If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-105-23717 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":38.94,"lon":-81.78,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Meigs | |
Municipality: Lebanon Township | |
Operator Name: J D DRILLING COMPANY | |
Well Pad ID: | |
Farm/Lease Name: ROSCOE MILLS | |
License Status: Producing | |
License Date: 2013-05-24 | |
Spud Date: 2013-09-30 | |
Spud Drilling Contractor: CO TOOLS | |
Final Drill Date: 2013-10-03 | |
Well Total Depth: 2161.00 ft | |
Configuration: Vertical | |
Latitude: 38.940000 | |
Longitude: -81.780000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-05-24 | Proposed Formations:BEREA, Issued Date:5/24/2013, Expired Date:5/24/2015 12:00:00 PM, Drilling unit acres:181.7, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2013-10-03 | Frac Focus Box Clicked not found on website |
Completion Report Received | 2014-02-07 | Frac Focus Box Clicked not found on website |
Construction Permit Expires | 2015-05-24 | Frac Focus Box Clicked not found on website |
Record Last Modified | 2017-02-15 | Frac Focus Box Clicked not found on website |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-02-10 | 2183 | 2186 | 13 |
2183 | 2186 | 13 | |
2183 | 2186 | 13 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-10-11 | H2O | 15 | 1387 Bbl | 34000 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | J D DRILLING COMPANY | 0.00 | 220.00 | 74 |
2015 | J D DRILLING COMPANY | 0.00 | 553.00 | 365 |
2016 | J D DRILLING COMPANY | 0.00 | 517.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | J D DRILLING COMPANY | Brine | 0 | 74 |
2015 | J D DRILLING COMPANY | Brine | 0 | 365 |
2016 | J D DRILLING COMPANY | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1805094385 | 2019-5-21 0:00: | PW | No Violations | 0.70 |
-323662738 | 2014-9-25 0:00: | PW | No Violations | 0.30 |
0057520733 | 2014-06-30 | Production Wells | No Violations | No violations. |
0323662738 | 2014-09-25 | Production Wells | No Violations | No noted violations. |
1133070186 | 2014-06-24 | Preliminary Restoration | No Violations | Restoration requirments met. |
1380289422 | 2013-09-27 | Drill / Deepen / Reopen | No Violations | Building location and moving rig onto site for 34-105-2-3717. I had original showed up for the frac job on the Mills #7, but the job had been canceled and I was not informed until I arrived. |
1380593285 | 2013-09-30 | Drill / Deepen / Reopen | No Violations | Witnessed 300 feet of new 17 lb/ft 7 surface casing set in 310 feet of 8 7/8 borehole with 65 sacks of Class A cement. Circulation established and Good cement returns stayed at the surface. Surface casing pressure tested at 800 psi for the required amount of time. |
1381501659 | 2013-10-11 | Completion Testing | No Violations | Witnessed partial hydraulic frac job. Berea Sandstone was perforated from 2083-2086 feet with 13 shots. Top of cement on Backside of production casing was logged at 1448 feet. Formation Breakdown pressure was 1451 psi and average rate will be roughly 5 Barrels per minute. |
57520733 | 2014-6-30 0:00: | PW | No Violations | 0.20 |
For data sources see[9]