34-111-24587

Well Details

Well ID: 34-111-24587
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Switzerland Township
Operator Name: CNX GAS COMPANY LLC
Well Pad ID: US-OH-001262
Farm/Lease Name: SWITZER WOODS
License Status: Producing
License Date: 2015-05-29
Spud Date: 2016-08-13
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2016-11-17
Well Total Depth: 22106.00 ft
Configuration: Horizontal
Latitude: 39.830000
Longitude: -80.930000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-05-29 Proposed Formations:POINT PLEASANT, Issued Date:5/29/2015, Expired Date:5/28/2017 12:00:00 PM, Drilling unit acres:605.49, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2016-11-17
Correction to Well 2017-02-10 UPDATED TARGET AND TAKEPOINT PER AS DRILLED PLAT-ALE 02/08/2017
Construction Permit Expires 2017-05-28
Completion Report Received 2017-07-14
Record Last Modified 2018-02-08
Correction to Well 2018-03-30 UPDATE TO TAKE PER AS-DRILLED PLAT

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-02-08 10859 11031 0
2018-02-08 17732 17882 0
17732 17882 0
10859 11031 0
10859 11031 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 02/16/2017 05/16/2017 10479 25,427,700.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Other Chemical(s) Listed Above See Trade Name(s) List Alcohols, ethoxylated 68002-97-1 5 0.00310735 7540.96
Thiourea 62-56-6 1 0.00000608 14.746
Distillates (petroleum), hydrotreated light 64742-47-8 55 0.00994967 24146
DETA phosphonate 15827-60-8 5 0.000705486 1712.09
Methanol 67-56-1 5 0.00003038 73.728
Alcohols, ethoxylated 68439-50-9 5 0.00310735 7540.96
Alcohols, C10-16, ethoxylated 68002-97-1 50 0.000303806 737.281
Formaldehyde 50-00-0 1 0.00000608 14.746
Alcohols, ethoxylated 68551-12-2 5 0.00310735 7540.96
Quarternary ammonium compounds,

benzyl-C12-16-alkyldimethyl, chlorides

68424-85-1 2.5 0.000233471 566.592
Water 7732-18-5 83 0.00775125 18810.9
Sulfuric acid 7664-93-9 0.5 0.00001239 30.065
Ethanol 64-17-5 0.3 0.00002802 67.991
Ammonium acetate 631-61-8 13 0.0080791 19606.5
Hexamethylene Triamine Penta(Methylene Phosphonic Acid) 34690-00-1 5 0.000705486 1712.09
Water Consol Carrier/Base Fluid Water 7732-18-5 100 87.4373 212,194,000.0
WGA-7 UWS Viscosifier Distillates (petroleum), hydrotreated light 64742-47-8 55 0.00994967 24146
Guar Gum 9000-30-0 55 0.00994967 24146
Unislick ST50 UWS Friction reducer Alcohols, ethoxylated 68439-50-9 5 0.00310735 7540.96
Ammonium acetate 631-61-8 13 0.0080791 19606.5
Alcohols, ethoxylated 68551-12-2 5 0.00310735 7540.96
Petroleum distillates, hydrotreated light 64742-47-8 30 0.0186441 45245.8
Alcohols, ethoxylated 68002-97-1 5 0.00310735 7540.96
HCL Acid (15%) UWS Acidizing Hydrochloric Acid 7647-01-0 15 0.0960464 233087
Aqucar 714 UWS Biocide Water 7732-18-5 83 0.00775125 18810.9
Ethanol 64-17-5 0.3 0.00002802 67.991
Quarternary ammonium compounds,

benzyl-C12-16-alkyldimethyl, chlorides

68424-85-1 2.5 0.000233471 566.592
Glutaraldehyde 111-30-8 14 0.00130744 3172.92
AP Breaker UWS Gel breaker Ammonium peroxydisulfate 7727-54-0 100 0.00247773 6013
Sulfuric acid 7664-93-9 0.5 0.00001239 30.065
Scale Inhibitor E UWS Scale Inhibitor Hexamethylene Triamine Penta(Methylene Phosphonic Acid) 34690-00-1 5 0.000705486 1712.09
DETA phosphonate 15827-60-8 5 0.000705486 1712.09
Copolymer of Maleic and Acrylic Acid 52255-49-9 20 0.00282194 6848.34
Unihib G UWS Acid inhibitor Methanol 67-56-1 5 0.00003038 73.728
Butyl diglycol 112-34-5 75 0.000455709 1105.92
Formaldehyde 50-00-0 1 0.00000608 14.746
Alcohols, C10-16, ethoxylated 68002-97-1 50 0.000303806 737.281
Thiourea 62-56-6 1 0.00000608 14.746
Sand UWS Proppant Crystalline Silica in the form of Quartz 14808-60-7 99.9 11.5236 27,965,600.0
HCL Acid (7.5%) UWS Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0210366 51052

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-02-16 H2O 15 13662 Gal 503000 Universal Well Services Inc. STAGE 1/36

