If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24834 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.84,"lon":-80.84,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Switzerland Township | |
Operator Name: CNX GAS COMPANY LLC | |
Well Pad ID: US-OH-001545 | |
Farm/Lease Name: RICHARD E LEHMAN | |
License Status: Producing | |
License Date: 2018-03-20 | |
Spud Date: 2018-03-21 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2018-07-01 | |
Well Total Depth: 23051.00 ft | |
Configuration: Horizontal | |
Latitude: 39.840000 | |
Longitude: -80.840000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-03-20 | Proposed Formations:POINT PLEASANT, Issued Date:3/20/2018, Expired Date:3/19/2020 12:00:00 PM, Drilling unit acres:703.85, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-07-01 | |
Correction to Well | 2018-10-05 | TARGET/TAKE PER AS-DRILLED PLAT |
Completion Report Received | 2018-12-18 | |
Record Last Modified | 2018-12-19 | |
Construction Permit Expires | 2020-03-19 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-12-18 | 11598 | 11750 | 0 |
2018-12-18 | 20835 | 20933 | 0 |
20835 | 20933 | 0 | |
11598 | 11750 | 0 | |
11598 | 11750 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 08/25/2018 | 09/11/2018 | 10841 | 18,310,300.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | KSI-22 | Keane | Scale Inhibitor | 2-propenoic acid, polymer with
2-methyl-2-[(1-oxo-2- propenyl)amino]-1-propensulfonic acid monosodium salt and sodium phosphinite |
110224-99-2 | 10 | 0.00182861 | 3834.86 |
Methanol | 67-56-1 | 50 | 0.00914306 | 19174.3 | ||||
Other Chemical(s) | Listed Above | See Trade Name(s) List | ethylbenzene | 100-41-4 | 1 | 0.00000949 | 19.897 | |
Water | 7732-18-5 | 85 | 0.0108609 | 22776.9 | ||||
isoproyl alcohol | 67-63-0 | 5 | 0.00004744 | 99.484 | ||||
Ethanol | 64-17-5 | 2.8 | 0.000410749 | 861.399 | ||||
alcohols, C 12-16, ethoxylated | 68551-12-2 | 1 | 0 | 0 | ||||
Petroleum distillate | 64742-47-8 | 20 | 0 | 0 | ||||
Alcohols, C7-9-iso-, C8-rich | 68526-83-0 | 5 | 0.00004744 | 99.484 | ||||
Fatty imidazoline | 61790-69-0 | 5 | 0.00004744 | 99.484 | ||||
Citric acid | 77-92-9 | 40 | 0.000785916 | 1648.18 | ||||
alcohols, C 12-16, ethoxylated | 68551-12-2 | 1.5 | 0.00002475 | 51.913 | ||||
xylene | 1330-20-7 | 5 | 0.00004744 | 99.484 | ||||
didecyldimethylammonium chloride | 7173-51-5 | 8 | 0.00116917 | 2451.91 | ||||
prop-2-yn-1-ol | 107-19-7 | 5 | 0.00004744 | 99.484 | ||||
oleic acid diethanolamide | 93-83-4 | 1.5 | 0.00002475 | 51.913 | ||||
ammonium chloride | 12125-02-9 | 1.5 | 0 | 0 | ||||
Water | 7732-18-5 | 92.5 | 0.549522 | 1,152,430.0 | ||||
oleic acid diethanolamide | 93-83-4 | 1.5 | 0 | 0 | ||||
Distillates (petroleum), hydrotreated light | 64742-47-8 | 55 | 0 | 0 | ||||
2-propenoic acid, polymer with
2-methyl-2-[(1-oxo-2- propenyl)amino]-1-propensulfonic acid monosodium salt and sodium phosphinite |
110224-99-2 | 10 | 0.00182861 | 3834.86 | ||||
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 5.3 | 0.000778956 | 1633.58 | ||||
Petroleum distillate | 64742-47-8 | 20 | 0.000330053 | 692.168 | ||||
alcohols, C10-16 ethoxylated | 68002-97-1 | 5 | 0.00187035 | 3922.4 | ||||
ammonium chloride | 12125-02-9 | 2 | 0.00003301 | 69.217 | ||||
KFR-25 | Keane | Friction Reducer | ammonium chloride | 12125-02-9 | 2 | 0.00003301 | 69.217 | |
Water | 7732-18-5 | 60 | 0.000990158 | 2076.5 | ||||
Petroleum distillate | 64742-47-8 | 20 | 0.000330053 | 692.168 | ||||
oleic acid diethanolamide | 93-83-4 | 1.5 | 0.00002475 | 51.913 | ||||
alcohols, C 12-16, ethoxylated | 68551-12-2 | 1.5 | 0.00002475 | 51.913 | ||||
KAI-12 | Keane | Acid Inhibitor | xylene | 1330-20-7 | 5 | 0.00004744 | 99.484 | |
Methanol | 67-56-1 | 90 | 0.000853882 | 1790.71 | ||||
ethylbenzene | 100-41-4 | 1 | 0.00000949 | 19.897 | ||||
Fatty imidazoline | 61790-69-0 | 5 | 0.00004744 | 99.484 | ||||
isoproyl alcohol | 67-63-0 | 5 | 0.00004744 | 99.484 | ||||
Alcohols, C7-9-iso-, C8-rich | 68526-83-0 | 5 | 0.00004744 | 99.484 | ||||
prop-2-yn-1-ol | 107-19-7 | 5 | 0.00004744 | 99.484 | ||||
Carbolite Ceramic | Keane | Proppant | Ceramic materials and wares, chemicals | 66402-68-4 | 100 | 13.719 | 28,770,600.0 | |
Hydrochloric Acid (15%) | Keane | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.00191663 | 4019.46 | |
Water | 7732-18-5 | 85 | 0.0108609 | 22776.9 | ||||
KFR-41 | Keane | Friction Reducer | alcohols, C10-16 ethoxylated | 68002-97-1 | 5 | 0.00187035 | 3922.4 | |
Distillates (petroleum), hydrotreated light | 64742-47-8 | 50 | 0.0187035 | 39224 | ||||
KFEAC-30 | Keane | Iron Control | Citric acid | 77-92-9 | 40 | 0.000785916 | 1648.18 | |
acetic acid | 64-19-7 | 60 | 0.00117887 | 2472.27 | ||||
MBC-516 | Keane | Biocide | didecyldimethylammonium chloride | 7173-51-5 | 8 | 0.00116917 | 2451.91 | |
