If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-105-23694 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.17,"lon":-82.26,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Meigs | |
Municipality: Columbia Township | |
Operator Name: BANCEQUITY PETROLEUM CORPORATI | |
Well Pad ID: | |
Farm/Lease Name: BURKE MILLARD | |
License Status: Producing | |
License Date: 2012-01-18 | |
Spud Date: 2012-02-13 | |
Spud Drilling Contractor: BOWMAN DRILLING | |
Final Drill Date: 2012-02-16 | |
Well Total Depth: 1460.00 ft | |
Configuration: Vertical | |
Latitude: 39.170000 | |
Longitude: -82.260000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-01-18 | Proposed Formations:BEREA, Issued Date:1/18/2012, Expired Date:1/17/2014 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2012-01-27 | CORRECTION TO FOOTAGE, SHOULD BE 340'NL & 300'EL OF W HALF, FRAC. 23. |
Reached Total Depth | 2012-02-16 | |
Completion Report Received | 2013-04-02 | |
Construction Permit Expires | 2014-01-17 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-04-03 | 1291 | 1299 | 9 |
1291 | 1299 | 9 | |
1291 | 1299 | 9 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-02-25 | H2O | 0 | 38813 Gal | 17000 | Producers Service Corporation | Witnessed partial hydrolic fracturing job. Witnessed Breakdown and half of treatment. Did not witness shut-in. records received from producers. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | BANCEQUITY PETROLEUM CORPORATI | 0.00 | 0.00 | 0 |
2012 | BANCEQUITY PETROLEUM CORPORATI | 0.00 | 0.00 | 0 |
2013 | BANCEQUITY PETROLEUM CORPORATI | 1292.00 | 149.00 | 306 |
2014 | BANCEQUITY PETROLEUM CORPORATI | 2112.00 | 142.00 | 365 |
2015 | BANCEQUITY PETROLEUM CORPORATI | 2185.00 | 155.00 | 365 |
2016 | BANCEQUITY PETROLEUM CORPORATI | 2876.00 | 222.00 | 365 |
2017 | BANCEQUITY PETROLEUM CORPORATI | 2498.00 | 150.00 | 365 |
2018 | BANCEQUITY PETROLEUM CORPORATI | 602.00 | 76.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | BANCEQUITY PETROLEUM CORPORATI | Brine | 0 | |
2012 | BANCEQUITY PETROLEUM CORPORATI | Brine | 0 | 0 |
2013 | BANCEQUITY PETROLEUM CORPORATI | Brine | 1375 | 306 |
2014 | BANCEQUITY PETROLEUM CORPORATI | Brine | 17560 | 365 |
2015 | BANCEQUITY PETROLEUM CORPORATI | Brine | 17003 | 365 |
2016 | BANCEQUITY PETROLEUM CORPORATI | Brine | 1354 | 365 |
2017 | BANCEQUITY PETROLEUM CORPORATI | Brine | 1357 | 365 |
2018 | BANCEQUITY PETROLEUM CORPORATI | Brine | 4185 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1747152577 | 2012-7-6 0:00:0 | AM | No Violations | 0.80 |
1328633821 | 2012-02-07 | Administrative Inspection | No Violations | I received a call from Mike McPeak of Bancequity letting me know they are building the site for the Millard Burke 2. |
1329144732 | 2012-02-13 | Drill / Deepen / Reopen | No Violations | Dow Bowman Drilling is moving the rig onto the location today. |
1329327494 | 2012-02-15 | Drill / Deepen / Reopen | No Violations | Surface cement job. 966 of new 7 surface casing was set in 980 of 8 3/4 borehole with 150 sacks of class A cement with 1 gel. Circulation was established and good cement returns were seen. After the pump was shut down the cement top dropped roughly 40 so the cement was allowed to set up for 20 minutes and was then topped off with 18 more sacks on the backside of the surface casing. |
1361815397 | 2013-02-25 | Completion Testing | No Violations | Witnessed partial hydraulic fracturing operation. Formation breakdown was 1500 psi, average rate was 3 barrels per minute, and average pressure was 1000 psi. Berea sandstone perforated from 1299-1291 feet with 9 shots. |
1747152577 | 2012-07-06 | Administrative Inspection | No Violations | Spoke with Mike McPeak at lease road to ask about status of well. Well has not been completed. Logging operations are being done on property and are currently using lease road. |
1796932097 | 2013-08-14 | Preliminary Restoration | No Violations | Pumping unit in operation at time of inspection. Good vegetative cover, pits closed, no erosion at well site no drilling equipment on site. There is sedimentation from the lease road that has made its way into the creek along the lease road. The road has vegetative cover and the sedimentation appears to have been deposited in the past. |
For data sources see[9]