STAGES 2-35 SEE IMAGES

2017-03-07 H2O 15 10487 Gal 507800 Universal Well Services Inc. STAGE 36/36

STAGES 2-35 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 CNX GAS COMPANY LLC 2770134 0 151
2018 CNX GAS COMPANY LLC 3724268 0 359
2019 CNX GAS COMPANY LLC 481462 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 CNX GAS COMPANY LLC Brine 93596 151
2018 CNX GAS COMPANY LLC Brine 65343 359
2019 CNX GAS COMPANY LLC Brine 9458 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1058177542 2020-7-6 0:00:0 PW No Violations 1.50
-1215031056 2016-8-14 0:00: CS No Violations 5.00
-1293452111 2016-11-16 0:00 CS No Violations 1.50
-141299475 2017-7-18 0:00: PL No Violations 0.50
-1426803446 2018-8-6 0:00:0 PW No Violations 0.20
-470290146 2016-11-16 0:00 DD No Violations 1.50
-754662645 2017-4-21 0:00: CT No Violations 2.00
-875986683 2016-8-14 0:00: CS No Violations 4.00
0141299475 2017-07-18 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the well site meets ORC 1509.072 with vegetation and erosion control established in the affected area of the well pad. Addressing the well status-
0470290146 2016-11-16 Drill / Deepen / Reopen No Violations During my inspection the 5.5 inch diameter production casing had just been cemented. CNX was rigging down and preparing to haul everything off of this location and onto the CNX Switz 28 pad.
0629207692 2016-11-07 Drill / Deepen / Reopen No Violations During my inspection the Patterson 803 rig was drilling the lateral at 14739 feet.
0754662645 2017-04-21 Completion Testing No Violations Status check inspection on the well completion process found the well stimulation process complete and Deep Well Service tubing snubbing unit rigged up on the hole preparing to begin running in the hole with a 2.875 diameter work over string to drill out the completion plugs and condition the well bore in preparation for production. The well head is equipped with a blow out prevent owned by Oil States Energy, the well control device consists of (20 blind rans and (2) 2.875 diameter pipe rams. Mid Atlantic Service fluid pump truck is on location providing fluid pumping downhole circulation services with Rock Water flow back services providing well pressure control with the discharge fluid flowing into (2) 500 barrel capacity open top gas buster steel construction fluid tanks. All completion support equipment is situated on polymer containment and the well pad perimeter earthen berm serves as the primary containment. Multiple well are present on the well pad.
0875986683 2016-08-14 Casing String Witnessed No Violations On site to witness conductor pipe run and cemented in place, Express Energy drilled a 36 diameter hole to 100 and ran 100 of 30 casing and they cemented it in place with 275 sacks of Class A cement and we had 15 bbl. Of good cement returns at surface and it stayed up good.
1215031056 2016-08-14 Casing String Witnessed No Violations On site inspection to witness the conductor casing cement job found Express Energys top hole rig spudded the said well on 08/13/2016 and drilled a 36 conductor borehole to 100 and ran 100 of 30 weld connection conductor pipe. Express Energy Cemented the well using 275 sacks of class A cement with circulation established prior to cementing and the cement displaced to 85 using 70 barrels of fresh water. The rig encountered a fresh water zone at 45.
1293452111 2016-11-16 Casing String Witnessed No Violations During my inspection Patterson 803 drilling rig was running the 5.5 inch diameter production casing into the 8.75 inch diameter borehole. Allied Oilfield Services was on location preparing to cement the 5.5 inch diameter production casing.
1426803446 2018-08-06 Production Wells No Violations Status check inspection found 4 wells producing on the pad. The pad surface is of stone construction with a earthen perimeter berm, the perimeter valves are closed. The well head is equipped with a lower A and upper B section along with a production tree. The well is currently in production with the production valves open. The well head has riser pipes and valves with gauges present to monitor annular pressure on the A & B sections with 238 pounds per square inch pressure (psi) on the A section which monitors the pressure on the 13.375 diameter casing string (between the 13.375 and 9.625). The pressure on the B section which monitors the pressure on the 9.625 casing string (between the 9.625 and 5.5 diameter casing strings) is 870 pounds pressure. The 5.5 diameter production casing internal working pressure is 1,802 psi. The production flowline pressure is 1,118 psi. The well head assembly is equipped with 2 manual and one emergency shut down valve on the vertical section of the production tree followed by a single manual valve on the horizontal outlet section of the production tree. Also on location is 4 gas processing units along with a production facility tank farm consisting of 4 steel construction 400 barrel capacity tanks situated inside a polymer lined steel containment dike area. Proper well identification is posted at the well heads along with hazard and identification on the tank battery. At all critical hazard and muster points of the pad are fire extinguishers and emergency shut down master well control devices. A EQT midstream point is on the right front corner of the well pad.
1477221972 2016-10-22 Casing String Witnessed No Violations On site to witness running and cementing of 18.675 casing Patterson rig 803 was drilling contractor and they ran 710 of casing equipped with float shoe, Blackhawk packer and float collar and two baskets and seven centralizers and Allied Cementing cemented it in place with 1023 sacks of Class A cement and they had 30 bbl. Of good returns at surface.
1477662867 2016-10-28 Drill / Deepen / Reopen No Violations During the time of my inspection the Patterson Rig 803 was drilling at 5145 feet in the 12.25 inch diameter hole. No pollution violations present on location.
1514945587 2018-01-02 Production Wells No Violations On site inspection as to a response to a report of a 25 gallon fluid release on the EQT midstream production pad that is situated on a site pad that adjoins the main well pad. The pad is situated on the South West side of the Switz 5 well pad and was deplicted on the construction submittal plans in 2015. No product was visible on the earths surface and there was a roll off container on site with material place in it that had been recovered. Addressing the well, the drilling and completion process is now complete and the well is in prodcution along with 3 additional wells on the pad. There is a total of (4) gas processing units on the well pad that the wells produce into. Alos present is a production fluid storage facility consisting of (4) steel concruction 400 barrel capacity production tanks situated inside a polymer lined steel containment dike atrea. Proper identification is posted at multiple locations on site.
1719001509 2016-11-09 Drill / Deepen / Reopen No Violations During my inspection the Patterson 803 rig was drilling at a depth of 16,735 feet in the 8.75 inch diameter borehole.
629207692 2016-11-7 0:00: DD No Violations 0.50

For data sources see[10]