If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-111-24700 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.82,"lon":-80.97,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Monroe | |
| Municipality: Sunsbury Township | |
| Operator Name: GULFPORT APPALACHIA LLC | |
| Well Pad ID: US-OH-001420 | |
| Farm/Lease Name: ARNOLD 210131 | |
| License Status: Producing | |
| License Date: 2016-12-13 | |
| Spud Date: 2016-12-18 | |
| Spud Drilling Contractor: NOMAC DRILLING CORP | |
| Final Drill Date: 2017-03-14 | |
| Well Total Depth: 17835.00 ft | |
| Configuration: Horizontal | |
| Latitude: 39.820000 | |
| Longitude: -80.970000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2016-12-13 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:12/13/2016, Expired Date:12/13/2018 12:00:00 PM, Drilling unit acres:701.613, Proposed Well Type:OG, Proposed Well Class:EOUT |
| Reached Total Depth | 2017-03-14 | |
| Correction to Well | 2018-03-30 | UPDATE TARGET/TAKE PER AS-DRILLED PLAT |
| Completion Report Received | 2018-07-13 | |
| Record Last Modified | 2018-08-02 | |
| Construction Permit Expires | 2018-12-13 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2018-08-01 | 10527 | 10697 | 0 |
| 2018-08-01 | 17511 | 17674 | 0 |
| 17511 | 17674 | 0 | |
| 10527 | 10697 | 0 | |
| 10527 | 10697 | 0 |
For data sources see[3]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 03/11/2018 | 03/26/2018 | 10088 | 10,385,400.0 | 0 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Sand (40/70 Mesh Proppant) | Muskie | Proppant | Silica Substrate | 14808-60-7 | 100 | 8.08139 | 7,761,000.0 |
| Water | Gulfport Energy | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 90.2442 | 86,666,400.0 | |
| SI-20W | Moon | Scale Inhibitor | Water | 7732-18-5 | 55 | 0.0088383 | 8487.89 | |
| Phosphinocarboxylic Acid | 110224-99-2 | 45 | 0.00723133 | 6944.64 | ||||
| Hydrochloric Acid (28%) | Dover | Acidizing | Water | 7732-18-5 | 72 | 0.162862 | 156405 | |
| Hydrochloric Acid (Hydrogen Chloride) | 7647-01-0 | 28 | 0.0633351 | 60824.1 | ||||
| Other Chemical(s) | Listed Above | See Trade Name(s) List | Water | 7732-18-5 | 60 | 0.0196921 | 18911.4 | |
| 2-Propyn-1-ol | 107-19-7 | 5 | 0.00007011 | 67.332 | ||||
| Alkyl dimethyl benzyl ammonium chloride | 68424-85-1 | 5.5 | 0.00180511 | 1733.55 | ||||
| Oleic Acid Diethanolamide | 93-83-4 | 1.5 | 0.00123652 | 1187.5 | ||||
| Methanol | 67-56-1 | 35 | 0.000490779 | 471.321 | ||||
| Fatty acids, tall oil | 61790-12-3 | 5 | 0.00007011 | 67.332 | ||||
| Ethanol | 64-17-5 | 2 | 0.000656404 | 630.38 | ||||
| Water | 7732-18-5 | 60 | 0.0494609 | 47500 | ||||
| Olefin | Proprietary | 5 | 0.00007011 | 67.332 | ||||
| Alcohols, C14-15, ethoxylated | 68951-67-7 | 5 | 0.00007011 | 67.332 | ||||
| Didecyldimethylammonium Chloride | 7173-51-5 | 8 | 0.00262562 | 2521.52 | ||||
| Coconut oil acid diethanolamine | 68603-42-9 | 5 | 0.00007011 | 67.332 | ||||
| Water | 7732-18-5 | 72 | 0.162862 | 156405 | ||||
| Ammonium Chloride | 12125-02-9 | 2 | 0.0016487 | 1583.33 | ||||
| 2-Ethylhexanol | 104-76-7 | 10 | 0.000140222 | 134.663 | ||||
| Water | 7732-18-5 | 55 | 0.0088383 | 8487.89 | ||||
| Alcohols, C12-16, Ethoxylated | 68551-12-2 | 1.5 | 0.00123652 | 1187.5 | ||||
| Sand (100 Mesh Proppant) | Muskie | Proppant | Silica Substrate | 14808-60-7 | 100 | 1.31551 | 1,263,360.0 | |
| Plexslick 957 | Chemplex | Friction Reducer | Petroleum Distillate | 64742-47-8 | 20 | 0.016487 | 15833.3 | |
| Water | 7732-18-5 | 60 | 0.0494609 | 47500 | ||||
| Ammonium Chloride | 12125-02-9 | 2 | 0.0016487 | 1583.33 | ||||
| Alcohols, C12-16, Ethoxylated | 68551-12-2 | 1.5 | 0.00123652 | 1187.5 | ||||
| Oleic Acid Diethanolamide | 93-83-4 | 1.5 | 0.00123652 | 1187.5 | ||||
| Bio B2512 | Aquaserv | Biocide | Water | 7732-18-5 | 60 | 0.0196921 | 18911.4 | |
| Alkyl dimethyl benzyl ammonium chloride | 68424-85-1 | 5.5 | 0.00180511 | 1733.55 | ||||
| Ethanol | 64-17-5 | 2 | 0.000656404 | 630.38 | ||||
| Glutaraldehyde | 111-30-8 | 27 | 0.00886145 | 8510.13 | ||||
| Didecyldimethylammonium Chloride | 7173-51-5 | 8 | 0.00262562 | 2521.52 | ||||
| NEFE-180 | Chemplex SOLVAY | Corrosion Inhibitor/Iron Control | Olefin | Proprietary | 5 | 0.00007011 | 67.332 | |
| Methanol | 67-56-1 | 35 | 0.000490779 | 471.321 | ||||
| Coconut oil acid diethanolamine | 68603-42-9 | 5 | 0.00007011 | 67.332 | ||||
| Fatty acids, tall oil | 61790-12-3 | 5 | 0.00007011 | 67.332 | ||||
| Acetic acid | 64-19-7 | 65 | 0.000911446 | 875.311 | ||||
| 2-Propyn-1-ol | 107-19-7 | 5 | 0.00007011 | 67.332 | ||||
