt Water Injection Well Violations Noted - Inspection of well, No ID posted. Must have ID at well and tank.

- Over flow water vault for unloading pad full, needs to be pumped. - Liner for dike area needs to be repaired, liner sliding down. - Water meter inoperable. - Injection pressure 0 psi on vaccum, Annulus 600 ps

1223383047 2008-10-07 Salt Water Injection Well No Violations - Follow up inspection to NOV

1. Operator has posted ID at well and on water tank. 2. Dike liner has been repaired, operator has pulled liner back on top of dike and relined outside berm. 3. Water meter repaired 4. Unloading pad vault pumped down and inlet pipe seal repaired, area around vault cleaned. Annulus pressure 560 injection 0 on vacuum water meter reading 105761 gallons = 2518 barrels.

1233251426 2012-09-09 Salt Water Injection Well No Violations - Joint inspection with Jon Scott of MRM. ID on well and tank. Dike area has some water in it. Unloading pad free of debris, pad vault about 1/3 full of water.

- Annulus pressure 520 injection pressure 0 vacuum water meter reading 385896 gallons = 9,188 barrels.

1238508109 2009-03-31 Salt Water Injection Well Violations Noted - Inspection of well. ID at well and tank.

- Well annulus valve has not been replaced, annulus has lost pressure, Injection valve unable to open and install gauge. - Water meter on water tank not operable. - Water in dike area, unloading pad holding water and vault about halve full. - Contacted owner pumper at last inspection about valve needing to be replace. Will contact owner and issue Chief Order to suspend operation.

1239045325 2009-04-01 Salt Water Injection Well No Violations - On site for test and repairs to well head. Timco Service Company and Bob Atha on site for repairs.

- Replace 2 inch ball valve on annulus and Small 1/4 inch valve on injection line. Pressure annulus to 480 psi and test well for 15 minutes. Well passed cancel NOV and called Tom Tomastik of repairs and test to well.

1239524538 2008-04-08 Salt Water Injection Well No Violations - ID on tank and well

- Annulus pressure 0 injection pressure 0 on vacuum. - 2 inch ball valve on annulus broken appears to have frozen. - Contacted Bob Atha on this and he will replace valve and contact me when they pressure annulus back up. - Water meter 303467 gallons = 7,225 barrels

1247131704 2005-11-17 Salt Water Injection Well No Violations Injection on vacuum, annulus has 0 pressure. Dike 1/3 full of water.

- Phone call to Bob Master and left message, and met with Bob Atha and ask to have well pressure by next week and to pump out dike area.

1248i228 2002-2-19 0:00: PW No Violations
1256645706 2009-10-27 Salt Water Injection Well No Violations - ID on well, No ID on tank. Injection pump not operating while on site. Annulus pressure 420 injection 0 on vacuum. Water meter 288830 gallons = 6,876 Barrels.

Tank dike has water standing, needs to be pump. - Unloading pad clean of debris, unloading pad vault full of water needs to be pump out.

1283878770 2010-08-10 Salt Water Injection Well No Violations - New metal ID sign at well location, emergency phone number (614) 436-4813.

- Injection on vacuum, annulus pressure 520 Water meter 224987 gallons = 5,356 barrels. - Unloading pad clean of debris and vault about 1/2 full of water. Water tank about 3/4 full. New sign needed at tank area.

1288978831 2018-08-28 Salt Water Injection Well No Violations Compliance Notice # 955738905 follow up inspection. Inspected the unloading pad, containment dike, tanks, injection pressure and annulus pressure. Identification is posted at the facility and the well site. The containment dike fluid level is down to the lowest inlet port on the sump pump (2 deep).
1291658865 2010-12-06 Salt Water Injection Well Violations Noted - No ID at well, 1501:9-3-06 (H)

- Annulus pressure 480 injection pressure 260 - Water meter reading 491523 gallons = 11,702 barrels - Dike area has water contained in it, 1501:9-9-05 (A) (9) - plastic liner has slid down on the east end of the dike. 1501:9-3-05 (A) (6) - Unloading pad free of debris and vault about 1/2 full of water - Weather Cloudy Temp 19 frozen ground

1295884888 2011-01-20 Salt Water Injection Well No Violations - Inspection of well, no ID at well, ID at tank and unloading pad.

