X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-105-23603

Well Details

Well ID: 34-105-23603
Loading map...
Country: United States
State: Ohio
County: Meigs
Municipality: Orange Township
Operator Name: MOUNTAINEER STATE OPERATIONS L
Well Pad ID:
Farm/Lease Name: MYERS
License Status: Producing
License Date: 2007-05-15
Spud Date: 2010-08-23
Spud Drilling Contractor: RAINBOW DRLG
Final Drill Date: 2010-10-03
Well Total Depth: 1944.00 ft
Configuration: Vertical
Latitude: 39.130000
Longitude: -81.910000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2007-05-15 Proposed Formations:BEREA, Issued Date:5/15/2007, Expired Date:5/14/2008 6:00:00 AM, Drilling unit acres:10, Proposed Well Type:OG, Proposed Well Class:POOL
Construction Permit Expires 2008-05-14 FROM INSPECTION REPORT THIS WELL IS PRODUCING(OLD STATUS IS DG AND DATE IS 8/23/2010) SINCE 2/4/2011. CHANGED WELL TYPE TO AD ON 8/2/108 DUE TIO PASSING MIT.
APP 2010-08-11 Proposed Formations:BEREA, Issued Date:8/11/2010, Expired Date:8/10/2012 12:00:00 PM, Drilling unit acres:10, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2010-09-03 CHANGE IN DISPOSAL PLAN, NOW USING ANNULAR DISPOSAL & ADDITION OF PERMIT CONDITION.
Reached Total Depth 2010-10-03 FROM INSPECTION REPORT THIS WELL IS PRODUCING(OLD STATUS IS DG AND DATE IS 8/23/2010) SINCE 2/4/2011. CHANGED WELL TYPE TO AD ON 8/2/108 DUE TIO PASSING MIT.
Change of Owner 2014-03-25 Operator changed from 7946, RAINBOW OIL & GAS to 8473, MOUNTAINEER STATE OPER LLC
Completion Report Received 2017-08-11 FROM INSPECTION REPORT THIS WELL IS PRODUCING(OLD STATUS IS DG AND DATE IS 8/23/2010) SINCE 2/4/2011. CHANGED WELL TYPE TO AD ON 8/2/108 DUE TIO PASSING MIT.
Last Compliance Report 2018-07-02 FROM INSPECTION REPORT THIS WELL IS PRODUCING(OLD STATUS IS DG AND DATE IS 8/23/2010) SINCE 2/4/2011. CHANGED WELL TYPE TO AD ON 8/2/108 DUE TIO PASSING MIT.
Record Last Modified 2018-07-02 FROM INSPECTION REPORT THIS WELL IS PRODUCING(OLD STATUS IS DG AND DATE IS 8/23/2010) SINCE 2/4/2011. CHANGED WELL TYPE TO AD ON 8/2/108 DUE TIO PASSING MIT.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-10-09 1838 1854 30
1838 1854 30
1838 1854 30