| 2-Ethylhexanol | 104-76-7 | 10 | 0.000140222 | 134.663 | ||||
| Alcohols, C14-15, ethoxylated | 68951-67-7 | 5 | 0.00007011 | 67.332 |
For data sources see[4]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2018-03-11 | H2O | 28 | 7239 Bbl | 275340 | STINGRAY PRESSURE PUMPING LLC | STAGE 1 OF 34 |
| 2018-03-26 | H2O | 28 | 6754 Bbl | 275800 | STINGRAY PRESSURE PUMPING LLC | STAGE 34 OF 34 SEE IMAGES FOR STAGES 2-33 |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2018 | GULFPORT ENERGY CORPORATION | 2397063 | 0 | 221 |
| 2019 | GULFPORT ENERGY CORPORATION | 548984 | 0 | 90 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2018 | GULFPORT ENERGY CORPORATION | Brine | 48299 | 221 |
| 2019 | GULFPORT ENERGY CORPORATION | Brine | 7465 | 90 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1424233271 | 2018-5-21 0:00: | CT | No Violations | 0.20 |
| 0007511659 | 2017-03-09 | Drill / Deepen / Reopen | No Violations | |
| 1424233271 | 2018-05-21 | Completion Testing | No Violations | Status check inspection on the well completion process found a total of 5 wells on the well pad and all 5 have had the drilling - stimulation and completion process stages completed. All wells have 2.875 production tubing set in the well bore. All production equipment is set and the wells are awaiting the initial flow back stages. A flow back company is on site identified as J&A Service, the company has flow back iron plumbed into each well head and is currently pressure testing their equipment to 8,000 pound per square inch working pressure before commencing the initial flow back production operations in the next 24 hours. All well bore annular pressure is being monitored and is being addressed accordingly with pressure reducing valves set to release pressure above line pressure of 1,000 psi. |
| 1488094782 | 2017-02-26 | Casing String Witnessed | No Violations | On site inspection to witness the surface casing cement job with Nomac Drilling rig 132 on location along with Stingray cement service. The rig has drilled a 24 surface borehole to a ,measured depth of 735 with the rig managers indicating no mine void was reported to be encountered, and no coal seam depth reported. The rig ran 734 of 18.625 diameter J-55 grade buttress thread casing with a guide shoe and float collar casing equipment ran, the last 3 casing joints were circulated in by the rig. Stingray Cement Service cemented the casing using 225 barrels of class A cement consisting of 1058 sacks of cement. 25 barrels of 6% gel spacer was pumped ahead of the cement. The cement was displaced with 213 barrels of fresh water and cement returns were witnessed to surface inside the cellar. The casing was pressure tested to 500 psi over cement displacement pressure. |
| 1543094682 | 2018-04-24 | Completion Testing | No Violations | Status check inspection found the well drilling and completion process complete and a workover rig on location owned by Hybrid Drilling. The rig has finalized the post stimulation drill out process and has set the 2.875 diameter production tubing in the well bore at a measured depth of 10,406. The well head assembly is a Cactus Well head with a 15,000 (psi) pound per square inch rated tubing flow cross assembly consisting of 3 manual valves and an emergency shut down valve capable of being remotely operated by design when final hook up of the production equipment is complete. The well head A&B sections have double valves installed on both the outlet ports and flow line risers above grade level inside the cellars with pressure gauges installed to monitor annular pressures. The company is monitoring all annular pressures daily. |
| 1654784866 | 2016-12-18 | Casing String Witnessed | No Violations | On site inspection to witness the conductor casing cement jobs with Rocky Mountain Drilling top hole rigs on location and Stingray Cement Service. A 36 round borehole was drilled to a depth of 110 in the ground. The rig then inserted 110 of .375 wall 32 diameter round line pipe casing with 3 weld connections made on the casing. Stingray Cement Service cemented the casing using 260 sacks of Class A cement with 3% calcium and 1/4 pound per sack loss circulation material. With the cement being displaced to 100 inside the casing with 60 barrels of fresh water and cement returns being witnessed to surface. The job was delayed 2 hours from my initial call out and on location time. |
| 271558248 | 2020-4-10 0:00: | PW | No Violations | 0.30 |
| 7511659 | 2017-3-9 0:00:0 | DD | No Violations | 1.50 |
For data sources see[10]