34-115-24667

Well Details

Well ID: 34-115-24667
Loading map...
Country: United States
State: Ohio
County: Morgan
Municipality: Center Township
Operator Name: UTICA RESOURCE OPERATING LLC
Well Pad ID: US-OH-000823
Farm/Lease Name: PALMER
License Status: Producing
License Date: 2013-12-12
Spud Date: 2012-05-03
Spud Drilling Contractor: OTHER
Final Drill Date: 2012-06-08
Well Total Depth: 7100.00 ft
Configuration: Directional
Latitude: 39.600000
Longitude: -81.660000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-04-09 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:4/9/2012, Expired Date:4/9/2014 12:00:00 PM, Drilling unit acres:73.27, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2012-06-08 WELL SI
Completion Report Received 2012-08-02 WELL SI
APP 2013-12-12 Proposed Formations:, Issued Date:12/12/2013, Expired Date:12/12/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:OG, Proposed Well Class:
Construction Permit Expires 2014-12-12 WELL SI
Change of Owner 2018-05-04 Operator changed from 8595, PDC ENERGY INC to 10114, UTICA RESOURCE OPERATING LLC
Record Last Modified 2018-05-04 WELL SI

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2012-08-07 6800 6812 0
2012-08-07 6832 6840 0
6800 6812 0
6832 6840 0
6800 6812 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 07/03/2012 07/03/2012 7200 341964

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Scale Clear SI II Universal Well Services, Inc. Scale Inhibitor NA NA 0 0 0
Sand 80/100 Mesh Universal Well Services, Inc. Proppant Crystalline Silica 14808-60-7 100 1.2165 52000
15% HCL Acid Universal Well Services, Inc. Solvent Hydrochloric Acid 7647-01-0 30 0.210109 0
EC6116A Universal Well Services, Inc. Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.006053 0
Polyethylene Glycol 25322-68-3 60 0.012107 0
Dibromoacetonitrile 3252-43-5 0.5 0.0001 0
Sand 30/50 Mesh Universal Well Services, Inc. Proppant Crystalline Silica 14808-60-7 100 7.94002 339400
Cla Chek G Universal Well Services, Inc. Clay Control Ethylene Glycol 107-21-1 60 0.055971 0
Unislik ST50 Universal Well Services, Inc. Emulsion Breaker Hydrotreated light distillates 64742-47-8 0 0 0
Flomax 50 Universal Well Services, Inc. Surfactant Citrus Terpenes 94266-47-4 15 0.019125 0
Isopropanol 67-63-0 15 0.019125 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2012-07-03 H2O 15 8142 Bbl 391400 Universal Well Services Inc.

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2012 PDC ENERGY INC 0.00 20.00 17
2014 PDC ENERGY INC 259.00 18.00 32
2015 PDC ENERGY INC 2154.00 114.00 119
2016 PDC ENERGY INC 31.00 5.00 21
2017 PDC ENERGY INC 695.00 37.00 48
2018 UTICA RESOURCE OPERATING LLC 654.00 75.00 54

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2012 PDC ENERGY INC Brine 4349 17
2014 PDC ENERGY INC Brine 53 32
2015 PDC ENERGY INC Brine 285 119
2016 PDC ENERGY INC Brine 1 21
2017 PDC ENERGY INC Brine 40 48
2018 UTICA RESOURCE OPERATING LLC Brine 44 54

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1038628540 2017-1-23 0:00: PW No Violations 2.00
-1242974023 2012-8-27 0:00: CT No Violations 1.00
-1568720626 2012-5-16 0:00: DD No Violations
-1638772768 2012-5-13 0:00: DD No Violations
-1802275045 2012-8-30 0:00: CT No Violations 1.50
-1844743817 2012-5-22 0:00: DD No Violations
-1914983700 2012-5-2 0:00:0 DD No Violations
-2102151978 2019-2-19 0:00: PW No Violations 0.30
-2132310721 2013-10-7 0:00: DD No Violations 0.50
-674998381 2012-6-11 0:00: DD No Violations
-760531403 2012-5-29 0:00: DD No Violations
-806858658 2012-8-3 0:00:0 CT No Violations 0.50
-82357785 2018-4-9 0:00:0 PL No Violations 0.50
-889112035 2018-4-4 0:00:0 PW No Violations 0.50
-916290914 2013-12-11 0:00 PW No Violations 2.00
0082357785 2018-04-09 Preliminary Restoration No Violations I was on location today to do a preliminary restoration on this well. The well has been reporting production since 2012. All of the drilling equipment has been removed and the drilling pits have been filled in. The well is in-compliance at this time.
0674998381 2012-06-11 Drill / Deepen / Reopen No Violations Checked drilling rig at the depth of 7100ft, will be running in 5 1/2 casing and cementing later today.
0760531403 2012-05-29 Drill / Deepen / Reopen No Violations Witnessed 9 5/8 casing being ran and set 5450ft, cement returned to approx. 1000ft from surface.
0806858658 2012-08-03 Completion Testing No Violations Kelly from PDC called to say they will leave this well shut in for 30 days, possibly up to 100 days, in hopes of building pressure.
0830104606 2013-01-08 Drill / Deepen / Reopen No Violations Upon inspection, I found all production equipment has been removed from location. The only thing on site is the wellhead equipped with christmas tree. Geologist from PDC stated they were waiting on Dominion pipeline.
0889112035 2018-04-04 Production Wells No Violations I am accompanied by Supervisor Dan Goins. We inspected the site for annular pressure monitoring equipment. The well was equipped with gauges for monitoring pressure on the 9.625 and 13.375 casing strings.
0916290914 2013-12-11 Production Wells No Violations PDC has made the location ready for the arrival of the H & P 385 Flex Rig. They will be drilling three horizontals off of this pad. They have pulled the tubing, set two retrievable plugs, loaded the hole full of water, and installed a nightcap on this well in preparation for the new well activity. This was a temporary inactive well status checklist and there are no issues to report at this time.
1038628540 2017-01-23 Production Wells No Violations The inspection this day revealed that this well is equipped with a plunger lift system, a 4 1/2 inch diameter wellhead, 2 inch diameter steel production lines, and 1 1/2 inch diameter production tubing. The valves on the wellhead are open at the time of inspection. The tank battery consist of six (6) 500 barrel steel tanks in a containment dike. Identification for the wells and tanks are posted and in proper order. The well tender for PDC was on site at the time of inspection. He informed me this well is having issues producing and the engineers for PDC are working on fixing the issues. There are no issues to report at this time and the well is in production at the time of inspection.
1242974023 2012-08-27 Completion Testing No Violations

