If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-23929 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.84,"lon":-81.38,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Seneca Township | |
Operator Name: NORTHWOOD ENERGY CORP | |
Well Pad ID: | |
Farm/Lease Name: CONSOLIDATION COAL CO | |
License Status: Final Restoration | |
License Date: 2012-08-09 | |
Spud Date: 2001-07-12 | |
Spud Drilling Contractor: R WOLFE DRLG | |
Final Drill Date: 2001-07-18 | |
Well Total Depth: 1000.00 ft | |
Configuration: Vertical | |
Latitude: 39.840000 | |
Longitude: -81.380000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2000-09-26 | 4652 GEORGETOWN OIL Proposed Formation BEREA Issued Date 9/26/00 Expired Date 9/26/01 6:00:00 AM |
Original Spud | 2001-07-12 | RBDMS Rec |
Completed | 2001-07-18 | RBDMS Rec |
Reached Total Depth | 2001-07-18 | RBDMS Rec |
Completion Report Received | 2002-10-24 | RBDMS Rec |
APP | 2004-09-14 | Proposed Formations:MAXTON, Issued Date:9/14/2004, Expired Date:9/14/2005 6:00:00 AM, Drilling unit acres:10, Proposed Well Type:OG, Proposed Well Class: |
Change of Owner | 2005-04-14 | Operator changed from 4652, GEORGETOWN OIL to 1634, NORTHWOOD ENERGY CORP |
APP | 2005-09-21 | Proposed Formations:MAXTON THRU OHIO SHALE, Issued Date:9/21/2005, Expired Date:9/21/2006 6:00:00 AM, Drilling unit acres:150, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2010-02-02 | Proposed Formations:MAXTON SANDSTONE THRU OHIO SHALE, Issued Date:2/2/2010, Expired Date:2/2/2011 6:00:00 AM, Drilling unit acres:150, Proposed Well Type:OG, Proposed Well Class:EW |
APP | 2012-08-09 | Proposed Formations:BEREA - DEVONIAN SHALE, Issued Date:8/9/2012, Expired Date:8/9/2014 12:00:00 PM, Drilling unit acres:150, Proposed Well Type:OG, Proposed Well Class:ENPW |
Plugged/Abandoned | 2013-04-16 | RBDMS Rec |
Construction Permit Expires | 2014-08-09 | RBDMS Rec |
Record Last Modified | 2015-09-24 | RBDMS Rec |
For data sources see[2]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2005 | NORTHWOOD ENERGY CORP | 1136.00 | 0.00 | 365 |
2006 | NORTHWOOD ENERGY CORP | 1232.00 | 0.00 | 365 |
2007 | NORTHWOOD ENERGY CORP | 1442.00 | 0.00 | 365 |
2008 | NORTHWOOD ENERGY CORP | 1288.00 | 0.00 | 365 |
2009 | NORTHWOOD ENERGY CORP | 1040.00 | 0.00 | 365 |
2010 | NORTHWOOD ENERGY CORP | 832.00 | 0.00 | 365 |
2011 | NORTHWOOD ENERGY CORP | 900.00 | 0.00 | 0 |
2012 | NORTHWOOD ENERGY CORP | 1363.00 | 0.00 | 366 |
2013 | NORTHWOOD ENERGY CORP | 1220.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2005 | NORTHWOOD ENERGY CORP | Brine | 0 | 365 |
2006 | NORTHWOOD ENERGY CORP | Brine | 0 | 365 |
2007 | NORTHWOOD ENERGY CORP | Brine | 0 | 365 |
2008 | NORTHWOOD ENERGY CORP | Brine | 39 | 365 |
2009 | NORTHWOOD ENERGY CORP | Brine | 0 | 365 |
2010 | NORTHWOOD ENERGY CORP | Brine | 0 | 365 |
2011 | NORTHWOOD ENERGY CORP | Brine | 0 | |
2012 | NORTHWOOD ENERGY CORP | Brine | 0 | 366 |
2013 | NORTHWOOD ENERGY CORP | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1200052340 | 2013-4-16 0:00: | DD | No Violations | 3.00 |
-336394330 | PW | No Violations | ||
-350009586 | 2013-3-22 0:00: | DD | No Violations | 3.00 |
0004876993 | 2002-08-12 | Production Wells | No Violations | Non Compliance,Restoration not done, no I.D. posted. Drilling pit has been closed. |
0159507570 | 2005-01-04 | Preliminary Restoration | No Violations | Restoration work at site satisfactory.
Well is being transferred to Northwood Energy. |
0336394330 | Production Wells | No Violations | Well deepening permit expired 2/2/2011. | |
0350009586 | 2013-03-22 | Drill / Deepen / Reopen | No Violations | My inspection today finds the rig crew has reconected the 5.5 casing after it parted at 61 from surface. The rig crew will return to drilling next week. |
0776934370 | 2015-05-15 | Final Restoration | No Violations | My inspection today finds the well site has been reclaimed in accordance with 1509.072(B). |
1052999424 | 2003-05-14 | Production Wells | No Violations | Non-compliance to NOV,no I.D.posted Restoration not complete. |
1061415222 | 2003-08-20 | Production Wells | No Violations | went to location to take fresh photos for Bob Eubanks Divisons AG attorney for up coming hearing. |
1120999786 | 2015-05-01 | Final Restoration | No Violations | I spoke to Bill Arnholt, President of Northwood Energy, about reclaiming the location. I told Mr. Arnholt that Consol Energy has removed their water transport line that ran across the location preventing the reclamation from being completed. He stated that contractors would dispatched within two weeks. |
1200052340 | 2013-04-16 | Drill / Deepen / Reopen | No Violations | My inspection today finds the rig crew has ran 302 of pipe. Formation circulated cement to surface. Cement stayed at surface. |
1366118295 | 2013-04-15 | Plug / Plug Back | No Violations | My inspection today finds the the drilling contractor (Kilbarger) has been stuck in the hole for a month. Appalachin is on site to assist in the pipe back off. The pipe bakked off at 1118. The rig crew circulated on the hole as they pulled one joint of pipe. Formation set a 300 30 sk plug at 1088. The prforators found free pipe at 350 and shot a casing cutter. The rig crew retrieved 350 of 5.5 casing. |
159507570 | 2005-1-4 0:00:0 | PL | No Violations | |
1870500494 | 2006-11-05 | Production Wells | No Violations | Deepening permit expired 9/21/06 in conversation with company rep stating they were planning on deepening well next year told them to apply for new permit when rig is located too do so. |
2139906743 | 2003-09-09 | Production Wells | No Violations | follow-up inspection to ChiefsOrder2003-62 well site has been reclaimed and I.D. posted
Recommend operator be removed from hold list. |
4876993 | 2002-8-12 0:00: | PW | No Violations | |
776934370 | 2015-5-15 0:00: | FR | No Violations | 2.00 |
For data sources see[7]