34-111-24347

Well Details

Well ID: 34-111-24347
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: TRIAD HUNTER LLC
Well Pad ID: US-OH-000561
Farm/Lease Name: ORMET
License Status: Producing
License Date: 2012-07-05
Spud Date: 2012-10-04
Spud Drilling Contractor: WARREN DRLG
Final Drill Date: 2012-12-08
Well Total Depth: 10063.00 ft
Configuration: Horizontal
Latitude: 39.710000
Longitude: -80.830000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-07-05 Proposed Formations:MARCELLUS SHALE, Issued Date:7/5/2012, Expired Date:7/5/2014 12:00:00 PM, Drilling unit acres:455.858, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2012-12-08
Correction to Well 2013-02-15 CORRECTION TO TARGET & SURFACE INFORMATION (FOOTAGE & X,Y COORDINATES), FROM AS DRILLED SURVEY. UNIT SIZE CHANGED TO 484 ACRES.
Correction to Well 2013-04-05 UNIT SIZE CHANGED TO 528.30 ACRES.
Completion Report Received 2014-01-03
Construction Permit Expires 2014-07-05
Record Last Modified 2017-02-10

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-01-21 6606 9926 0
6606 9926 0
6606 9926 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-08-29 H2O 8 8160 Bbl 436300 Halliburton STAGE 11

72 SHOTS

2013-08-26 H2O 8 7639 Bbl 439400 Halliburton STAGE 7

72 SHOTS

2013-08-23 H2O 8 8062 Bbl 439500 Halliburton STAGE 5

72 SHOTS

2013-08-30 H2O 8 8298 Bbl 438100 Halliburton STAGE 13

72 SHOTS

2013-08-30 H2O 8 8188 Bbl 444100 Halliburton STAGE 14

72 SHOTS

2013-08-15 H2O 8 7618 Bbl 435000 Halliburton STAGE 1

72 SHOTS

2013-08-29 H2O 8 8013 Bbl 455200 Halliburton STAGE 10

72 SHOTS

2013-08-22 H2O 8 8073 Bbl 4495 Halliburton STAGE 3

72 SHOTS

2013-08-29 H2O 8 7699 Bbl 435000 Halliburton STAGE 12

72 SHOTS

2013-08-27 H2O 8 7772 Bbl 410600 Halliburton STAGE 8

72 SHOTS

2013-08-20 H2O 8 8811 Bbl 439500 Halliburton STAGE 2

72 SHOTS

2013-08-23 H2O 8 8032 Bbl 451800 Halliburton STAGE 4

72 SHOTS

2013-08-28 H2O 8 8237 Bbl 459200 Halliburton STAGE 9

72 SHOTS

2013-08-26 H2O 8 7817 Bbl 441400 Halliburton STAGE 6

72 SHOTS

2013-08-20 H2O 8 8811 Bbl 439500 Producers Service Corporation

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 TRIAD HUNTER LLC 0 1446 5
2014 TRIAD HUNTER LLC 454482 25821 271
2015 TRIAD HUNTER LLC 442895 10705 357
2016 TRIAD HUNTER LLC 330334 5154 367
2017 TRIAD HUNTER LLC 266963 3579 365
2018 TRIAD HUNTER LLC 243177 2443 364
2019 TRIAD HUNTER LLC 52981 461 90

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 TRIAD HUNTER LLC Brine 0 5
2014 TRIAD HUNTER LLC Brine 19939 271
2015 TRIAD HUNTER LLC Brine 5165 357
2016 TRIAD HUNTER LLC Brine 4283 367
2017 TRIAD HUNTER LLC Brine 4342 365
2018 TRIAD HUNTER LLC Brine 2630 364
2019 TRIAD HUNTER LLC Brine 464 90