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 1400 Bbl 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2011 MOUNTAINEER STATE OPERATIONS L 5059.00 2336.00 0
2012 CARL E SMITH PETROLEUM INC 6008.00 1604.00 365
2013 CARL E SMITH PETROLEUM INC 10335.00 1526.00 365
2014 CARL E SMITH PETROLEUM INC 9499.00 1213.00 365
2015 MOUNTAINEER STATE OPERATIONS L 1344.00 232.00 365
2016 MOUNTAINEER STATE OPERATIONS L 2459.00 372.00 365
2017 MOUNTAINEER STATE OPERATIONS L 2945.00 618.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2011 MOUNTAINEER STATE OPERATIONS L Brine 0
2012 CARL E SMITH PETROLEUM INC Brine 0 365
2013 CARL E SMITH PETROLEUM INC Brine 208 365
2014 CARL E SMITH PETROLEUM INC Brine 876 365
2015 MOUNTAINEER STATE OPERATIONS L Brine 0 365
2016 MOUNTAINEER STATE OPERATIONS L Brine 0 365
2017 MOUNTAINEER STATE OPERATIONS L Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1316640844 2011-8-29 0:00: PL No Violations 0.50
-1483664155 2019-4-29 0:00: AD No Violations
-161679604 2017-9-25 0:00: PW No Violations 0.50
-1693338861 2011-2-4 0:00:0 PW No Violations
-212229945 2017-5-19 0:00: AD No Violations 2.50
-267199162 2010-11-29 0:00 AD No Violations
-304324037 2010-9-22 0:00: DD No Violations 4.50
-482296280 2017-7-24 0:00: AD No Violations 4.50
-558567193 2018-8-13 0:00: PW No Violations
-585742174 2010-9-30 0:00: DD No Violations
0149996870 2011-10-11 Preliminary Restoration No Violations Grass seed has germinated and Preliminary Restoration passed.
0161679604 2017-09-25 Production Wells No Violations The annular disposal connections have been hooked back up and since the successful test has since been put back into production using annular disposal.
0212229945 2017-05-19 Annular Disposal No Violations Inspection this day found that the line to the 40 barrel poly tank was connected. From the access lane you pass two 100 barrel steel tanks in the dike on the left of the access road. The dike consists of the two 100 barrel steel tanks and a vertical separator and a drip. Inside the dike is the cam lock connection used to switch between running water down to the poly tank and running water over the hill to a steel 100 barrel with a 3 inch loading line running back up the lease road. The annular disposal line connected to the casing head sits just below ground level and I was able to see it today because the area was recently trimmed. There is another line running to the top of the poly tank from the opposite side of the casing head that looks to be 3/4 flexible rubber hose that allows the excess to go back into the poly tank. Pictures were taken to corroborate my findings.
0267199162 2010-11-29 Annular Disposal No Violations AD test. Test pressure 287 psi. Tested annulus, begin pressure 290 psi for one hour, end pressure at 288 psi.
0304324037 2010-09-22 Drill / Deepen / Reopen No Violations Witnessed 4.5 cement job. TD 1970. Ran 1963 of 4.5 used casing 10.5 lb. Water was circulated to surface prior to cement job.
0482296280 2017-07-24 Annular Disposal No Violations This well failed the annular disposal criteria three times today. Test one 318 psi start. After 30 minutes pressure fell to 314 psi. Test two 314 psi start. 310 psi after one hour. Test three 310 start 308 after 30 minutes. The company representatives decided to try another day.
0558567193 2018-08-13 Production Wells No Violations Well is equipped with a pumping unit, tubing, rods, and an electric motor. The well is also equipped for annular disposal. The tank battery consists of 2-100 barrel steel tanks and one steel tank over the hill for brine. There is also a small 40 barrel plastic tank for the annular disposal near the wellhead.
0585742174 2010-09-30 Drill / Deepen / Reopen No Violations Witnessed frac job by Universal Well Service.
0720301799 2018-05-03 Production Wells No Violations This well is in production and has proper identification posted at the well location. The connections for the annular disposal were liquid tight.
1057299407 2017-03-13 Production Wells No Violations Inspection found a well with a pumping unit, tubing, rods and an electric motor. Well was pumping during my inspection. Tank battery consisted of 2-100 barrel steel tanks and a vertical separator. There is another 100 barrel steel tank over the hill that was used for annular disposal however the fittings for that have been disconnected and a three inch unloading line is plumbed to the top of the hill.
1283890676 2010-08-29 Drill / Deepen / Reopen No Violations Surface job. TD 547. 9.5 hole. Ran 547 of 7 casing. Achieved circulation to surface with gel and fresh water. Pumped cement. Had good cement returns to surface.
1316093995 2011-09-15 Drill / Deepen / Reopen No Violations Preliminary restoration follow-up. Re-graded and erosion control employed, seeded/mulched. Seed has not germinated yet.
1316640844 2011-08-29 Preliminary Restoration Violations Noted Pits closed and area graded, however vegetative cover not fully established and minimal erosion has occurred on site. Well has sufficient identification. Preliminary Restoration passed.
1483664155 2019-04-29 Annular Disposal Violations Noted Our records indicate that the Division has not received the Annular Disposal Annual Report (Form 205) that was due on April 15th for 2018, Please submit the Form 205 to the Division by 5/29/2019.
149996870 2011-10-11 0:00 PL No Violations 0.50
1502123548 2017-08-01 Annular Disposal No Violations I witnesed this wells annular disposal test. The test was originally started at 312 psi at 1:15 pm. I started the test over at 1:25 pm at 307 psi. At 2:25 pm the test pressure was at 306 psi. This was a drop of less than 1% and resulted in a successful test.
1693338861 2011-02-04 Production Wells No Violations Good identification. Well is equipped with 2 100 bbl steel tanks, mechanical separator, tubing, rods, pump jack, electric motor. Production line, and meter. Well is in production. Pit has been pumped out and partially closed. Site is too muddy for grading at this time.
1809636602 2017-07-20 Production Wells No Violations Went to check on the progress of this well to see if the test would be administered today.
720301799 2018-5-3 0:00:0 PW No Violations 0.50

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1316640844 US-OH-108892 2011-08-29 Failure to restore within six months
1483664155 US-OH-113769 2019-05-09 Failure to file Annular Disposal Report

For data sources see[9]

References