Well Details

Well ID: 34-111-24824
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Benton Township
Operator Name: TRIAD HUNTER LLC
Well Pad ID: US-OH-001543
Farm/Lease Name: POOL
License Status: Producing
License Date: 2018-03-07
Spud Date: 2018-03-20
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2018-06-12
Well Total Depth: 21720.00 ft
Configuration: Horizontal
Latitude: 39.590000
Longitude: -81.100000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-03-07 Proposed Formations:POINT PLEASANT, Issued Date:3/7/2018, Expired Date:3/6/2020 12:00:00 PM, Drilling unit acres:686.7, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2018-06-12 UPDATE STATUS PER PRODUCTION RECEIVED 12/18/18-ALE.
Completion Report Received 2019-01-15 UPDATE STATUS PER PRODUCTION RECEIVED 12/18/18-ALE.
Record Last Modified 2019-01-24 UPDATE STATUS PER PRODUCTION RECEIVED 12/18/18-ALE.
Construction Permit Expires 2020-03-06 UPDATE STATUS PER PRODUCTION RECEIVED 12/18/18-ALE.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2019-04-02 10493 10635 0
2019-04-02 21525 21620 0
21525 21620 0
10493 10635 0
10493 10635 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 07/09/2018 07/30/2018 9515 22,020,300.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 K-BAC 1005 WST Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 5.8 0.000802262 1697.43
Water 7732-18-5 44.3 0.00617018 13054.9
Polyethylene glycol 25322-68-3 50 0.00696408 14734.6
SI-20 Moon Scale inhibitor Water 7732-18-5 55 0.0122225 25860.3
Phosphinocarboxylic Acid 110224-99-2 45 0.0100002 21158.4
NEFE-180 Chemplex Corrosion Inhibitor/Iron Control Fatty acids, tall oil 61790-12-3 5 0.00009801 207.365
2-Propyn-1-ol 107-19-7 5 0.00009801 207.365
Coconut oil acid diethanolamine 68603-42-9 5 0.00009801 207.365
Olefin Proprietary 5 0.00009801 207.365
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00009801 207.365
2-Ethylhexanol 104-76-7 10 0.000196016 414.73
Acetic acid 64-19-7 65 0.0012741 2695.74
Methanol 67-56-1 35 0.000686055 1451.55
Sodium Persulfate Chemplex Gel Breaker Disodium peroxodisulphate 7775-27-1 100 0.00000473 10
Plexslick 957 Chemplex Friction Reducer Petroleum Distillate 64742-47-8 20 0.0136791 28942.3
Water 7732-18-5 60 0.0410373 86826.8
Alcohols, C12-16, Ethoxylated 68551-12-2 1.5 0.00102593 2170.67
Ammonium Chloride 12125-02-9 2 0.00136791 2894.23
Oleic Acid Diethanolamide 93-83-4 1.5 0.00102593 2170.67
Sand (Resin coated) Muskie Proppant Phenolic Resin 9003-35-4 4 0.012307 26039.2
Silica Substrate 14808-60-7 96 0.295369 624941
Sand (Silca) Muskie Proppant Silica Substrate 14808-60-7 100 12.4178 26,273,500.0
Water Blue Ridge Mountain Resources Carrier Fluid Water 7732-18-5 100 86.8511 183,759,000.0
Other Chemical(s) Listed Above See Trade Name(s) List Ammonium Chloride 12125-02-9 2 0.00136791 2894.23
Alcohols, C12-16, Ethoxylated 68551-12-2 1.5 0.00102593 2170.67
Water 7732-18-5 60 0.0410373 86826.8
Water 7732-18-5 44.3 0.00617018 13054.9
Methanol 67-56-1 35 0.000686055 1451.55
Oleic Acid Diethanolamide 93-83-4 1.5 0.00102593 2170.67
Water 7732-18-5 55 0.0122225 25860.3
Coconut oil acid diethanolamine 68603-42-9 5 0.00009801 207.365
Organophylic Clay Proprietary 2 0.00000387 8.191
Cyrstaline silca 14808-60-7 0.1 0.00000012 0.246
2-Propyn-1-ol 107-19-7 5 0.00009801 207.365
Polyethylene glycol 25322-68-3 50 0.00696408 14734.6
2-Ethylhexanol 104-76-7 10 0.000196016 414.73
Phenolic Resin 9003-35-4 4 0.012307 26039.2
Alcohol ethoxylate 34398-01-1 1 0.00000194 4.096
Guar Gum 9000-30-0 50 0.00009679 204.778
Olefin Proprietary 5 0.00009801 207.365
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00009801 207.365
Fatty acids, tall oil 61790-12-3 5 0.00009801 207.365
Water 7732-18-5 72 0.2281 482613
Hydrochloric Acid (28%) Oxy Acidizing Water 7732-18-5 72 0.2281 482613
Hydrochloric Acid (Hydrogen Chloride) 7647-01-0 28 0.0887054 187683
Plexgel 907L-EB Chemplex Gelling Agent Organophylic Clay Proprietary 2 0.00000387 8.191
Cyrstaline silca 14808-60-7 0.1 0.00000012 0.246
Guar Gum 9000-30-0 50 0.00009679 204.778
Distilates (petroleum), Hydrotreated Light 64742-47-8 50 0.00009679 204.778
Alcohol ethoxylate 34398-01-1 1 0.00000194 4.096

