X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24742

Well Details

Well ID: 34-111-24742
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Perry Township
Operator Name: DIVERSIFIED PRODUCTION LLC
Well Pad ID: US-OH-001473
Farm/Lease Name: VALENKA 2
License Status: Producing
License Date: 2019-01-14
Spud Date: 2017-05-18
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2019-02-21
Well Total Depth: 20178.00 ft
Configuration: Horizontal
Latitude: 39.670000
Longitude: -81.090000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-05-03 Proposed Formations:POINT PLEASANT, Issued Date:5/3/2017, Expired Date:5/3/2019 12:00:00 PM, Drilling unit acres:267.239, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2017-05-12 CORRECTION TO CASING PROGRAM, UNIT SIZE AND SPECIAL PERMIT CONDITIONS.
APP 2019-01-14 Proposed Formations:POINT PLEASANT, Issued Date:1/14/2019, Expired Date:1/13/2021 12:00:00 PM, Drilling unit acres:599.598, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2019-02-21
Record Last Modified 2019-05-07
Construction Permit Expires 2021-01-13

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
10168 20036 0
10168 20036 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1268883257 2020-1-6 0:00:0 CT No Violations 0.40
-1798646704 2019-5-24 0:00: DD No Violations 0.20
0081992859 2017-05-19 Casing String Witnessed No Violations On site inspection to witness the conductor casing cement job.with Bryan Constructon top hole rig and O-Tex cement surface. The rig has drilled a 36 diameter conductor borehole to solid bed rock at 94 and set 26 .375 wall casing to 94 measured depth from ground level. O-Tex cement service cemented the casing using a 81.9 barrel class H cement mix with the cement weight being verified at 15.6 pound per gallon by weight of cement. Cement returnd were witnessed to surface at 38 barrels into displacement.
1129376210 2020-1-6 0:00:0 CT No Violations 0.30
1587008469 2019-02-05 Drill / Deepen / Reopen No Violations On this day, I found the Patterson 714 rig drilling ahead in the 12.25 inch diameter intermediate borehole at depth of 3,459 feet. The 17.5 inch diameter surface borehole was drilled to a depth of 2,043 feet, and the 13.325 inch diameter casing was cemented at a depth of 2,013 feet. I spoke with Company Man Duane Goodsell and he stated that no gas was encountered throughout the surface borehole. It will be noted that recent weather events have saturated the pad. They are attempting to address the excess water, and maintain the roadways. All pad drains are currently closed, and all water is tested by a third-party company prior to draining.
1798646704 2019-05-24 Drill / Deepen / Reopen No Violations On this day, I found the pad fenced and gated with signage at the entrance. An earthen berm surrounds the perimeter of the pad. The drilling process is finalized, and the well is not completed. A nightcap is currently in place. The timeframe is unknown as to when the completion process will commence. It will be noted that ProPipeline is currently working on the northwest slope of the pad, and have removed a section of the fencing and berm. ODNR Engineering Technician Andrew Thomas will be notified. The preliminary restoration will be addressed at a later date.
1815853088 2020-9-9 0:00:0 PW No Violations 0.40
2032427303 2020-3-2 0:00:0 CT No Violations 1.50
740531344 2020-1-9 0:00:0 CT No Violations 0.40
81992859 2017-5-19 0:00: CS No Violations 2.00

For data sources see[4]

References