- Injection pressure 0 Vacuum, Annulus pressure 460 - Liner has been fix at tank dike, most of the water has been removed from the dike area. - Weather Temp. 20s frozen ground and snow covered. - Contacted Mr. Bob Master that the UIC well need to have ID at the well and tank.

1301156927 2010-06-15 Salt Water Injection Well No Violations - On site for meeting with landowner Mr. David Strawer, landowner where well is located Mr. Jeff McCray, well owner Mr. Bob Master well caretaker Mr. Bob Atha, ODNR MRM Supervisor Jeff Fry and Mr. Doug Kohli of Pickaway County Soil and Water Conservation District. Mr. McCray has complainted in past years that when Cortland Energy installed the injection line from the tank to the well that several field drainage tiles were cut and not reconnected which has caused several other field tiles to blowout. A site review was conducted and several sink hole and blowout were noted and GPS. The Grass waterway contains the main drainage tile to a small tributary. The repairs may be eligible for a Grant under the Soil and Water Conservation, the cost will be agreed between Cortland Energy and the landowner.
1316622893 2011-09-21 Salt Water Injection Well No Violations - ID at well and tank, water in dike area.

- Injection pressure 0 Vac. Annulus pressure 500 water meter 938232 gallons = 22,338 barrels. Unloading pad free of water, over flow vault full of water. - Weather condition overcast light rain Temp 70s

1328625815 2012-02-07 Salt Water Injection Well No Violations - Annulus pressure 440 psi, injection pressure 0 on vacuum. ID at well and tank. Dike area free of water. Unloading pad free of water, unloading pad vault full of water, phone call to owner to have vault pump out.

- Water meter not operable during inspection. - Weather conditions: overcast Temp 30s frozen ground.

1364401320 2013-03-27 Salt Water Injection Well No Violations - ID at well and tank. Annulus pressure 480 Injection pressure 0 vacuum.

- Water meter reading 43655 gallons = 1,039 barrels. - Unloading pad free of water and debris, unloading pad overflow vault less than half full. - Weather condition partly sunny Temp low 40s

1365304941 2010-03-17 Salt Water Injection Well No Violations - ID at well and tank. Annulus pressure 420 Injection pressure 0 on Vacuum Water Meter reading 547326 gal. = 13,031 Barrels.

- Unloading pad free of water and debris, vault about I/2 full of water. - Weather Sunny Temp 40s in AM, ground condition wet.

1393520269 2014-02-27 Salt Water Injection Well No Violations - ID on well and tank.

- Annulus pressure 440 Injection pressure 0 on vacuum - Water meter reading 62724 gallons - Tank entry location 39.78435 -82.89987 - Unloading pad free of water and debris - Weather condition partly cloudy temp 22 ground condition frozen

1411481606 2014-09-23 Salt Water Injection Well No Violations - Inspection, ID on well and tank

- Annulus pressure 500 PSI Injection pressure 0 on vacuum - Dike area free of debris - Unloading pad clean, vault is about 1/2 full of water. -

1417465005 2014-12-01 Salt Water Injection Well No Violations - On site for inspection, inquiry of injection lines for the injection well. A pipeline from the unloading pad was installed in the injection line to well bypassing the flow meter. The well owner was contacted and pipeline was removed, H&H company name on truck Brine number 520. Contacted Jennifer Gingras on this company and they are not register to haul water in Pickaway County.

