If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-105-23646 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.11,"lon":-82.24,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Meigs | |
Municipality: Salem Township | |
Operator Name: OXFORD OIL | |
Well Pad ID: | |
Farm/Lease Name: TURNER THOMAS | |
License Status: Final Restoration | |
License Date: 2009-01-20 | |
Spud Date: 2009-02-10 | |
Spud Drilling Contractor: TEMPLE OIL & GAS | |
Final Drill Date: 2009-03-19 | |
Well Total Depth: 1633.00 ft | |
Configuration: Vertical | |
Latitude: 39.110000 | |
Longitude: -82.240000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-01-20 | Proposed Formations:BEREA THRU ORISKANY, Issued Date:1/20/2009, Expired Date:1/20/2010 6:00:00 AM, Drilling unit acres:148.13, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2009-03-19 | |
Plugged/Abandoned | 2009-08-12 | |
Completion Report Received | 2009-09-21 | |
Construction Permit Expires | 2010-01-20 | |
Record Last Modified | 2015-09-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2009-12-22 | 1500 | 1510 | 13 |
2009-12-22 | 1546 | 1556 | 13 |
1500 | 1510 | 13 | |
1546 | 1556 | 13 | |
1500 | 1510 | 13 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 2333 Bbl | 30000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | OXFORD OIL | 0.00 | 0.00 | 365 |
2009 | OXFORD OIL | 0.00 | 0.00 | 0 |
2010 | OXFORD OIL | 0.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | OXFORD OIL | Brine | 0 | 365 |
2009 | OXFORD OIL | Brine | 410 | |
2010 | OXFORD OIL | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1065703923 | 2012-5-2 0:00:0 | PW | No Violations | 0.30 |
-1677098936 | 2010-1-27 0:00: | FR | No Violations | |
-1741352680 | 2009-2-18 0:00: | DD | No Violations | |
-1760357980 | 2009-8-12 0:00: | PB | No Violations | |
-1928631555 | 2009-7-29 0:00: | PB | No Violations | |
-1985607409 | 2009-8-11 0:00: | PB | No Violations | |
-2087095523 | 2011-11-4 0:00: | FR | No Violations | 0.50 |
-307134809 | 2009-2-17 0:00: | DD | No Violations | |
-456654249 | 2009-8-7 0:00:0 | PB | No Violations | |
-459960212 | 2009-7-28 0:00: | AM | No Violations | |
-668205256 | 2009-8-3 0:00:0 | PB | No Violations | |
0019597118 | 2009-08-04 | Plug / Plug Back | No Violations | TD TOC plug at 1134. Attempting to rip 5.5. Pit is full. Tank not on location, Oxford water truck on location. |
0154562441 | 2014-12-01 | Preliminary Restoration | No Violations | Preliminary restoration passed, well plugged. |
0307134809 | 2009-02-17 | Drill / Deepen / Reopen | No Violations | Drilling at approx. 480 feet. There were no violations. |
0456654249 | 2009-08-07 | Plug / Plug Back | No Violations | Ripped 7 casing. 7 casing collapsed on tools. Will have to retrieve on Monday. |
0459960212 | 2009-07-28 | Administrative Inspection | No Violations | Received notification from Kevin Jones (Temple Oil And Gas) that they are ready to plug the well. |
0606614590 | 2011-10-20 | Administrative Inspection | No Violations | Spoke with Jack Green of Oxford. Work still not done on Puckett yet, but once finished will move onto restorations for this well. Extension granted to 11/20/11 for weather. |
0668205256 | 2009-08-03 | Plug / Plug Back | No Violations | Tag top of clay plug at 1569. Swab down to 1500. |
1065703923 | 2012-05-02 | Production Wells | No Violations | Areas are still bare. Called Jack Green. |
1315503043 | 2011-09-08 | Plug / Plug Back | No Violations | Pits closed, good grade, no drilling/plugging equipment on site, road restored. Two small areas 5x5 and 6x12 both shall be reseeded/mulched. FR not passed. |
1337090760 | 2012-05-15 | Final Restoration | No Violations | Areas have been seeded and mulched. |
1411536638 | 2009-02-18 | Drill / Deepen / Reopen | No Violations | Witnessed the installation and cementing of surface casing. Conditions were acceptable. |
154562441 | 2014-12-1 0:00: | PL | No Violations | 0.50 |
1671819288 | 2009-08-10 | Plug / Plug Back | No Violations | 7 ripped at 652. Was able to retrieve tools. Add 250 shovels clay then lost circulation. Recovered 612 of 7 casing. |
1677098936 | 2010-01-27 | Final Restoration | No Violations | Pit has been closed. Site has been graded. Site has sparse vegetative cover, 20% of location. No mulch has been applied to site. |
1741352680 | 2009-02-18 | Drill / Deepen / Reopen | No Violations | Witnessed surface job with Steve Ochs. |
1760357980 | 2009-08-12 | Plug / Plug Back | No Violations | TD top of Clay at 160. Shovel clay to surface. Cut off casing 30 bellow grade. Place id plate on casing. Backfill and rough grade the site with a dozer. Pit has water in it and needs to be pumped out before closing. Took pictures of site and pit. |
1779263342 | 2009-08-06 | Plug / Plug Back | No Violations | 34 joints of 4.5 casing pulled. 1065. There is a new pile of clay on site today. 100bbl tank has been placed on location to pump pit water into due to liner failure. Added 600 shovels full of clay to 7 casing. Ran tool down to 1032 no obstructions or bridges. |
1827329635 | 2011-10-17 | Final Restoration | No Violations | Restoration NOV follow up. Small areas around pits still bare. Not seeded/mulched. |
1928631555 | 2009-07-29 | Plug / Plug Back | No Violations | Plugging with clay. |
19597118 | 2009-8-4 0:00:0 | PB | No Violations | |
1985607409 | 2009-08-11 | Plug / Plug Back | No Violations | Pulling 7 casing. Shoveling clay. |
2087095523 | 2011-11-04 | Final Restoration | No Violations | Ground seeded, no cover yet. |
606614590 | 2011-10-20 0:00 | AM | No Violations | 0.20 |
For data sources see[9]