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-07-09 H2O 15 12078 Bbl 420640 STINGRAY PRESSURE PUMPING LLC STAGE 1/64

STAGES 2-63 SEE IMAGES

2018-07-30 H2O 15 7047 Bbl 416760 STINGRAY PRESSURE PUMPING LLC STAGE 64/64

STAGES 2-63 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 TRIAD HUNTER LLC 1048249 0 184
2019 TRIAD HUNTER LLC 611079 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 TRIAD HUNTER LLC Brine 29299 184
2019 TRIAD HUNTER LLC Brine 16851 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-330093791 2018-8-21 0:00: CT No Violations
-565492450 2018-4-13 0:00: DD No Violations 0.50
-63548554 2018-6-25 0:00: CT No Violations 0.30
-851800895 2018-4-4 0:00:0 DD No Violations 0.70
0063548554 2018-06-25 Completion Testing No Violations Status check inspection on the well completion process found the company has installed a lower master valve and is preparing the well for stimulation. Annular pressure monitoring is in place and is being checked daily. The company will fill the mouse holes and pour extra concrete in the cellar up to the base plate of the surface casing tomorrow morning. This will be to add extra support to the well head. The well pad earthen poly liner is intact with rubber mats in place on the liner. All rig equipment is off site. There will be an above ground storage tank placed on the well pad location.
0330093791 2018-08-21 Completion Testing No Violations Status check inspection found the well drilling -stimulation and completion drill out operations now complete. The company man on site indicated that 2.875 diameter L-80 grade 6.5 pound per foot production tubing was set in the well bore on a tubing hanger. The tubing was set to a measured depth of 10,141 with a tubing profile X nipple set in the string at 9,810 and an XN nipple also set in the string at 10,105. The tubing hanger was positive pressure tested to 7,500 pounds per square inch for 15 minutes then negative tested for 15 minutes also. The well head consists of a lower A and upper B section followed by a production flow cross then a tubing flow cross. The tubing flow cross consists of a primary master valve followed by a secondary master valve with a total of (2) emergency shut down valves present in the well head production assembly. Crews are on site installing the production equipment downstream from the well head assembly. Crews are also on site mopping up from the completion process which includes pressure washing and removing all containment mats, all fluid created is being recovered and hauled from site by the means of a vacuum truck. All perimeter drain valves are in the closed position and no surface water is being discharged. 3 wells are present on this pad.
0565492450 2018-04-13 Drill / Deepen / Reopen No Violations Status check inspection to document the current well drilling status. H&P Drilling rig # 371 is on location and currently drilling the # 2-H well vertical section. The said well the Pool # 3-H has had the conductor- the 17.5 diameter surface casing and the 9.625 1st intermediate casing string set. The 9.625 diameter 43.5 pound per foot casing was set down to a measured depth of 9,201 and cemented back to surface by C&J Cement Service with the 9.625 diameter casing cement ticket reflecting a total of 228 barrels of cement returns to surface. The company men on site have been to directed to monitor all casing annular pressures during the well drilling process as indicated in 1501:9-1 of the well construction rules.
0611025343 2018-03-22 Casing String Witnessed No Violations The purpose of my inspection was to witness cement operations on the conductor casing. Express Energy was on location with 2 auger rigs, 2 bulk cement trucks, and one pump truck. The borehole was 26 inches in diameter and was drilled to 120 feet in depth. No water was encountered during the drilling process. A 20 inch diameter conductor was set on bottom of the borehole at 120 feet. Express held a pre job safety meeting with all personnel on location. Following the safety meeting Expressed plumbed up to the casing and pumped 10 barrels of fresh water ahead of 230 sacks of class A cement weighing 15.6 pounds per gallon and 39 barrels of fresh water for displacement. 10 feet of cement was left within the casing and the remaining cement filled the annuals and circulated to surface. Returns were siphoned from the cellar.
0851800895 2018-04-04 Drill / Deepen / Reopen No Violations On this day, Im visiting this wellsite per request of ODNR Inspector William Stolarik. I found the H&P Flexrig 371 rig is currently drilling the 12.25 inch diameter wellbore at a depth of 6,163 feet. I spoke with Company Man Tim Fields and he indicated that they plan to batch-drill three wells through the intermediate casing string, and skid the rig back to complete the lateral section. Due to a recent rain event, the pad became flooded with rainwater, so it was decided to have an environmental group, K.C. Harvey, test their water, and then drain the pad, prior to my visit. The valves have since been closed, and vac trucks will be onsite to remove the residual water. It will also be noted that the well is currently being drilled on air, and experiencing occasional, non-sustained flares. No flare was witnessed during the time of inspection. Tim Fields notified myself, and additional contacts of the flare, as required by their permit condition. I also advised to continue maintaining filter socks along the slopes of the wellpad, after the rain event.
1528216953 2018-06-05 Drill / Deepen / Reopen No Violations
1552307210 2018-07-23 Completion Testing No Violations
294411853 2020-9-3 0:00:0 PL No Violations 0.40
611025343 2018-3-22 0:00: CS No Violations 1.00