If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-21278 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.61,"lon":-81.34,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Elk Township | |
Operator Name: B & N COAL INC | |
Well Pad ID: | |
Farm/Lease Name: ULLMAN ROBERT | |
License Status: Producing | |
License Date: 1966-06-06 | |
Spud Date: 1966-08-04 | |
Spud Drilling Contractor: DELTA DRILLING | |
Final Drill Date: 1966-12-13 | |
Well Total Depth: 11442.00 ft | |
Configuration: Vertical | |
Latitude: 39.610000 | |
Longitude: -81.340000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1801-01-02 | 1018 BAKER OIL CO |
Original Spud | 1966-08-04 | LOG TYPE=IES, BCS |
Reached Total Depth | 1966-12-13 | LOG TYPE=IES, BCS |
Plugged Back | 1966-12-15 | LOG TYPE=IES, BCS |
Completed | 1967-02-01 | LOG TYPE=IES, BCS |
Completion Report Received | 1967-03-13 | LOG TYPE=IES, BCS |
CO | 1991-12-06 | 1744 B & N COAL INC GeoDate |
Plugging Plan Approved | 1998-02-21 | LOG TYPE=IES, BCS |
Record Last Modified | 2017-02-15 | LOG TYPE=IES, BCS |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2003-10-01 | 2300 | 2450 | 50 |
2003-10-01 | 2796 | 2946 | 50 |
2796 | 2946 | 50 | |
2300 | 2450 | 50 | |
2300 | 2450 | 50 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 2332 Bbl | 97000 | |||
H2O | 0 | 2759 Bbl | 97000 | 2 STAGE FRAC IN DEVONIAN SHALE…1ST STAGE:934 BBL H20 & 32M# SAND...BRIDGE PLUG SET @ 2503'...2ND STAGE:1825 BBL H20 & 65M# SAND…REMOVED BP |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | BAKER OIL CO | 5451.00 | 85.00 | 0 |
1985 | BAKER OIL CO | 2058.00 | 169.00 | 0 |
1986 | BAKER OIL CO | 1074.00 | 239.00 | 300 |
1987 | BAKER OIL CO | 2985.00 | 74.00 | 365 |
1988 | BAKER OIL CO | 2757.00 | 71.00 | 360 |
1989 | BAKER OIL CO | 1860.00 | 141.00 | 270 |
1990 | BAKER OIL CO | 1609.00 | 81.00 | 365 |
1991 | B & N COAL INC | 415.00 | 86.00 | 240 |
1992 | B & N COAL INC | 258.00 | 0.00 | 210 |
1993 | B & N COAL INC | 151.00 | 0.00 | 300 |
1994 | B & N COAL INC | 330.00 | 0.00 | 300 |
1995 | B & N COAL INC | 77.00 | 0.00 | 300 |
1996 | B & N COAL INC | 387.00 | 0.00 | 330 |
1997 | B & N COAL INC | 446.00 | 22.00 | 300 |
1998 | B & N COAL INC | 1512.00 | 97.00 | 270 |
1999 | B & N COAL INC | 1562.00 | 35.00 | 300 |
2000 | B & N COAL INC | 1189.00 | 0.00 | 270 |
2001 | B & N COAL INC | 1162.00 | 0.00 | 270 |
2002 | B & N COAL INC | 1115.00 | 0.00 | 270 |
2003 | B & N COAL INC | 722.00 | 72.00 | 270 |
2004 | B & N COAL INC | 807.00 | 0.00 | 300 |
2005 | B & N COAL INC | 1009.00 | 0.00 | 300 |
2006 | B & N COAL INC | 277.00 | 0.00 | 300 |
2007 | B & N COAL INC | 831.00 | 67.00 | 300 |
2008 | B & N COAL INC | 571.00 | 0.00 | 300 |
2009 | B & N COAL INC | 673.00 | 0.00 | 300 |
2010 | B & N COAL INC | 812.00 | 71.00 | 300 |
2011 | B & N COAL INC | 733.00 | 0.00 | 300 |
2012 | B & N COAL INC | 825.00 | 0.00 | 300 |
2013 | B & N COAL INC | 428.00 | 0.00 | 300 |
2014 | B & N COAL INC | 56.00 | 73.00 | 300 |
2015 | B & N COAL INC | 359.00 | 0.00 | 300 |
2016 | B & N COAL INC | 697.00 | 0.00 | 300 |
2017 | B & N COAL INC | 872.00 | 0.00 | 300 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | BAKER OIL CO | Brine | 0 | 0 |
1985 | BAKER OIL CO | Brine | 0 | 0 |
1986 | BAKER OIL CO | Brine | 0 | 300 |
1987 | BAKER OIL CO | Brine | 0 | 365 |
1988 | BAKER OIL CO | Brine | 0 | 360 |
1989 | BAKER OIL CO | Brine | 0 | 270 |
1990 | BAKER OIL CO | Brine | 0 | 365 |
1991 | B & N COAL INC | Brine | 0 | 240 |
1992 | B & N COAL INC | Brine | 0 | 210 |
1993 | B & N COAL INC | Brine | 0 | 300 |
1994 | B & N COAL INC | Brine | 0 | 300 |
1995 | B & N COAL INC | Brine | 0 | 300 |
1996 | B & N COAL INC | Brine | 0 | 330 |
1997 | B & N COAL INC | Brine | 0 | 300 |
1998 | B & N COAL INC | Brine | 0 | 270 |
1999 | B & N COAL INC | Brine | 0 | 300 |
2000 | B & N COAL INC | Brine | 0 | 270 |
2001 | B & N COAL INC | Brine | 0 | 270 |
2002 | B & N COAL INC | Brine | 0 | 270 |
2003 | B & N COAL INC | Brine | 0 | 270 |
2004 | B & N COAL INC | Brine | 0 | 300 |
2005 | B & N COAL INC | Brine | 0 | 300 |
2006 | B & N COAL INC | Brine | 0 | 300 |
2007 | B & N COAL INC | Brine | 0 | 300 |
2008 | B & N COAL INC | Brine | 0 | 300 |
2009 | B & N COAL INC | Brine | 0 | 300 |
2010 | B & N COAL INC | Brine | 0 | 300 |
2011 | B & N COAL INC | Brine | 0 | 300 |
2012 | B & N COAL INC | Brine | 0 | 300 |
2013 | B & N COAL INC | Brine | 0 | 300 |
2014 | B & N COAL INC | Brine | 0 | 300 |
2015 | B & N COAL INC | Brine | 0 | 300 |
2016 | B & N COAL INC | Brine | 0 | 300 |
2017 | B & N COAL INC | Brine | 0 | 300 |