If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24715 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.74,"lon":-81.06,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Center Township | |
Operator Name: GULFPORT APPALACHIA LLC | |
Well Pad ID: US-OH-001439 | |
Farm/Lease Name: PAULUS 211153 | |
License Status: Producing | |
License Date: 2017-02-22 | |
Spud Date: 2017-01-29 | |
Spud Drilling Contractor: | |
Final Drill Date: 2017-05-13 | |
Well Total Depth: 19701.00 ft | |
Configuration: Horizontal | |
Latitude: 39.740000 | |
Longitude: -81.060000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-01-19 | Proposed Formations:TRENTON, Issued Date:1/19/2017, Expired Date:1/19/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2017-02-22 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:2/22/2017, Expired Date:2/22/2019 12:00:00 PM, Drilling unit acres:436.201, Proposed Well Type:OG, Proposed Well Class:EOUT |
Record Last Modified | 2017-03-01 | |
Correction to Well | 2018-02-09 | CHANGE TO TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Construction Permit Expires | 2019-02-22 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
19395 | 19559 | 0 | |
10714 | 10852 | 0 | |
10714 | 10852 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 02/13/2019 | 03/05/2019 | 9813 | 15,771,000.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.328521 | 488970 |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 88.2641 | 131,372,000.0 | |
SCALECHEK LP-70 | Halliburton | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-PREMIUM WHITE-40/70, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
FDP-S1296-17
FDP-S1 |
Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
EXCELERATE PS-2 | Halliburton | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
Inorganic salt | Proprietary | 30 | 0.0263988 | 39292 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.0359196 | 53462.8 | ||||
Ethylene glycol | 107-21-1 | 60 | 0.00930803 | 13855 | ||||
Ethoxylated Alcohols | Proprietary | 5 | 0.00002093 | 32 | ||||
Propargyl Alcohol | 107-19-7 | 5 | 0.00002093 | 32 | ||||
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl chlorides |
68424-85-1 | 5 | 0.00162354 | 2417 | ||||
Phosphoric acid | 7664-38-2 | 0.1 | 0.00003247 | 49 | ||||
Modified Thiourea Polymer | Proprietary | 30 | 0.000125555 | 187 | ||||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0263988 | 39292 | ||||
Acrylic acid | 79-10-7 | 0.01 | 0.00000155 | 3 | ||||
Acrylamide acrylate polymer | Proprietary | 30 | 0.0263988 | 39292 | ||||
Methanol | 67-56-1 | 100 | 0.000463976 | 691 | ||||
Sodium polyacrylate | 9003-04-7 | 1 | 0.000155134 | 231 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.00974125 | 14499 | ||||
Ethanol | 64-17-5 | 1 | 0.000324708 | 484 | ||||
Telmer | Proprietary | 10 | 0.00155134 | 2310 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 11.3601 | 16,908,300.0 | ||||
MC B-8614 | Halliburton | Biocide | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0568184954 | 2019-05-16 | Completion Testing | No Violations | On this day, I found the drilling and hydraulic fracturing processes are completed. The frac plugs have been drilled out and the well is currently in the flowback stage. I spoke with Gulfport Representatives Corey Cloud and Robert Coots during the inspection. Annular pressure monitoring devices are in place and pressures are logged daily. Identification is posted at the wellhead. |
1025013760 | 2017-02-01 | Drill / Deepen / Reopen | No Violations | On the day inspection I witnessed that Lightning Energy Services had drilled a 36 inch diameter hole to the depth of 110 feet, hitting water at 40 feet and ran 110 feet of 26 inch diameter 85.6 pounds per foot conductor pipe. Stingray Pressure Pumping was onsite pumped 2 barrels of fresh water, performed a 500 pounds per square inch pressure test, gained circulation with 10 barrels of fresh water, pumped 15 barrels of gel, pumped 10 barrels of fresh water and cemented pipe with 470 sacks Class A cement with 2% CaCl and .25 pound per sack of celluseal weighing 15.6 pounds per gallon and a yield of 1.2 cubic foot per sack. Cement was weight was verified with pressurized mud scales and displaced to 100 feet with 60 barrels of fresh water with good cement returns of 19 barrels to surface. Mix water was tested revealing chlorides of 43 parts per million, pH 7 and 53 degrees. |
1493111241 | 2017-04-25 | Casing String Witnessed | No Violations | On site inspection to witness the Surface casing cement job accompanied by ODNR Inspector Andrew Corder. Pioneer Drilling rig # 73 is on location along with O-Tex cement service. The rig has drilled at 17.5 diameter surface borehole to a measured depth of 1,385. The rig then proceeded to pull the drill string and run the 54.5 pound per foot J-55 grade buttress thread casing with the last 3 casing joint circulated in the hole to bottom. O-Tex Cement Service cemented the casing by first pumping 50 barrels of 6% gel spacer followed by 262 barrels of cement consisting of 1,220 sacks of class H cement with 3% calcium and 1/4 pound per sack loss circulation material. The cement weight was verified at 15.6 pound per gallon by weight of scale. The cement was displaced to the float collar with a total of 207 barrels of recycled water, cement returns were witnessed to surface at 165 barrels into displacement. The casing was pressure tested to 1,150 PSI with a displacement pressure of 629 psi prior to the landing of the plug. |
1493130633 | 2017-04-25 | Casing String Witnessed | No Violations | |
1497550412 | 2017-06-15 | Drill / Deepen / Reopen | No Violations | |
1529328663 | 2018-06-18 | Completion Testing | No Violations | On this day, I am conducting an inspection per request of ODNR Inspector William Stolarik. I spoke with Company Man, Ken Miller, during my inspection. (10) wells were drilled on the pad. They are currently plumbing the intermediate and surface casing, at the wellhead, and preparing to install pressure monitoring devices. The grates will be replaced over the cellar, when they are finished. |
1537802305 | 2018-09-24 | Completion Testing | No Violations | Status update inspection found a total of 10 wells present on this well pad. All 10 have been drilled and not completed. Each well is equipped with a lower A and upper well head section with 2 diameter riser pipes present on each section with valves and gauges present on each section for annular pressure monitoring. The casing head does have a multi valve set up with a mechanical gauge present. No tubing is in the well. No production equipment is present on the well pad other than the 3rd party mid stream pipeline. The well pad does have an earthen berm in place. The well pad surface and lease road is of stone construction and in good repair. Addressing the preliminary restoration. There is an area along the lease road that is within the well site boundary that was recently disturbed by the installation of a transportation pipeline. There is also a area on the West side of the well pad that was disturbed and vegetation not established. Larger diameter wooden poles are set on the East side of the well pad along the pad surface boundary for sound barrier during stimulation. There are (2) 12 diameter trunk lines that have been laid along the well pad perimeter, these lines are fresh water lines to support the stimulation process. The lease road does have a gate present. |
2100637659 | 2019-02-13 | Completion Testing | No Violations | On this day, I am conducting an inspection during the completion process, and found Halliburton Pressure Pumping Service onsite along with Reach Wireline. They are zipper fracing between permit numbers 4712 (3B) and 4715 (1B). I spoke with Gulfport Company Man Dave Cole during the inspection. They just completed stage 1 of 49 with 28 shots, divided into 4 clusters. The frac plug for stage 2 will be set at a measured depth of 19,373 feet. Mr. Cole stated that annular pressures for the 13.375 inch diameter casing and 9.625 inch diameter casing are monitored and logged daily for all (10) wells on the pad. He also stated that only 5 of 10 wells will be completed at this time. |
568184954 | 2019-5-16 0:00: | CT | No Violations | 0.10 |
For data sources see[5]