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 5.3 | 0.000778956 | 1633.58 | ||||
glutaral | 111-30-8 | 26.7 | 0.00391678 | 8214.06 | ||||
Ethanol | 64-17-5 | 2.8 | 0.000410749 | 861.399 | ||||
Sand (Proppant) | Keane | Proppant | Crystalline silica: Quartz (SiO2) | 14808-60-7 | 100 | 12.7384 | 26,714,300.0 | |
Hydrochloric Acid (7.5%) | Keane | Acid Inhibitor | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0445559 | 93440.1 | |
Water | 7732-18-5 | 92.5 | 0.549522 | 1,152,430.0 | ||||
Water | Ascent | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 72.8608 | 152,800,000.0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-09-11 | H2O | 15 | 7370 Bbl | 551600 | Keane Frac | STAGE 47/47
STAGES 2-46 SEE IMAGES |
2018-08-25 | H2O | 15 | 11067 Bbl | 613400 | Keane Frac | STAGE 1/47
STAGES 2-46 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | CNX GAS COMPANY LLC | 954027 | 0 | 42 |
2019 | CNX GAS COMPANY LLC | 1865795 | 0 | 89 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | CNX GAS COMPANY LLC | Brine | 22594 | 42 |
2019 | CNX GAS COMPANY LLC | Brine | 25815 | 89 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1522685029 | 2018-04-02 | Casing String Witnessed | No Violations | On site inspection at 5:00 am to witness the surface-mine string cement job with Decker Drilling rig # 8 on location along with Halliburton Cement Service. The rig has drilled a 24 diameter surface-mine string borehole to a measured depth of 800 with the depth measured off a drilling rig Kelly Bushing heigth of 12 above ground level, There was a coal seam encountered between the depths of 713 and 724. Proceeding the drilling the drill string was pulled and 762 of 18.625 diameter J-55 Grade buttress thread casing was ran to a depth of 762 with a casing shoe ran on bottom and a swell packer and DV tool set in the string between the depths of 457 and 469. Halliburton cemented the casing in a 2 stage cement job with the bottom section below the mine cemented using a 65 barrel cement mix consisting of 400 sacks of class A cement with the cement weight verified t 15.8 pounds per gallon by weight of cement. The 1st stage was displaced with 233 barrels of fresh water and upon the landing of the cement plug the pressure was increased to 500 psi to verify casing integrity. Following a 5 minute casing test the pressure was increased in increments slowly until the swell packer deployed and inflated at 1,020 psi. Once the packer was confirmed as deployed the DV tool sleeve opening tool dropped the 2ns stage cement job commenced. The upper section was cemented with a 130 barrel class A cement mix consisting of 600 sacks of cement weighing 15.8 pounds per gallon by weight of scale. The cement was displaced with 143 barrels of fresh water with 34 barrels of cement returns witnessed to surface. The displacement pressure was 190 (PSI) pounds per square inch upon the landing of the plug and increased to 883 psi to verify casing integrity. |
1528816149 | 2018-06-12 | Drill / Deepen / Reopen | No Violations | On this day, I found the Patterson 803 rig is currently drilling the deep intermediate 12.25 inch diameter borehole at a depth of 4,100 feet. The most recent survey had an inclination of 22.02 degrees and an azimuth of 286 degrees. The projected total depth for the 12.25 inch borehole is 10,187 feet. I spoke with Company Man, Dewayne Finney during the inspection. |
1571794339 | 2019-8-14 0:00: | PW | No Violations | 0.50 |
1727268288 | 2019-01-22 | Preliminary Restoration | No Violations | On this day, I am conducting a preliminary restoration inspection. Site meets 1509.072 (A) Vegetation is established with no substantial erosion. I found the pad gated with signage at the entrance. There are (4) producing wells, (4) gas processing units (GPU), (4) 400-barrel and (1) 100-barrel steel production tanks within polymer lined steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Additionally, concrete barriers surround the perimeter of the wellheads and the GPUs. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 1,000 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 200 psi. |
1858872288 | 2020-5-8 0:00:0 | PW | No Violations | 0.30 |
2006644483 | 2018-10-09 | Completion Testing | No Violations | Status check inspection found 4 wells present on the pad and the well drilling process complete on all 4 wells. Keane Pressure pumping Service is on location and 2 of the 4 wells present have had the stimulation process complete. The said well is complete with 47 stages being stimulated with the last initial shut in pressure being 6,852 pounds pressure before the isolation plug was set. All annular pressures are monitored electronically during stimulation and while the remainder of the wells on the pad are being stimulated. |
For data sources see[10]