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1126295140 2018-4-12 0:00: PW No Violations 0.30
-1232946617 2012-12-10 0:00 DD No Violations
-1864138782 2018-11-13 0:00 PW No Violations 0.20
-454485326 2012-11-14 0:00 DD No Violations
-617481825 2012-12-6 0:00: DD No Violations
-625773594 2012-11-19 0:00 DD No Violations
0454485326 2012-11-14 Drill / Deepen / Reopen No Violations Status check on drilling progress found the current drilling depth to be 145 using a 17.5 bit and the company looking to set the 13.375 surface pipe sometime in the next 24 hours.
0617481825 2012-12-06 Drill / Deepen / Reopen No Violations Notification was made to inspector that the stuck drill string had been recovered and the bore hole properly conditioned with the company preparing to run the 5.5 production casing into the bore hole. Company representative indicated that they intended to cement the casing in a single stage process and not 2 stage the job, Company did add a Gas Blocker to the lead cement to avoid any potential problems per conversation with inspector.
0625773594 2012-11-19 Drill / Deepen / Reopen No Violations Inspector on drill site for a status update of the drilling process. 2734 of 9.625 casing was ran on 11/18/12 with cement returns to surface. Drilling company in the process of hooking up the Blow Out Preventer with the drilling prognosis to drill on Air to the top of the curve and then switch of Oil Based Mud for the rest of the drilling procedure.
1126295140 2018-04-12 Production Wells No Violations Status check inspection found the well head production valves in the open position with annular pressure monitoring in place. There is activity around the well pad supporting a second pad adjoining the well pad the said well is on. The company has submitted a simultaneous operations plan that indicated they will put a cage over the wells and establish a perimeter around the wells with barricades in place. Both are being followed out. The well produced into a midstream operation on a nearby pad.
1146396302 2014-09-09 Preliminary Restoration No Violations On the day of my inspection accompanied by ODNR staff and Production Supervisor Rodney Boron, I witnessed that the well was equipped with Cameron casing and tubing wellheads along with a Christmas tree valve assembly and a sand trap controlled manually to a 300bbl frac tank in containment. Production equipment included a GPS Unit, a compressor unit, dehydrator unit, and a fuel skid. Tank battery consisted of 8-500bbl tanks and 2 let down towers all within containment. Also on site were 4 combustors and a pig launcher. The site passed preliminary restoration according to ORC 1509.072A.
1232946617 2012-12-10 Drill / Deepen / Reopen No Violations Well was completed on 12/08/12 with the company providing a copy of the cement ticket to the inspector with verbal compliance that the 5.5 long string cement job went good with 15 Barrels of cement returns to surface.
1246821545 2012-11-30 Drill / Deepen / Reopen No Violations Status check on drilling progress found the current drilling depth to be 8,121 and the company currently pulled out of the hole with the drill string for a bit change, estimated total completion depth to be 10,100.
1349402473 2012-10-04 Drill / Deepen / Reopen No Violations Well was spudded on this day, 10-04-2012, with 70 of 20 comductor being set and cemented to surface.
1352890676 2012-11-12 Drill / Deepen / Reopen No Violations Notification was received on this day by phone that Warren Drilling Rig # 12 was rigged up and should be drilling by mid week.
1353947757 2012-11-26 Drill / Deepen / Reopen No Violations Inspection found the current drilling depth to be 5324 using a 8.750 Varrell bit and starting to build their curve. The switch was made to oil base drilling mud @ 4882 with a total proposed depth to be reached of approximately 10,220.
1354636202 2012-12-04 Drill / Deepen / Reopen No Violations Inspection and status check of drill site found that the well bore has been completed with a total depth reached of 10,063. With the drill string currently stuck in the hole @ 4947 in the vertical section, company is currently in the process of retrieving the stuck drill string.
1377041945 2013-08-20 Completion Testing No Violations Status check on the stimulation process to observe the 2nd stage to be stimulated with a solid composite 12,000 psi bridge plug set at 9,679 and 72 perforations staggered out in 5 different bursts of 6 shots in 12 using 3 hollow steel carriers between 9,479 and 9,650, with 2000 gl of 7.5% HCL used and a break pressure of 5892 and average treatment pressure of 6324 psi and rate of 80.6 barrels per minuite and shut in pressure of 4,480 psi. The annular pressure is being monitored electronically.
1410364324 2014-09-09 Production Wells No Violations The southeast meeting was held at the site. The well is a producing well with a large Texas well head. We looked at the process from the well head to the midstream line. Facility is in compliance with 1509 and 1501:9-9-05.
1455801350 2016-02-18 Preliminary Restoration No Violations Preliminary Restoration status check inspection fund the area affected by the initial well pad construction does have vegetation and erosion control established. There is a fresh water impoundment in place adjacent to the drilling pad. A separate production facility is located near the well pad, this facility will service multiple well pads in the direct area owned by the current registered owner (Triad). Documenting the well head - the well head is complete with the tubing production valve in the open position. There is a hydraulic emergency shut down device located in the production tree outlet. The company has annular pressure gauges on all annulis sections of the well head and the company has a authorized representative periodically checking and documenting all annuli pressures. Addressing the production facility- A total of (8) 400 barrel production tanks are located inside a polymer lined metal containment dike area with (2) low pressure vapor recover units also present inside the dike area. A (6) station commercial tank load out facility is located on the production pad along with a naturel gas compressor and gas processing equipment.
1466500552 2012-11-15 Drill / Deepen / Reopen No Violations On the day of my inspection Warren Rig 12 had drilled to 525 with a 17.5 bit and ran 13.375 pipe to 509. Express ran the casing and BJ was cementing. See casing ticket. No violations noted.
1503406631 2017-08-22 Production Wells No Violations Producing well status check inspection found the well equipped with a casing and tubing well head and a 2 production sales line set up to sell product off the tubing well head. The sales line has a hydraulic Emergency Shut Down with no electrically controlled actuation solenoid. The well head is leaking gas from the B-section between the 9.625 & 13.375. On site was Triad Production Foreman Derik Higgins who was informed to install flow lines and pressure relief valves on all well annulis. Mr. Higgins was informed that the gas was not to dispersed into the atmosphere and a permanent recovery system must be installed. The well head assembly gauge showed 900 psi at surface.
1652875164 2013-12-12 Completion Testing No Violations Status check inspection found the well has had the completion plugs drilled out and tubing has been run and set in the well bore, Contractors are on site and hooked up to begin the testing of the well today. On a pass through visit on 12/09/13 I witness the 500 barrel portable storage tanks to be used in the completion had no grounding wirers, I addressed this verbally with the company man on site and the issue has been taken care of.
1864138782 2018-11-13 Production Wells No Violations On site inspection found 3 wells on the well pad with all 3 being Marcellus shale wells. The wells are equipped with artificial lift technologies and producing off the production tubing. The 5.5 diameter production casing pressure is 200 pounds per square inch (psi). There is a riser pipe on the 9.625 well head section with 1,100 psi present. Proper well identification is posted and there is an additional well pad between the 3 wells and the production facility. The production fluid storage facility has been reduced to (3) 500 barrel tanks situated inside a polymer lined steel containment dike area.
2136554905 2013-12-12 Completion Testing No Violations Company is having a contractor named Fesco to hook up flow back equipment up and flare well.

For data sources see[9]