If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-105-23690 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.14,"lon":-81.92,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Meigs | |
Municipality: Orange Township | |
Operator Name: DURST OIL & GAS INC | |
Well Pad ID: | |
Farm/Lease Name: CALAWAY EVERETT | |
License Status: Producing | |
License Date: 2011-11-02 | |
Spud Date: 2011-11-17 | |
Spud Drilling Contractor: MONROE DRILLING OPERATION, LLC | |
Final Drill Date: 2011-12-01 | |
Well Total Depth: 1850.00 ft | |
Configuration: Vertical | |
Latitude: 39.140000 | |
Longitude: -81.920000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-11-02 | Proposed Formations:BEREA SANDSTONE, Issued Date:11/2/2011, Expired Date:11/1/2013 12:00:00 PM, Drilling unit acres:10, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2011-12-01 | CHANGED WELL TYPE FROM AD TO TAAD ON 7/24/2017 BASED ON CHEIFS ORDER 2017-183| |
Completion Report Received | 2013-03-15 | CHANGED WELL TYPE FROM AD TO TAAD ON 7/24/2017 BASED ON CHEIFS ORDER 2017-183| |
Construction Permit Expires | 2013-11-01 | CHANGED WELL TYPE FROM AD TO TAAD ON 7/24/2017 BASED ON CHEIFS ORDER 2017-183| |
Revocation | 2017-06-20 | CHANGED WELL TYPE FROM AD TO TAAD ON 7/24/2017 BASED ON CHEIFS ORDER 2017-183| |
Last Compliance Report | 2017-08-21 | CHANGED WELL TYPE FROM AD TO TAAD ON 7/24/2017 BASED ON CHEIFS ORDER 2017-183| |
Record Last Modified | 2017-10-24 | CHANGED WELL TYPE FROM AD TO TAAD ON 7/24/2017 BASED ON CHEIFS ORDER 2017-183| |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
0 | 0 | 0 | ||||
2012-01-12 | H2O | 15 | 37735 Gal | 24400 | Universal Well Services Inc. |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | DURST OIL & GAS INC | 1338.00 | 345.00 | 350 |
2013 | DURST OIL & GAS INC | 1810.00 | 219.00 | 365 |
2014 | DURST OIL & GAS INC | 953.00 | 147.00 | 360 |
2015 | DURST OIL & GAS INC | 1013.00 | 139.00 | 360 |
2016 | DURST OIL & GAS INC | 941.00 | 63.00 | 360 |
2017 | DURST OIL & GAS INC | 410.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | DURST OIL & GAS INC | Brine | 700 | 350 |
2013 | DURST OIL & GAS INC | Brine | 660 | 365 |
2014 | DURST OIL & GAS INC | Brine | 588 | 360 |
2015 | DURST OIL & GAS INC | Brine | 480 | 360 |
2016 | DURST OIL & GAS INC | Brine | 383 | 360 |
2017 | DURST OIL & GAS INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1303889073 | 2012-1-12 0:00: | DD | No Violations | |
-194859755 | 2012-1-27 0:00: | PW | No Violations | 0.50 |
-2122968776 | 2011-11-14 0:00 | DD | No Violations | 0.50 |
-33790702 | 2020-9-3 0:00:0 | AD | No Violations | 2.00 |
-80904250 | 2012-5-21 0:00: | PL | No Violations | 0.50 |
0080904250 | 2012-05-21 | Preliminary Restoration | Violations Noted | The requirements for the preliminary restoration had not been met. Area affected by drilling shall be graded, reseeded and mulched, and steps shall be taken to encourage vegetative cover in all areas not essential to production in order to prevent substantial erosion. |
0101651998 | 2017-07-20 | Production Wells | No Violations | This well is properly identified now. Well is equipped with a pumping unit, tubing, rods and electric motor. The well shares a tank battery with the Everett #2 well. Tank battery consists of 3-100 barrels and a knockout. |
0194859755 | 2012-01-27 | Production Wells | No Violations | This well is equipped with a gasoline engine and a pumping unit. The tank battery is equipped with three 100 barrel tanks and a water knock-out tank. The drilling pits have not been closed. |
0381080903 | 2012-06-11 | Preliminary Restoration | No Violations | Area graded, seeded and mulched, no erosion, pits closed. |
101651998 | 2017-7-20 0:00: | PW | No Violations | 0.50 |
1303889073 | 2012-01-12 | Drill / Deepen / Reopen | No Violations | Witnessed well stimulation. Hydro Frac. |
1321455354 | 2011-11-16 | Drill / Deepen / Reopen | No Violations | Well has not been spudded yet. Received phone call from Kerry Brown, he let me know they will be spuding well Thursday. |
1321542290 | 2011-11-17 | Drill / Deepen / Reopen | No Violations | Moving onto location spud later today. |
1322074676 | 2011-11-23 | Drill / Deepen / Reopen | No Violations | Accompanied J. Scott on AD Fresh Water Test. 353 minimum psi. They pressured up to 390 and lost 10 psi over the 15 minute test period. Test passed. |
1322577012 | 2011-11-29 | Drill / Deepen / Reopen | No Violations | Not drilling today. BOP has been placed on well, have not begun drilling production borehole yet. Pit holding water effectively. |
1323276254 | 2011-11-23 | Annular Disposal | No Violations | Annular Disposal Mechanical Integrity Test (Fresh Water Test). 701 feet of 8 5/8 surface casing. Minimum test pressure 354 psi. First test failed due to leak between 8 5/8 collar and swedge. Leak corrected. Second test 390 psi for 15 minutes. After 15 minutes pressure at 380 psi. Test passed. Accompanied by Josh Garland MRI 1. |
1325917728 | 2011-11-18 | Drill / Deepen / Reopen | No Violations | 701 feet of used 8 5/8 inch surfaces casing set in 720 feet of 11 inch borehole with 264 sacks class A, 500 lb gel, 800 lb accelerator, and 2 quarts of polymer. Circulation established, good cement returns stayed at surface. |
1329236824 | 2012-02-14 | Preliminary Restoration | No Violations | The pit has been closed for the two month preliminary restoration requirements. I also met with Jon Scott to check on the Annular Disposal requirements for the well. |
1522510451 | 2012-02-14 | Annular Disposal | No Violations | Annular Disposal Interim Authorization Inspection. Annular Disposal (AD) Connections are liquid tight. Ad connection at wellhead is accessible. Permit number is displayed at the wellhead. Identification is displayed on 100 barrel steel tank located with-in earthen dike. Photos were taken. |
2122968776 | 2011-11-14 | Drill / Deepen / Reopen | No Violations | Pad construction inspection. |
381080903 | 2012-6-11 0:00: | PL | No Violations | 0.50 |
428992445 | 2020-7-29 0:00: | AD | No Violations | 2.00 |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0080904250 | US-OH-129207 | 2012-05-21 | Failure to restore within six months |
For data sources see[8]