If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24349 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.6,"lon":-80.95,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: BECK ENERGY CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: BROWN/CONLEY | |
License Status: Producing | |
License Date: 2012-07-30 | |
Spud Date: 2012-08-06 | |
Spud Drilling Contractor: MONROE DRILLING OPERATION, LLC | |
Final Drill Date: 2012-08-09 | |
Well Total Depth: 2700.00 ft | |
Configuration: Vertical | |
Latitude: 39.600000 | |
Longitude: -80.950000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-07-30 | Proposed Formations:BEREA, 30 FOOT, GORDON, Issued Date:7/30/2012, Expired Date:7/30/2014 12:00:00 PM, Drilling unit acres:60, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2012-08-09 | |
Completion Report Received | 2013-05-31 | |
Construction Permit Expires | 2014-07-30 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-08-29 | 1996 | 2611 | 41 |
1996 | 2611 | 41 | |
1996 | 2611 | 41 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2012-08-31 | H2O | 20 | 185600 Gal | 0 | Universal Well Services Inc. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | BECK ENERGY CORPORATION | 3289.00 | 52.00 | 279 |
2014 | BECK ENERGY CORPORATION | 2027.00 | 28.00 | 365 |
2015 | BECK ENERGY CORPORATION | 1285.00 | 28.00 | 365 |
2016 | BECK ENERGY CORPORATION | 1113.00 | 10.00 | 365 |
2017 | BECK ENERGY CORPORATION | 891.00 | 11.00 | 365 |
2018 | BECK ENERGY CORPORATION | 672.00 | 20.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | BECK ENERGY CORPORATION | Brine | 970 | 279 |
2014 | BECK ENERGY CORPORATION | Brine | 140 | 365 |
2015 | BECK ENERGY CORPORATION | Brine | 57 | 365 |
2016 | BECK ENERGY CORPORATION | Brine | 33 | 365 |
2017 | BECK ENERGY CORPORATION | Brine | 79 | 365 |
2018 | BECK ENERGY CORPORATION | Brine | 62 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1593211212 | 2012-8-20 0:00: | DD | No Violations | |
0679458895 | 2012-08-20 | Production Wells | No Violations | On the day of my inspection the well was shut in. The pit has not been closed yet. Monroe drilling house was still on site and there was also a frac tank on site. No violations were noted. |
1344596905 | 2012-08-10 | Drill / Deepen / Reopen | No Violations | Inspector on site to witness 4.5 casing being run in and cementing of the production casing. Well was TD @ 2700, and a total of 2651 of new 4.5 production casing was run into the well bore. Due to an equipment failure on one of the cementing trucks the long string cementing procedure was not witnessed. |
1346348019 | 2012-08-30 | Drill / Deepen / Reopen | No Violations | Inspector stopped by frac job for a status check. Universal well services on location and stimulating the 1st stage on this day, I checked the casing annuals and no communication pressure was noticed. |
1372092596 | 2013-06-24 | Preliminary Restoration | Violations Noted | Inspection per request of Carl E Conley found that both drill sites Brown/Conley #1&2 need extensive restoration work due to improper management practices during the initial site excavation. Inadequate methods to save proper amounts of topsoil to reestablish vegetation were not used along with proper erosion and sedimentation control. The Producer Beck Energy must make both locations suitable to establish and hold vegetation along with establishing proper long term erosion control paying attention to; and addressing any areas that are beginning to or already have slipped. ODNR contact- Monroe Co Inspector -Bill Stolarik- 740-507-6592. |
1374676839 | 2013-07-23 | Production Wells | No Violations | On this day I visited the tank battery site and a select energy water truck was on site removing the Brine water from the production tanks. |
1380972536 | 2013-10-05 | Production Wells | No Violations | The location and lease road area has been reclaimed 2 times since the initial violation, With reoccurring slipping along the lease road, I will continue to monitor the area and review the vegetation growth. I have talked with both Ray Beck and Becky Sims and encourage them to take better management practices when building locations. Initial Violation issued was # 1372092596. |
1460647652 | 2016-04-14 | Preliminary Restoration | No Violations | Preliminary Restoration inspection and complaint # 5300 inspection response. Addressing the complaint- On this day it was observed that a earthen slip had occurred in the general area of but not directly on the transportation sale pipeline at a GPS point of EPE 21 -39.60456 X 80.96778, contact was made with both the landowner and Don Coe with Beck Energy and both parties are working together to resolve the issue and both parties understand the issue is beyond the Divisions jurisdiction. Addressing the restoration of the well site. The well site meets ORC 1509.072 with vegetation and erosion control established. 2-100 barrel production tanks are present in an established dike along with a mechanical separator and gas sales meter with a current sales chart present. Proper well identification is posted and the production area is shared between the 2 wells present on the lease - the Brown Conley # 1 & #2. |
1593211212 | 2012-08-20 | Drill / Deepen / Reopen | No Violations | Inspection of drill site found the drilling pit filled and the well bore completed and waiting on the final completion process. Inspector will note that suggestion was made to Ray Beck in concern to the silt run off into the stream bed that the lease road crosses. |
1877525989 | 2013-11-06 | Preliminary Restoration | No Violations | Compliance agreement # 1372092596 was resolved on this day, top soil has been brought in and erosion control is in place, vegetation is beginning to be established and I will re inspect after ample time has been given to proper monitor vegetation growth and long term erosion control. |
679458895 | 2012-8-20 0:00: | PW | No Violations | 0.50 |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1372092596 | US-OH-110996 | 2013-11-06 | Failure to restore land surface within 9 mos. (CHANGE) (REPLACE) |
For data sources see[9]