Well ID: 34-115-21187
Loading map...
Country: United States
State: Ohio
County: Morgan
Municipality: Bristol Township
Operator Name: OHIO ENERGY ASSETS, INC.
Well Pad ID:
Farm/Lease Name: HARDESTY FRANK
License Status: Final Restoration
License Date: 2013-07-29
Spud Date: 1970-11-10
Spud Drilling Contractor:
Final Drill Date: 1970-11-22
Well Total Depth: 4950.00 ft
Configuration: Vertical
Latitude: 39.700000
Longitude: -81.730000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1970-11-09 853 REDMAN OIL CO INC GeoDate 11/9/70
Original Spud 1970-11-10 QUAD=HARDESTY INFO. FOUND IN NSR.
Completed 1970-11-22 QUAD=HARDESTY INFO. FOUND IN NSR.
Reached Total Depth 1970-11-22 QUAD=HARDESTY INFO. FOUND IN NSR.
CO 1992-12-09 3243 OHIO PRODUCTION CORP GeoDate 11/9/70
Change of Owner 1998-03-10 Operator changed from 3243, OHIO PRODUCTION CORP to 6091, OHIO ENERGY ASSETS, INC.
APP 2013-07-29 Proposed Formations:CLINTON-MEDINA, Issued Date:7/29/2013, Expired Date:7/29/2015 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2013-09-25 QUAD=HARDESTY INFO. FOUND IN NSR.
Construction Permit Expires 2015-07-29 QUAD=HARDESTY INFO. FOUND IN NSR.
Record Last Modified 2017-02-10 QUAD=HARDESTY INFO. FOUND IN NSR.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 4742 4752 0
2006-09-11 4752 4778 0
4742 4752 0
4742 4752 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 2048 Bbl 60000 NSR

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 REDMAN OIL CO INC 4570.00 244.00 0
1985 REDMAN OIL CO INC 3160.00 231.00 0
1986 REDMAN OIL CO INC 3720.00 149.00 365
1987 REDMAN OIL CO INC 2349.00 0.00 365
1988 REDMAN OIL CO INC 4429.00 233.00 366
1989 REDMAN OIL CO INC 3411.00 149.00 255
1990 REDMAN OIL CO INC 2695.00 235.00 365
1991 REDMAN OIL CO INC 3020.00 194.00 305
1993 OHIO PRODUCTION CORP 2659.00 141.00 358
1994 OHIO PRODUCTION CORP 4761.00 144.00 334
1995 OHIO PRODUCTION CORP 4870.00 137.00 321
1996 OHIO PRODUCTION CORP 5272.00 308.00 334
1997 OHIO PRODUCTION CORP 4851.00 146.00 364
1998 OHIO ENERGY ASSETS, INC. 4189.00 136.00 365
1999 OHIO ENERGY ASSETS, INC. 4080.00 76.00 365
2000 OHIO ENERGY ASSETS, INC. 3440.00 92.00 365
2001 OHIO ENERGY ASSETS, INC. 3979.00 82.00 365
2002 OHIO ENERGY ASSETS, INC. 2987.00 34.00 365
2003 OHIO ENERGY ASSETS, INC. 2830.00 0.00 343
2004 OHIO ENERGY ASSETS, INC. 4266.00 96.00 353
2005 OHIO ENERGY ASSETS, INC. 3133.00 84.00 349
2006 OHIO ENERGY ASSETS, INC. 3747.00 58.00 304
2007 OHIO ENERGY ASSETS, INC. 3294.00 113.00 336
2008 OHIO ENERGY ASSETS, INC. 2123.00 115.00 336
2009 OHIO ENERGY ASSETS, INC. 3006.00 67.00 365
2010 OHIO ENERGY ASSETS, INC. 2812.00 108.00 365
2011 OHIO ENERGY ASSETS, INC. 98.00 29.00 0
2012 OHIO ENERGY ASSETS, INC. 0.00 68.00 0
2013 OHIO ENERGY ASSETS, INC. 0.00 0.00 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 REDMAN OIL CO INC Brine 0 0
1985 REDMAN OIL CO INC Brine 0 0
1986 REDMAN OIL CO INC Brine 0 365
1987 REDMAN OIL CO INC Brine 0 365
1988 REDMAN OIL CO INC Brine 0 366
1989 REDMAN OIL CO INC Brine 20 255
1990 REDMAN OIL CO INC Brine 10 365
1991 REDMAN OIL CO INC Brine 0 305
1993 OHIO PRODUCTION CORP Brine 16 358
1994 OHIO PRODUCTION CORP Brine 0 334
1995 OHIO PRODUCTION CORP Brine 0 321
1996 OHIO PRODUCTION CORP Brine 0 334
1997 OHIO PRODUCTION CORP Brine 0 364
1998 OHIO ENERGY ASSETS, INC. Brine 0 365
1999 OHIO ENERGY ASSETS, INC. Brine 0 365
2000 OHIO ENERGY ASSETS, INC. Brine 40 365
2001 OHIO ENERGY ASSETS, INC. Brine 0 365
2002 OHIO ENERGY ASSETS, INC. Brine 0 365
2003 OHIO ENERGY ASSETS, INC. Brine 0 343
2004 OHIO ENERGY ASSETS, INC. Brine 0 353
2005 OHIO ENERGY ASSETS, INC. Brine 0 349
2006 OHIO ENERGY ASSETS, INC. Brine 0 304
2007 OHIO ENERGY ASSETS, INC. Brine 0 336
2008 OHIO ENERGY ASSETS, INC. Brine 2 336
2009 OHIO ENERGY ASSETS, INC. Brine 0 365
2010 OHIO ENERGY ASSETS, INC. Brine 20 365
2011 OHIO ENERGY ASSETS, INC. Brine 0
2012 OHIO ENERGY ASSETS, INC. Brine 75 0
2013 OHIO ENERGY ASSETS, INC. Brine 0 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1220161767 2013-5-7 0:00:0 AM No Violations
-1670767744 2014-5-15 0:00: PB No Violations
-181339404 2013-9-25 0:00: PB No Violations 2.50
-301183717 2013-5-6 0:00:0 PW No Violations 3.50
0103353249 2013-10-24 Plug / Plug Back No Violations Site does not yet meet final restoration requirements. Operator has graded entire location and access road. Power lines are still up and there are a few production lines still laying on the ground. Donny said all they have left to do is seed the location. I will return in a month to monitor the progress.
0181339404 2013-09-25 Plug / Plug Back No Violations The surface plug had dropped down 100. I was on location to witness Cemenco top off the well with 30 sacks of Class A cement. Cement remained at the surface.
0239762463 2013-09-19 Plug / Plug Back No Violations I arrived on location with Cemenco to witness the bottom hole plug job. The bottom of the tubing was set at 4795 and a 400 cement plug was set from 4395-4795. There was good circulation with oil coming up the annulus most likely from a hole somewhere in the 4.5. Knox Energy will pull the rest of the tubing from the hole then come back tomorrow to try and rip pipe starting somewhere around 3500.
0301183717 2013-05-06 Production Wells Violations Noted Upon inspection, well was find idle at location. The well was recently equipped with a reducer swedge and a bull plug. At the access road the separator and meter box are disconnected. The well was shared with #4338 and there are three 100 barrel tanks and one 1500 gallon tank in the dike. Operator must post ID and make well capable of production within 60 days; or plugging is required in 60 days. I talked with John Melville, the field manager, and he said they plan on plugging the well and will get the plugging permit to the state in the next 30 days.
0879886066 2015-11-02 Final Restoration No Violations On my inspection today I found this well to be in compliance with 1509.072(B). All equipment has been removed from the site and vegetation has been restored to the site.
103353249 2013-10-24 0:00 PB No Violations 0.50
1042837349 2003-01-17 Production Wells No Violations Well is producing,no violations noted this inspection

