If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-105-23674 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":38.99,"lon":-82.08,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Meigs | |
Municipality: Salisbury Township | |
Operator Name: AMERICAN NATURAL GAS INC | |
Well Pad ID: | |
Farm/Lease Name: SHEETS | |
License Status: Producing | |
License Date: 2011-03-02 | |
Spud Date: 2011-03-25 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2011-06-02 | |
Well Total Depth: 669.00 ft | |
Configuration: Vertical | |
Latitude: 38.990000 | |
Longitude: -82.080000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-03-02 | Proposed Formations:COW RUN, Issued Date:3/2/2011, Expired Date:3/1/2013 12:00:00 PM, Drilling unit acres:107, Proposed Well Type:OG, Proposed Well Class:ESPW |
Reached Total Depth | 2011-06-02 | |
Completion Report Received | 2011-07-26 | |
Construction Permit Expires | 2013-03-01 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2011-10-03 | 631 | 634 | 10 |
631 | 634 | 10 | |
631 | 634 | 10 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2011-06-17 | H2O | 15 | 242 Bbl | 15000 | Universal Well Services Inc. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | AMERICAN NATURAL GAS INC | 0.00 | 0.00 | 0 |
2012 | AMERICAN NATURAL GAS INC | 0.00 | 0.00 | 0 |
2014 | AMERICAN NATURAL GAS INC | 0.00 | 0.00 | 0 |
2015 | AMERICAN NATURAL GAS INC | 0.00 | 0.00 | 0 |
2016 | AMERICAN NATURAL GAS INC | 0.00 | 0.00 | 0 |
2017 | AMERICAN NATURAL GAS INC | 0.00 | 0.00 | 0 |
2018 | AMERICAN NATURAL GAS INC | 0.00 | 0.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | AMERICAN NATURAL GAS INC | Brine | 0 | 0 |
2012 | AMERICAN NATURAL GAS INC | Brine | 0 | 0 |
2014 | AMERICAN NATURAL GAS INC | Brine | 0 | 0 |
2015 | AMERICAN NATURAL GAS INC | Brine | 0 | 0 |
2016 | AMERICAN NATURAL GAS INC | Brine | 0 | 0 |
2017 | AMERICAN NATURAL GAS INC | Brine | 0 | 0 |
2018 | AMERICAN NATURAL GAS INC | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1335058109 | 2011-5-26 0:00: | DD | No Violations | 4.00 |
-1457221030 | 2011-5-26 0:00: | DD | No Violations | |
-2054020700 | 2011-5-26 0:00: | DD | No Violations | |
-345336365 | 2011-5-31 0:00: | DD | No Violations | |
0103974036 | 2011-07-21 | Preliminary Restoration | No Violations | Pits filed and no drilling equipment left on site. Frac tank on site. Spoke with Bob Adams of ANG and suggested removing tank. |
0194161178 | 2012-05-21 | Preliminary Restoration | No Violations | Area around well has been graded and disked, but no seeds has been spread. Areas along road still need graded. I spoke with BJ Daniel of American Natural Gas about completing the restorations. |
0344376173 | 2012-04-13 | Preliminary Restoration | No Violations | Area around well not graded, a large pile remain on site. Vegetative cover has not been established. All areas not essential to production shall be graded and vegetative cover shall be established in order to prevent erosion. |
0345336365 | 2011-05-31 | Drill / Deepen / Reopen | No Violations | Surface casing has been grouted back to surface. 3 yards of 9 sack grout was used. |
103974036 | 2011-7-21 0:00: | PL | No Violations | 1.50 |
1308746386 | 2011-06-17 | Drill / Deepen / Reopen | No Violations | Witnessed frac job with Josh Garland and Jon Scott. |
1308860387 | 2011-06-17 | Completion Testing | No Violations | Witnessed Universal well services perform a frac job. 631-634 second cow run, 10 shots over 3 feet. 15000 lbs of sand, 242 bbl water, ISIP=540 psi, Breakdown=2491 psi. |
1335058109 | 2011-05-26 | Drill / Deepen / Reopen | No Violations | Witnessed cementing of surface casing. 250 of 7 casing in 289 of 8.75 borehole. 87 sacks of class A (50% excess) with 300 lbs. gel, 100 lb. accelerator, and 90 lbs. LCM. Circulation established but no cement returns seem only gel. Fluid level dropped after all cement had been pumped in. one more bag of cotton seed hulls and another 36 sacks were used to top of the casing. Fluid level continued to drop. Allowed cement to set over night and 3 yards of 9 sack concrete were used to top off the casing the next day. |
1347717540 | 2011-06-17 | Drill / Deepen / Reopen | No Violations | Frack Job inspection with Josh Garland and Andy Thomas. |
1350928321 | 2012-10-22 | Preliminary Restoration | No Violations | Area has been disked and seed has been laid down in the bare areas. The area around the well has roughly 60% vegetative cover. The piles of soil along the lease road have been removed. |
1457221030 | 2011-05-26 | Drill / Deepen / Reopen | No Violations | Surface cement job with Josh Garland and Andy Thomas. 7 casing in 8 3/4 hole. TD 282. Circulate last joint of 7 into hole. Red rock had swelled. Casing is being ran with out landing joint. 256.85 , 6 will be cut off after cement job for total surface casing of 250. Ran 50% excess cement and had slight cement returns to surface. Grouted back with remaining cement on truck. Cement top not at surface. Scheduled grout job for 5-27-11. No drilling to be done until 5-31-11. |
1556108188 | 2020-7-23 0:00: | PW | No Violations | 0.20 |
1612353360 | 2013-05-06 | Production Wells | No Violations | Verifying GPS location of well. No violations. |
194161178 | 2012-5-21 0:00: | PL | No Violations | 0.50 |
2054020700 | 2011-05-26 | Drill / Deepen / Reopen | No Violations | Surface cement job. With Josh Garland and Andy Thomas. Slight cement returns then cement fell back. Grout back scheduled for 27th. |
344376173 | 2012-4-13 0:00: | PL | No Violations | 0.50 |
346175157 | 2019-11-25 0:00 | PW | No Violations | 0.30 |
For data sources see[9]