34-111-24236

Well Details

Well ID: 34-111-24236
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Center Township
Operator Name: BECK ENERGY CORPORATION
Well Pad ID:
Farm/Lease Name: VILLAGE OF WOODSFIELD
License Status: Producing
License Date: 2009-01-07
Spud Date: 2009-01-12
Spud Drilling Contractor: MONROE DRILLING OPERATION, LLC
Final Drill Date: 2009-01-15
Well Total Depth: 2650.00 ft
Configuration: Vertical
Latitude: 39.760000
Longitude: -81.120000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2009-01-07 Proposed Formations:BEREA/30 FOOT/GORDON, Issued Date:1/7/2009, Expired Date:1/7/2010 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2009-01-15
Completion Report Received 2009-04-30
Construction Permit Expires 2010-01-07
Record Last Modified 2015-09-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2009-08-27 2044 2056 25
2009-08-27 2300 2360 37
2044 2056 25
2300 2360 37
2460 2470 31
2044 2056 25
2009-08-27 2460 2470 31

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 240000 Gal 0 3 STAGE FRAC

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2009 BECK ENERGY CORPORATION 1402.00 153.00 365
2010 BECK ENERGY CORPORATION 1040.00 147.00 365
2011 BECK ENERGY CORPORATION 480.00 52.00 365
2012 BECK ENERGY CORPORATION 414.00 55.00 366
2013 BECK ENERGY CORPORATION 226.00 56.00 365
2014 BECK ENERGY CORPORATION 209.00 33.00 365
2015 BECK ENERGY CORPORATION 207.00 26.00 365
2016 BECK ENERGY CORPORATION 172.00 30.00 365
2017 BECK ENERGY CORPORATION 139.00 31.00 365
2018 BECK ENERGY CORPORATION 143.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2009 BECK ENERGY CORPORATION Brine 450 365
2010 BECK ENERGY CORPORATION Brine 431 365
2011 BECK ENERGY CORPORATION Brine 123 365
2012 BECK ENERGY CORPORATION Brine 124 366
2013 BECK ENERGY CORPORATION Brine 114 365
2014 BECK ENERGY CORPORATION Brine 54 365
2015 BECK ENERGY CORPORATION Brine 63 365
2016 BECK ENERGY CORPORATION Brine 57 365
2017 BECK ENERGY CORPORATION Brine 56 365
2018 BECK ENERGY CORPORATION Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1782368914 2020-6-15 0:00: PW No Violations 0.80
-872197458 2010-6-3 0:00:0 UL No Violations 1.00
-913563271 2012-7-16 0:00: PW No Violations
-989776666 2018-4-25 0:00: UP No Violations 0.70
0113123436 2009-01-14 Drill / Deepen / Reopen No Violations STOPPED BY DRILL RIG AND RIG WAS AT 2070AND WAS DRILLING TO 2650.
0872197458 2010-06-03 UrbanPreliminary Restoration Violations Noted On day of inspection with Dan Goins on site we concluded that all bare areas need to be limed and reseeded and mulched. My suggestion is to bring track hoe in and to pull un compacted soil that is moving and ad a French drain on slip area. Place barbed wire around chain link panels at well. Place the cable gate back at the Y in the road. Then place large sign with large letters at cable gate. Use a grass seed that is more dense in coverage and with a deep root system. Notify me as soon as possible if you have any questions.
0913563271 2012-07-16 Production Wells No Violations Inspection of the well head found the following equipment, 4.5 production casing, 1.5 tubing& rods with the production valves open and the well being produced by the means of a pumping unit. A single 100 barrel tank along with a separator and gas meter are present in an established dike area with proper well identification present . Inspector will note that both the well site and fluid storage area are in a fenced and locked enclosure.
0989776666 2018-04-25 UrbanProduction Wells No Violations Status check inspection found the well equipped with 4.5 diameter production casing and 1.900 diameter production tubing. The casing and tubing well heads are equipped with valves and flow lines with the production valves in the open position and the well is set up to be produced by the means of a pumping unit. There is a fence around the well head and identification is posted. The production facility a single 100 barrel production tank is present along with a mechanical separator and gas sales meter with a current sales chart present in the meter. There is a earthen dike present around the production facility with a drain line in the dike to allow surface water to be released. There is a fence around the dike area that has proper well identification posted.
