Well Details

Well ID: 34-119-28713
Loading map...
Country: United States
State: Ohio
County: Muskingum
Municipality: Salt Creek Township
Operator Name: ARTEX OIL COMPANY
Well Pad ID:
Farm/Lease Name: RITTENHOUSE-PERKINS UNIT
License Status: Producing
License Date: 2010-08-19
Spud Date: 2010-10-18
Spud Drilling Contractor: WARREN DRLG
Final Drill Date: 2010-10-28
Well Total Depth: 6720.00 ft
Configuration: Vertical
Latitude: 39.890000
Longitude: -81.810000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2010-08-19 Proposed Formations:OHIO SHALE THRU KNOX, Issued Date:8/19/2010, Expired Date:8/18/2012 12:00:00 PM, Drilling unit acres:79.13, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2010-10-28
Completion Report Received 2010-12-17
End of Confidential Data 2011-10-28
Construction Permit Expires 2012-08-18
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2011-03-30 6530 6624 78
6530 6624 78
6530 6624 78

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2010-11-02 ACID 15 14800 Gal 0 Producers Service Corporation

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2011 ARTEX OIL COMPANY 80106.00 263.00 365
2012 ARTEX OIL COMPANY 78934.00 154.00 366
2013 ARTEX OIL COMPANY 66998.00 141.00 365
2014 ARTEX OIL COMPANY 61387.00 124.00 365
2015 ARTEX OIL COMPANY 53661.00 86.00 365
2016 ARTEX OIL COMPANY 47852.00 96.00 365
2017 ARTEX OIL COMPANY 42618.00 125.00 365
2018 ARTEX OIL COMPANY 42273.00 87.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2011 ARTEX OIL COMPANY Brine 351 365
2012 ARTEX OIL COMPANY Brine 315 366
2013 ARTEX OIL COMPANY Brine 225 365
2014 ARTEX OIL COMPANY Brine 305 365
2015 ARTEX OIL COMPANY Brine 291 365
2016 ARTEX OIL COMPANY Brine 182 365
2017 ARTEX OIL COMPANY Brine 371 365
2018 ARTEX OIL COMPANY Brine 225 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1013499511 2013-11-21 0:00 PW No Violations 1.50
-1231653436 2010-11-2 0:00: DD No Violations
-2113934301 2017-1-4 0:00:0 PW No Violations 1.00
-232337784 2010-10-27 0:00 DD No Violations
-305724438 2017-1-4 0:00:0 PL No Violations 1.00
-482292875 2010-11-1 0:00: DD No Violations
0117649647 2014-10-07 Drill / Deepen / Reopen No Violations Blake Arthur and I stopped by at the site because Artex stated that site was completed. They set key seats and ran drains across them and covered them with river gravel. They moved the 120 barrel tank battery off of the hill. There is a pick-up back and line at the posible new entrance. The site was seeded and mulched back and I will stop back to check vegetation at later date.
0167203954 2013-04-08 Preliminary Restoration No Violations On day of inspection Kyle Baldwin and I met at site and the following was revealed. The slip measures about 180x200 and is still moving. The pit liner has been rolled and when this happen the water has been allowed to come thru the liner and washing the cuttings out. This caused the cuttings to wash over the hill with the slip. This is the 2nd time that the site has slid. The first time is evident by the soils flowing on the original contour in the bottoms. The trees are catching the force and the large amount of soils. Kyle will make a recommendation on the remedity of the situation. The Preliminary Restoration has not passed due to the slip. On 3-12-13 I met with the Artex and the company will put back as needed.
0168563579 2010-09-20 Drill / Deepen / Reopen No Violations Cutting location on steep bank.
0232337784 2010-10-27 Drill / Deepen / Reopen No Violations Lit 12 flare. Converted to fluid. Pit started leaking. Pumped it down until it quit. TD 6720Ran 151 joints of 4-1/2 casing 6692 set@ 6708. Schumberger cemented with 150 sx Rose Run Blend
0305724438 2017-01-04 Preliminary Restoration No Violations Preliminary Restoration passed per 1509.072 by Patrick Shreve on 1-4-17. Good vegetation is established and there are no erosion issues.
0482292875 2010-11-01 Drill / Deepen / Reopen No Violations Well was perforated with using cased carriers. 81 holes. Cement bond was good with cement top above 6000.
0645048290 2013-06-14 Production Wells No Violations Artex met with ODNR on the site for a plan of execution on the large slip at the site. ODNR agreed to move forward and start moving material.
0880249978 2011-03-08 Preliminary Restoration No Violations Whole location slipped down the hill due to heavy rains and snow melt. Tank sitting on edge of scarp. Tank has been emptied and will be moved behind the well. The well is shut in until the tank can be moved and replumbed. Reclamation will begin when area dries off.
0965188049 2013-03-12 Preliminary Restoration No Violations Met with Artex on well site. There is a large slip below where the pit was. The water has found the plastic and the soil has moved. The company has decided to let the slip area dry out and then go in and fix the site. They will remove old liner and install a drain at the area and get the water off of the site. At this time the site does not pass the Preliminary Restoration by Patrick Shreve on 3-12-13.
1013499511 2013-11-21 Production Wells No Violations The restoration work is being performed by Lang on the site to work on the major slip. They have been constructing a large bench so the slip will cease. They may shut equipment down until better weather comes in.
1089735149 2013-05-16 Preliminary Restoration No Violations I met Blake Arthur and Ron Trivasonno. They were inspecting site and we going to make recommendations on fixing the slip. I will call company when I receive that recommendation.
117649647 2014-10-7 0:00: DD No Violations 2.00
1231653436 2010-11-02 Drill / Deepen / Reopen No Violations Well was acidized with 13000 gallons of acid. Avg rate 4 BPM Avg pressure 3000 psi. Complete ball off achieved.
1287667249 2010-10-20 Drill / Deepen / Reopen No Violations Ran 34 joints of 8-5/8 casing. 1433 set @ 1449. Universal cemented with 225 sx of LS cement and 150 sx of Reg. Class A cement. Plug down 11:40 PM. See surface ticket for details.
167203954 2013-4-8 0:00:0 PL No Violations 3.00
168563579 2010-9-20 0:00: DD No Violations
1731860867 2010-11-19 Preliminary Restoration No Violations Pit closed. Reclaiming location.
2113934301 2017-01-04 Production Wells No Violations

--12-13.

645048290 2013-6-14 0:00: PW No Violations 2.00
880249978 2011-3-8 0:00:0 PL No Violations
965188049 2013-3-12 0:00: PL No Violations 2.00

For data sources see[9]