X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-121-21784

Well Details

Well ID: 34-121-21784
Loading map...
Country: United States
State: Ohio
County: Noble
Municipality: Noble Township
Operator Name: NORTHWOOD ENERGY CORP
Well Pad ID:
Farm/Lease Name: HURST
License Status: Producing
License Date: 2011-12-05
Spud Date: 2012-06-20
Spud Drilling Contractor: KILBARGER DRLG
Final Drill Date: 2012-06-28
Well Total Depth: 2500.00 ft
Configuration: Vertical
Latitude: 39.780000
Longitude: -81.560000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Original Spud 1975-09-27 OTD: 5616' IN CLINTON
Completed 1975-10-09 OTD: 5616' IN CLINTON
Plugged/Abandoned 1975-10-11 OTD: 5616' IN CLINTON
CO 1982-10-13 404 GUERNSEY PETROLEUM CORP GeoDate 10/13/82
Unknown 1982-10-13 Issued Date 9/22/75 Expired Date 9/21/76 Acres 0000000 Tool Type Proposed Formation Proposed Depth 00000 Proposed Drill Depth 00000
APP 2011-12-05 Proposed Formations:BEREA THRU ORISKANY, Issued Date:12/5/2011, Expired Date:12/4/2013 12:00:00 PM, Drilling unit acres:41.6, Proposed Well Type:OG, Proposed Well Class:ENPW
Reached Total Depth 2012-06-28 OTD: 5616' IN CLINTON
Completion Report Received 2012-09-07 OTD: 5616' IN CLINTON
Construction Permit Expires 2013-12-04 OTD: 5616' IN CLINTON
Record Last Modified 2018-01-31 OTD: 5616' IN CLINTON

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2012-09-11 1569 2099 152
1569 2099 152
1569 2099 152

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2012-07-25 H2O 8 336569 Gal 80000 Producers Service Corporation

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2012 NORTHWOOD ENERGY CORP 183.00 0.00 121
2013 NORTHWOOD ENERGY CORP 311.00 0.00 365
2014 NORTHWOOD ENERGY CORP 150.00 0.00 365
2015 NORTHWOOD ENERGY CORP 80.00 0.00 365
2016 NORTHWOOD ENERGY CORP 51.00 0.00 365
2017 NORTHWOOD ENERGY CORP 0.00 0.00 0
2018 NORTHWOOD ENERGY CORP 0.00 0.00 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2012 NORTHWOOD ENERGY CORP Brine 0 121
2013 NORTHWOOD ENERGY CORP Brine 0 365
2014 NORTHWOOD ENERGY CORP Brine 36 365
2015 NORTHWOOD ENERGY CORP Brine 0 365
2016 NORTHWOOD ENERGY CORP Brine 0 365
2017 NORTHWOOD ENERGY CORP Brine 0 0
2018 NORTHWOOD ENERGY CORP Brine 0 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1585068124 2017-5-2 0:00:0 PW No Violations 1.50
0151702559 2017-09-06 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with 8.625 inch diameter surface casing with a casing head, 4.5 inch diameter production casing with a tubing head, 1.5 inch diameter tubing, rods, and a pumping unit powered with an electric motor. Production valves were in the open position. The production equipment consisted of one 100 barrel tank, one drip, one horizontal separator, and one chart meter. All equipment was within an earthen dike. The identification was located on the 100 barrel tank and the production records are current.
0298401983 2016-06-27 Production Wells No Violations My inspection today finds the well is equipped with a pumping unit. The production valves are open. The tank battery consists of one 100 barrel tank, a separator and a meter with a current chart. The identification sticker has fallen off of the tank and is laying on the ground. I will contact the company and notify them of the identification issue.
1340135845 2012-06-19 Drill / Deepen / Reopen No Violations Inspector stopped by kilbarger service rig on re open project for a status report and the following progress has been made , drilling inside 8.625 surface with a 7.875 bit at the depth of 500 on fluid as of 300PM on this day . Also project started on this day.
1340204151 2012-06-20 Drill / Deepen / Reopen No Violations Inspector stopped by re open site to check on progress, Kilbarger rig on hole with a current depth of 790and still on cement ,bottom of 8.625 surface is @ 660 , Fluid pits looked good with good fluid circulation .
1340402977 2012-06-19 Drill / Deepen / Reopen No Violations Kilbarger on site to reopen well they were cleaning out old well bore@500.
1340807144 2012-06-27 Drill / Deepen / Reopen No Violations Stopped by drilling rig for status check , well TD@ 2515 and pulling out of hole with drill string .
151702559 2017-9-6 0:00:0 PW No Violations 1.00
1585068124 2017-05-02 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with 8.625 inch diameter surface casing with a casing head, 4.5 inch diameter production casing with a tubing head, 1.5 inch diameter tubing, rods, and a pumping unit. All valves were in the open position. The production equipment consisted of one 100 barrel tank, one drip, one horizontal separator, and one chart meter. All equipment was within an earthen dike. The identification was located on the 100 barrel tank, the production records are current, and there were no violations present.
1594142647 2020-7-7 0:00:0 PL No Violations 0.50
298401983 2016-6-27 0:00: PW No Violations 1.00
iDIAN00242 1982-10-13 Final Restoration No Violations
iDIAN002420 1982-10-13 0:00 FR No Violations

For data sources see[9]

References