No GPS readings,bad day weather conditions poor.

1220161767 2013-05-07 Administrative Inspection No Violations I talked with Joe Melville and he stated that they will either patch the casing, plug the well, or give the well to PDC. Either way, they will have the issue resolved in a month.
1304858616 2014-06-09 Final Restoration No Violations There is no evidence of production equipment left behind and the land was properly restored. The location has met all 1509.072B restoration requirements.
1380032061 2013-09-23 Plug / Plug Back No Violations Knox Energy single pole rig was plugging well. They had 4.5casing ripped off and ran tubing of 2.375upset to 2591. We set a Lime plug at 2591-2291. The Berea plug was set at 1478-1290. The Bottom of the surface plug was set at 673-473. The surface plug was at 200-0. Formation ran total of 125 sacks of class A cement at 2%gel and 125 sacks of cement at 1%gel cement. All plugs circulated.
1670767744 2014-05-15 Plug / Plug Back No Violations Site does not yet meet final restoration requirements. Operator has graded entire location and access road. Power lines are still up and there are a few production lines still laying on the ground. The access road has some grassy areas but still needs a lot of work. I talked with Joe Melville and he will contact Donny with Knox Energy.
2056977507 2013-07-11 Production Wells No Violations Compliance Action Follow-up -301183717: There have been no resolution to any of the issues. 7/12/2013: I talked with Joe Melville and he stated he will be coming down next week. PDC did not want this well so they are going to file for a permit to plug. He already has Knox Energy lined up with a plan to plug the well sometime in August. 8/28/2013: I have received the permit to plug this well.
239762463 2013-9-19 0:00: PB No Violations 0.50
879886066 2015-11-2 0:00: FR No Violations 1.00

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0301183717 US-OH-123125 2014-01-28 Well shall be plugged
0301183717 US-OH-123126 2014-01-28 Nonproduction; well shall be plugged or placed in temporary inactive status

For data sources see[9]