- Met with Landowner

1417633912 2014-12-03 Salt Water Injection Well No Violations Inspected the unloading pad, containment dike, tank, injection line, annulus pressure and injection pressure. Identification is posted at the surface facility and the injection well. Reviewed operational permit conditions with Bob Masters. Witnessed general injection operations. Two pickup loads of gravel were hauled and spread on the facility access road. There were no brine trucks at the facility during my inspection.
1421265190 2015-01-14 Salt Water Injection Well No Violations Inspected the unloading pad, containment dike, tank, flow meter, injection pressure and annulus pressure. Identification posted at the surface facility and the well. Containment dike had approximately 6 of ice and water in it. Current temperature 21 degrees F.
1422385932 2015-01-27 Salt Water Injection Well No Violations UIC inspection. The well has a small amount of fluid in the containment dike. The flow meter is not working. I contacted owner Bob Masters regarding these two issues. Bob told me they would be addressed and he would contact me for re-inspection.
1425417884 2015-03-03 Salt Water Injection Well No Violations Compliance Notice # 372773253 Follow up inspection. Contamination has been remediated.
1443043677 2015-09-23 Salt Water Injection Well No Violations Inspected the unloading pad, containment dike, tank, injection pressure and annulus pressure.
1458981222 2018-06-04 Salt Water Injection Well No Violations Compliance Notice # 955738905 follow up inspection. The containment dike has 12 inches of brine in it. I called Bob Masters and received a message that his voice mail box is full. I called at 11:06 am and 11:13 am on 6-4-2018. I also sent Bob Masters a text message that he needs to pump out the containment dike into the tank for disposal. I called Bob Atha (contractor for Cortland Energy) at 11:09 am. Bob Atha stated that he will contact the well tender and let them know that the dike needs pumped out.
1461843840 2016-04-27 Salt Water Injection Well No Violations Inspected the unloading pad, containment dike, tank, injection pressure and annulus pressure.
1482888133 2013-10-23 Salt Water Injection Well No Violations - ID on well, tank battery area and at the unloading pad. Dike area has some water in it due to recent rain fall.

- Injection pressure 0 vacuum, annulus pressure 460 water meter reading 479301 gallons = 11,411 barrels. Unloading vault about 1/2 of water.

1490012173 2017-03-16 Salt Water Injection Well No Violations Inspected the containment dike, tank, unloading pad, injection pressure and annulus pressure. Identification is posted. The containment dike is free of fluids.
1533837672 2018-08-09 Salt Water Injection Well No Violations Compliance Notice # 955738905 follow up inspection. The containment dike has 8 inches of brine and oil residue in it. I called Bob Masters and left a voice message regarding the fluid in the dike needing to be pumped into the tank. Bob called me back and told me that he is heading to the location to pump down the dike water.
1543508840 2018-11-20 Salt Water Injection Well No Violations Inspected the unloading pad, containment dike, tank, injection pressure and annulus pressure. Identification is posted. The containment dike is free of fluids.
1550854756 2019-02-21 Salt Water Injection Well No Violations Inspected the unloading pad, containment dike, tank, injection pressure and annulus pressure. Identification posted at the facility and the well. The containment dike is free of fluid.
1556517660 2012-03-20 Salt Water Injection Well No Violations - On site for inspection of well and tank/dike facility, ID at well and tank. Annulus pressure 500 Injection 0 Vacuum Water Meter 3815 gallons = 90.8 barrels. Vault is about 1/4 full of water.

- The liner on the dike needs to be repaired, photo taken. Will send to operator inspection report and photo.

1595224255 2007-04-11 Salt Water Injection Well No Violations - ID on well and tank. Well injection 0 (vacuum) annulus 240 PSI Water meter reading 552140 gallons = 13,146 barrels Dike has small amount of water.
1709295524 2013-01-17 Salt Water Injection Well No Violations - ID on well and tank, dike area has water in it. Unloading pad free of water and debris, unloading vault has been pumped out.

- Annulus pressure 500 Injection pressure 0 on vacuum water meter reading 560763 gallons = 13,351 barrels - Weather condition cloudy temp 30

1742062946 2004-10-12 Production Wells No Violations - On site for inspection, release NOV signs posted at well and tank area. Well area and tank area clean . Well is capable to produce.

- Weather Mid 50 in the AM Sunny.

1755565710 2009-06-10 Salt Water Injection Well No Violations - Injection pressure 0 / on vacuum, injection pump operating. Annulus pressure 500 psi. ID posted at well no sign on tank contacted operator and request new sign to be posted at tank. Unloading pad free of water, Vault has a small amount of fluid in it. Water meter reading 19304 gal. = 459barrels
1762344688 2012-08-08 Salt Water Injection Well No Violations - ID on well and tank, Dike area free of water. Unloading pad free of water and debris. Unloading pad vault has some water in it.

- Annulus pressure 580 injection pressure 0 vacuum. Water meter reading 331029 gallons = 7,881 barrels. Flow rate 13.03 gallons.

