Well Details

Well ID: 34-121-24339
Loading map...
Country: United States
State: Ohio
County: Noble
Municipality: Olive Township
Operator Name: NORTHWOOD ENERGY CORP
Well Pad ID:
Farm/Lease Name: WEDDLE
License Status: Producing
License Date: 2010-05-28
Spud Date: 2010-07-22
Spud Drilling Contractor: FMS DRILLING
Final Drill Date: 2010-07-28
Well Total Depth: 3995.00 ft
Configuration: Vertical
Latitude: 39.730000
Longitude: -81.550000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2010-05-28 Proposed Formations:DEVONIAN SHALE, Issued Date:5/28/2010, Expired Date:5/28/2011 6:00:00 AM, Drilling unit acres:25.12, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2010-07-28
Completion Report Received 2010-12-02
Construction Permit Expires 2011-05-28
Record Last Modified 2017-12-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2011-03-21 2970 3886 94
2970 3886 94
2970 3886 94

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2010-09-08 H2O 15 305744 Gal 50000 Producers Service Corporation

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2010 NORTHWOOD ENERGY CORP 1235.00 0.00 365
2011 NORTHWOOD ENERGY CORP 2412.00 66.00 0
2012 NORTHWOOD ENERGY CORP 1733.00 43.00 366
2013 NORTHWOOD ENERGY CORP 914.00 0.00 365
2014 NORTHWOOD ENERGY CORP 430.00 0.00 365
2015 NORTHWOOD ENERGY CORP 358.00 0.00 365
2016 NORTHWOOD ENERGY CORP 498.00 0.00 365
2017 NORTHWOOD ENERGY CORP 367.00 0.00 365
2018 NORTHWOOD ENERGY CORP 278.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2010 NORTHWOOD ENERGY CORP Brine 865 365
2011 NORTHWOOD ENERGY CORP Brine 576
2012 NORTHWOOD ENERGY CORP Brine 141 366
2013 NORTHWOOD ENERGY CORP Brine 96 365
2014 NORTHWOOD ENERGY CORP Brine 136 365
2015 NORTHWOOD ENERGY CORP Brine 76 365
2016 NORTHWOOD ENERGY CORP Brine 38 365
2017 NORTHWOOD ENERGY CORP Brine 88 365
2018 NORTHWOOD ENERGY CORP Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-266868317 2012-1-25 0:00: PL No Violations
-459479362 2018-3-7 0:00:0 PW No Violations 0.50
0266868317 2012-01-25 Preliminary Restoration No Violations Upon inspection of the well site area found pits filled and vegetation established, at wellhead 2 tubing-4.5 casing -production valves open and well being produced by means of a pumping unit -well production area fenced in. At the production fluid tank battery the following equipment is present in a established dike area-1-one 210 barrel production fluid tank -with proper well identification -separator and gas meter.
0459479362 2018-03-07 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with 8.625 inch diameter surface casing with a casing head, 4.5 inch diameter production casing with a tubing head, 2.375 inch diameter tubing, rods, and a pumping unit with an electric motor. Production valves were in the open position. The production equipment consisted of one 210 barrel tank, one drip, one horizontal separator, and one sales meter. The sales meter had a 2 inch diameter sales line, .25 inch orifice plate, and chart recorder with current chart. A domestic gas line with a little Joe regulator, a meter, and an open valve was attached to the drip. All equipment was within an earthen dike. The identification was located on the 210 barrel tank and the production records were current.
1283982406 2010-09-08 Completion Testing No Violations On site to witness frac job,Producers Services pumped 27-300 bbl tanks of water in hole and also used 50,000# of sand and 1000 gal of 15%acid job went well and once completed flow back process was begun, well owner has hired outside contractor to flow well back into tanks and they will move water to next completion job.
1327502477 2012-01-25 Preliminary Restoration No Violations Upon inspection of the well site area found pits filled and vegetation established, at wellhead 2 tubing-4.5 casing -production valves open and well being produced by means of a pumping unit -well production area fenced in . At the production fluid tank battery the following equipment is present in a established dike area-1-one 210 barrel production fluid tank -with proper well identification -separator and gas meter .
1346263427 2012-08-29 Production Wells No Violations My inspection today finds the well is equipped with 4.5 casing, 2.375 tubing, rods, and a pump jack. The pump jack is running. The tank battery consists of one 210 bbl tank, a meter, and a separator. The dike is adequate and the identification is proper.

For data sources see[9]