113123436 2009-1-14 0:00: DD No Violations
1232115193 2009-01-08 Surface Facility Construction No Violations KERRY WITH MONROE AND I ARE AT THE PROPOSED SITE OF BECKS NEW WOODSFIELD WELL.WE ARE CUTTING LOCATION ACCORDING TO WERE THE PRESITE WAS EXECUTED AS WELLAS LEASE RD.AND APRON FROM RD.WE HIT A SPRING ON LOCATION AND ROCK.KERRY AND I WORKED ON WHERE DRAIN DITCHES WILL BE INSTALLED.KERRY DOZED SOME ROCK DOWN ON LOCATION.TO HELP SEAL WATER OFF.WILL WORK ON FRIDAY FINISHING DIRT WORK.I WILL STOP BACK AND INSPECT TOMMARROW.
1232120916 2009-01-09 Surface Facility Construction No Violations KERRY RAN DOZER TO TOP AND BROKE UP ROCK AND COMPACTED IT IN WITH DIRT.TRENCH OR DIVERSION DITCH WAS PUT IN PLACE WHER A CULVERT WAS PLACED.ANOTHER CULVERT WAS PLACED IN THE LEASE RD WHERE WATER WAS MAKING A WET SPOT.WILL MOVE RIG IN AND START CONDUCTER MONDAY.SILT FENCE WAS PUT INTO PLACE.
1232738295 2009-01-13 Drill / Deepen / Reopen No Violations FILL UP ALL VOIDS WITH FLUID AND PRESSURE TEST TO 500PSI.PRESSURE WAS LEAKING AT FLANGE.TIGHTEN BOLTS.TRIED 2ND TIME WAS LEAKING STILL.TAKE APART AND CLEAN FLAGES AND STEEL RING.TRIED 3RD TIME .HELD 500PSI FOR 15 MIN.NO LEAKS AT RUBBER BLADDER AND OR AT CHOKE VALVE.START RUNNING PIPE IN .WILL CHECK BACK ON 1-14-09.
1285675441 2010-09-27 UrbanPreliminary Restoration No Violations On day of inspection well is supplied with pump jack and a 7casing and 4.5casing. There is a mandrel well head and 1.5tubing.There is a 100bbl tank. The dike and id are in place. There is 90%vegetation on the site. Preliminary restoration passed.
1292524697 2010-12-16 UrbanPreliminary Restoration No Violations Well is compliant under ORC1509.Preliminary restoration passed.
1393337394 2014-02-25 Preliminary Restoration No Violations Preliminary Restoration found the well site and production fluid storage area meets 1509.072. Inspection of the well head found the following equipment present 4.5-1.5 tubing and pumping rods with the production valves open and the well set up to be produced by the means of a pumping unit, A single 100 barrel production tank is present along with a mechanical separator and gas sales meter with proper well identification present, all equipment is located in fenced in enclosures.
1588288382 2009-01-26 Completion Testing No Violations FIRST STAGE WAS FRACED, ACID WAS SPOTTED WITH TUBING.SECOND STAGE WILL BE DONE WHEN THE ICE IS THAWED FROM LINE.WATER IS FED WITH FLOW PLASTIC FLOWLINE AND A CITY WATER HYDRANT.WILL STOP BACK LATER FOR REST OF JOB.WILL DO ALL THREE STAGES ON 1-26-2009.
1614143133 2009-03-12 Production Wells No Violations THE WELL IS SUPPLIED WITH A PUMP JACK AND 100BBL TANK.WHEN SETTING SITE UP THE GROUND HAS SLIPPED ABOVE WELL.BECK ENERGY HAS REMOVED CULVERT AND THE SPRING HAS OPENED UP.A SLIP HAS FORMED.I TOLD RAY TO GET IN AND PUT A FRENCH DRAIN IN AND MAKE SURE THAT THERE IS A DRAIN.BECKY TOLD ME THAT THEY WERE GOING TO PLANT PINE AT UPPER END OF SITE.
1976314145 2010-05-14 UrbanPreliminary Restoration Violations Noted Well is supplied with a drake pump jack and a 100bl tank. There are 7casing,4.5casing and 1.5tubing.Dike and id are inplace.There needs to be vegetation established in several areas. There is a slip starting by the well. Met with Becky Simms on the issue. Matt Longwell will be notified. Restoration did not pass. Will check at later date.

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0872197458 US-OH-129932 2010-06-03 ID (a-i)
0872197458 US-OH-129933 2010-06-03 Failure to restore land surface within 9 mos.
1976314145 US-OH-119974 2010-05-21 Failure to restore land surface within 9 mos.

For data sources see[9]

References