182374055 2005-8-31 0:00: SW No Violations
1872038708 2015-11-04 Salt Water Injection Well No Violations Inspected the unloading pad, unloading pad vault, containment dike, tank, injection pressure, and annulus pressure. The unloading pad vault is full of water and the containment dike has 6 of water in it. I called Bob Masters and told him to pump out the vault and containment dike. The water is to be pumped into the tank for injection.
1873390939 2009-01-06 Salt Water Injection Well No Violations - Ball valve broken on annulus side of well, valve has frozen in the past weeks. Small valve on injection unable to open.

- iD at well and tank. - Unloading pad clean of debris.

1878737924 2020-3-5 0:00:0 SW No Violations
1926227917 2018-02-16 Salt Water Injection Well Violations Noted Our records indicate that the Division has not received the Salt Water Injection Well disposal fees for the 3rd & 4th quarter of 2017 . Please submit the appropriate reports by March 17, 2018. FEES AND REPORTS RECEIVED 3/13/2018.
1978940821 2012-09-06 Salt Water Injection Well No Violations Accompanied Mike Mitchell MRI 3 on inspection of the injection well facilities and checking injection and annulus pressures.
2073611269 2016-01-21 Salt Water Injection Well No Violations Inspected the unloading pad, containment dike, tank, injection pressure and annulus pressure. Containment dike has 3 of ice in the bottom. Identification posted by the unloading pad and at the well.
2093719040 2007-06-07 Salt Water Injection Well No Violations - On site for placement of vault. Operator has dug hole on 6/6, JK Precast set tank into hole, but hole to deep. Tank was set on ground and operator will need to backfill hole.

- Arrive back on site in the afternoon for reset of tank. operator has backfilled hole with crushed limestone, place tank into hole. Seam of tank now above graded. Pipe connected from unloading pad to tank, check pipe for down grade, backfill around pipe. - Photos taken.

326351540 2007-6-6 0:00:0 SW No Violations
354708329 2005-2-16 0:00: PW No Violations
400220764 2019-10-24 0:00 SW No Violations 1.20
436765281 2008-4-22 0:00: SW No Violations
456153229 2007-1-10 0:00: SW No Violations
604886547 2020-3-19 0:00: SW No Violations 3.60
667247170 2007-5-31 0:00: AM No Violations
669062454 2016-11-22 0:00 SW No Violations 2.00
721200941 2016-7-27 0:00: SW No Violations 2.50
757395589 2004-10-12 0:00 PL No Violations
802100102 2017-6-1 0:00:0 SW No Violations 1.50
955738905 2018-5-30 0:00: SW No Violations 3.00
966577825 2005-8-16 0:00: SW No Violations
CENA998 1999-7-30 0:00: PW No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
001248i228 US-OH-106643 2002-02-19 Failure to legibly identify well
0372773253 US-OH-123933 2015-03-26 Pollution/Contamination
0456153229 US-OH-124937 2007-01-10 Permit not displayed
0693848580 US-OH-127852 2019-05-09 Failure to file salt water injection annual report
0802100102 US-OH-129115 2017-06-19 9-3-04(A) Pollution/Contamination
0955738905 US-OH-130918 2018-08-13 NONE8 A dike or pit so used shall be constructed and maintained to prevent escape of brine and crude oil, and the reservoir within such a dike or pit shall be kept reasonably free of brine, crude oil, and other waste substances.
1031542367 US-OH-100508 2017-04-20 NONE.. Failure to properly identify brine hauling truck
1078930886 US-OH-101708 2004-03-10 Failure to legibly identify well
1190295307 US-OH-105038 2007-09-20 Failure to pass required test
1221502404 US-OH-105969 2008-09-15 Permit not displayed
1221502404 US-OH-105970 2008-09-23 Failure to monitor pressures/volumes
1221502404 US-OH-105971 2008-09-15 Pits not liquid tight/Improper construction or use
1238508109 US-OH-106354 2009-03-31 Violation of injection tubing/fitting requirements
1238508109 US-OH-106355 2009-03-31 Failure to pass required test
1291658865 US-OH-108226 2010-12-06 Dike or pit not able to prevent escape of brine or other wastes
1291658865 US-OH-108227 2010-12-06 Failure to keep dike or pit free of brine or other wastes
1291658865 US-OH-108228 2010-12-06 Permit not displayed
1926227917 US-OH-119370 2018-03-21 NONE Failure to report disposal fees

For data sources see[8]

References