-in. The flare has been removed. Kelly Wade from PDC called last well to say they would be working on well, trying to decide what should be done to it. This is the 3rd time I have been up there and found no one on location. Frac tanks still at site altho I have heard water trucks are visiting regularly. Well has been shut-in 30 days and Kelly has been very responsible to call weekly with reports of progress.

1335543323 2012-04-26 Drill / Deepen / Reopen No Violations Dan Goins and I went in to meet with Jamie Haga of PDC. Location was being built and the rain shut the crew down. Stumps would be chiped up.
1337198169 2012-05-16 Drill / Deepen / Reopen No Violations Currently drilling at 805.
1337614271 2012-05-10 Drill / Deepen / Reopen No Violations Moving in Dallas-Morris Drlg to drill well, setting rig up at this time.
1338639236 2012-05-22 Drill / Deepen / Reopen No Violations Cement returned to surface, plug down at 3:30 am.
1341602158 2012-07-06 Completion Testing No Violations Kelly from Denver called today to let me know they would be flaring well starting Monday. Said they had fraced well on 7/3/12 -
1342561544 2012-07-17 Completion Testing No Violations My inspection this day to see progress of completion. I found flare still is not going, logging crew on location and swabbing well with that truck. Tubing has been run, frac tanks still all in place. They are swabbing water back into frac tank. Operator forgot to call before fracing, Mike says they used 7300 bbl water.
1348065044 2012-09-19 Drill / Deepen / Reopen No Violations I accompanied Dan Goins to check status on well and it was found to be shut in after fracing operation. Well head has christmas tree installed and site location is acceptable. 17 frac tanks are still on location.
1471068922 2012-05-07 Drill / Deepen / Reopen No Violations Main drilling rig moving in later in week.
1508255502 2012-05-22 Drill / Deepen / Reopen No Violations Witnessed 13 3/8 casing being ran for intermediate string.
1568720626 2012-05-16 Drill / Deepen / Reopen No Violations Drill depth at time of inspection 805ft.
1614498401 2012-05-14 Drill / Deepen / Reopen No Violations Cemented surface casing, had trouble installing cement head on casing.
1638772768 2012-05-13 Drill / Deepen / Reopen No Violations Witnessed surface casing being ran into well.
1802275045 2012-08-30 Completion Testing No Violations I met with Jake Caplan this day and talked while watching the well be swabbed off. They started swabbing yesterday and will continue until tomorrow afternoon, hoping to get a show of oil or gas by then. 8/31/12 - still swabbing water, no hydrocarbons. Will continue into next week.
1844743817 2012-05-22 Drill / Deepen / Reopen No Violations Witnessed 9 5/8 casing ran and cemented back to surface, ran 1901ft with 2 baskets placed at 183ft and 63ft from surface.
1914983700 2012-05-02 Drill / Deepen / Reopen No Violations Building well site, drilling rig moving in Thursday to set conductor.
2102151978 2019-02-19 Production Wells No Violations I was on location today to do a field inspection on this well. The well was equipped with gauges for monitoring pressure on the 9.625 and 13.375 casing strings. The well did not have any identification on it and is required to because there is multiple wells producing into the same production tanks. The pumper was on location during my inspection so let him know that the well needed legible identification on it.
2132310721 2013-10-07 Drill / Deepen / Reopen No Violations Well is still shut in and gates have been constructed around the wellhead. There is no production equipment on site. PDC stated they are waiting on surveyor to get them a plat so they can proceed with getting horizontal permits. They are planning at this time to convert this well into a UIC well should they get the landowners approval. If they do not then they will plug the well.
830104606 2013-1-8 0:00:0 DD No Violations